TO: BOARD OF SUPERVISORS
Contra
FROM: HARVEY E BRAGDON « S
Costa
DIRECTOR OF COMMUNITY DEVELOPMENT ._' P County
ST,A.d.__2yrt�
DATE: May 7, 1996
SUBJECT: Ratification of the Zoning Administrator's Decision Regarding Shell Oil
Company's Compliance with Conditions of Approval (LUP 2009-92)
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) & BACKGROUND AND JUSTIFICATION
RECOMMENDATIONS
Ratify the Zoning Administrator' s decision that Shell Oil Company
has complied with Condition of Approval #22 for the Heavy Gasoline
Hydrotreater, the Vent Gas Treater, the Caustic Regenerator Unit
No. 2 and the Distillate Hydrotreater.
FISCAL IMPACT
None.
BACKGROUND/REASONS FOR RECOMMENDATIONS
When the Board of Supervisors approved the Land Use Permit for
Shell Oil Company' s Clean Fuels Project (County LUP #2009-92) , the
Board specified that the Zoning Administrator' s decision regarding
several conditions of approval be placed on the Board' s consent
calendar for ratification. As directed by the Board at the October
4, 1994 meeting, the County Zoning Administrator decisions
discussed herein have been placed on the Zoning Administrator' s
agenda for April 15, 1996. There were no comments rec ive at the
hearing.
CONTINUED ON ATTACHMENT: XX YES SIGNAT
RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDA ION OF A8ARD COMMITTEE
APPROVE OTHER
SIGNATURE (S) :
ACTION OF BOARD ON May 7 , 1996 APPROVED AS RECOMMENDED x OTHER.
VOTE OF SUPERVISORS
I HEREBY CERTIFY THAT THIS IS A
x UNANIMOUS (ABSENT TRUE. AND CORRECT COPY OF AN
AYES: NOES: ACTION TAKEN AND ENTERED ON THE
ABSENT: ABSTAIN: MINUTES OF THE BOARD OF
SUPERVISORS ON THE DATE SHOWN.
Contact: Catherine Kutsuris (510/335-1237) ATTESTED May 7 , 1996
cc: Community Development Department (CDD) PHIL BATCHELOR, CLERK OF
Health Services Department: RMPP THE BOARD OF SUPERVISORS
Shell Oil (via CDD) AND COUNTY ADMINISTRATOR
BY a , DEPUTY
cox\aw
ck(2)\sh14-16.bo
,1.
Ratification of decision on Shell Oil Company
May 7, 1996
Page Two
Condition of Approval #22 : Hazard and Operability Study
This condition requires Shell Oil to prepare a Hazard and
Operability Study and accident consequence analysis for all
elements of the Clean Fuels Project with the exception of the
office building, the control rooms and the maintenance/warehouse
buildings.
Shell Oil Company completed the required study for the Heavy
Gasoline Hydrotreater, the Vent Gas Treater, the Caustic
Regenerator Unit No.2 and the Distillate Hydrotreater. This
information was evaluated by the Risk Management and Prevention
Program Team of the Health Services Department. Their review
included a detailed line-by-line examination of the Hazard and
Operability Studies for these units which includes a review of the
safety system designs and operational and maintenance programs .
The Health Services Department staff has field checked the units,
which are still under construction, to verify that they conform to
the design presented in the Hazard and Operability Studies .
COK/aw
j:\audrey\sh14-16.bo
Contra Costa County
COSTA
' r Health Services Department {
ENVIRONMENTAL HEALTH DIVISION APR - I PN 4: ►4
HAZARDOUS MATERIALS/OCCUPATIONAL HEALTH
b E VEL0PkIiENT DEPT
DATE: March 25, 1996
TO: Catherine Kutsuris, County Zoning_ Administrator, Community Development
Department
FROM: Lewis G. Pascalli,
Deputy Director
Health Services Department, azardo Materials Division
SUBJECT: CONSENT ITEM FOR SHELL REFINERY CLEAN FUELS PROJECT
CONDITION #22, FOR THE:
HEAVY GASOLINE HYDROTREATER,
VENT GAS TREATER,
CAUSTIC REGENERATOR UNIT NO. 2, AND
DISTILLATE HYDROREATER
Executive Summary•
The Contra Costa County Health Services Department (CCCHSD) Hazardous Materials Risk
Management and Prevention Program team has completed the Clean Fuels Project review for the
Heavy Gasoline Hydrotreater (HGHT), Vent Gas Treater (VGT), Caustic Regenerator Unit
No. 2 (CR#2) and the Distillate Hydrotreater (DHT). Shell plans to start-up the HGHT, VGT
and CR#2 about July 1, 1996 and the DHT about October 1, 1996. Shell submitted a summary
of the. Hazard and Operability Studies (HAZOP) to you and CCCHSD on July 13, 1995
(HGHT), September 24, 1995 (VGT), July 5, 1995(CR-2) and January 2, 1996 (DHT).
CCCHSD Findings:
My staff has performed a detailed line-by-line examination of the HAZOP studies for these units
that included our reviewing the design of safety systems as well as operational and maintenance
issues. Additionally, my staff has field checked the units, which are still under construction, to
verify that they basically conform to the design presented in the HAZOP.
4333 Pecheoo Boulevard • Martinez, Califomia 94553 • (510) 646-2286
.. 03'
� 1
We find that the Shell HAZOP studies adequately identify process hazards and safeguards, and
that additional engineering or operational controls are not required.
CCCHSD Recommendation*
We recommend your approval of the HAZOP studies for the Heavy Gasoline Hydrotreater, Vent
Gas Treater, Caustic Regenerator Unit No. 2 and the Distillate Hydrotreater in accordance with
Condition 22'.
Condition 23:
Prior to start-up my staff will ensure that, consistent with Condition #23, Shell demonstrates to
our satisfaction that the measures detailed in the approved HAZOP studies have been
implemented. We will notify you in writing of our findings so you can seek Board of
Supervisors ratification of compliance with Condition 23.
Request to Speak Form
_ D, 3
( THREE (3) MINUTE LIMIT)
Complete this form and place It in the box near the speakers' rostrum
before addressing the Board
Name; 6 � planes 313 - -3 Z cS
L
Ad VA A
V\3, FvQ6k54v%
I am WeaWng for myself ororganization:
gem of o�anisadioN
WEC K ONE: