HomeMy WebLinkAboutMINUTES - 04231996 - C22 TO: BOARD OF SUPERVISORS AS GOVERNING BODY OF THE CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT FROM: J. MICHAEL WALFORD, CHIEF ENGINEER DATE: April 23, 1996 SUBJECT: Reject Bids Received on April 2, 1996 and Authorize Readvertising for Bids for the San Ramon Creek Drop Structure No. 7 Rehabilitation project, Project No. 7520-668469-96, Danville area. peci is Request(s) or Recommendation(s)&Bac group us i ica ion I. Recommended Action: REJECT all bids received on April 2, 1996 for the San Ramon Creek Drop Structure No. 7 Rehabilitation Project, and The Board Orders that any bid bonds posted by the bidders are to be exonerated and any checks or cash submitted or security shall be returned. READVERTISE for bids to be received on Tuesday, May 21, 1996. DIRECT the Clerk of the Board to publish the Notice to Contractors in accordance with Section 20392 of the Public Contract Code. II. Financial Impact: The estimated contract cost of the project is $61,000.00. It is to be funded by Flood Lone 36 (100%). 111. Reasons for Recommendations and Background: The Plans and Specifications for the San Ramon Creek Drop Structure No. 7 Rehabilitation Project were approved and the project was advertised on March 5, 1996. The Chief Engineer requests that the Board exercise its discretion to reject the bids and readvertise the above project. Continued on attachment: X yes SIGNATURE: % RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON: April 23, 1996 APPROVED AS RECOMMENDED X OTHER - I VOTE OF SUPERVISORS X UNANIMOUS (ABSENT AYES: NOES: ABSENT: ABSTAIN: Contact: Joseph P. Murphy, (510) 313-2321 Orig. Div.: PW(Constr) cc: County Administrator ' Auditor-Controller Iherebycertifythat this isatrueandcorrectcopy e Public Works Board�of Supero sors on the date shown.he minutes of the Design,V. GermanyY ATTESTED- - Accounting, R. Gilchrist PHIL BAT HELUB, Clerk of the Board R. Bruno of supervisors and county Administrator Contractor ,Deputy RB:tt g:\const\BO\SR7-23.t4 Reject San Ramon Creek Drop Structure No.7 Rehabilitation Project No.7520-6B8469-96 Board Date: April 23, 1996 Page 2of2 The pro.ect includes repair of failed subdrainage systems at Drop Structure No. 7 on San Ramon reek. This site was part of a larger project last year that was to repair/rehabilitate five drop structures. However, the work took longer than expected and the Department of Fish and Game permit would have expired before the Contractor was able to complete the work at Drop Structure No. 7. Therefore, repairs at Drop Structure No. 7 were not done. The Chief Engineer has filed with the Board of Supervisors the Plans and Specifications for the project. IV. CONSEQUENCES OF NEGATIVE ACTION: If bids are not rejected and the project not readvertised, it will not be constructed.