HomeMy WebLinkAboutMINUTES - 02061996 - D7 �e TO: BOARD OF SUPERVISORS Contra PHIL BATCHELOR, COUNTY ADMINISTRATOR FROM: WILLIAM B. WALKER, M.D., HEALTH SERVICES DIRECTOR s Costa County DATE: February 1' 1996 - = qsq.count � SUBJECT: SAFETY AUDIT OF UNOCAL'S SAN FRANCISCO REFINERY AT RODEO SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION RECOMMENDATIONS: 1. APPROVE the attached Scope of Work for the Safety Audit of the Unocal Refinery which details the work that will be done by the contractor the County will hire. 2 APPROVE and AUTHORIZE the Chair, Board of Supervisors, to sign the attached contract between Unocal and the County of Contra Costa providing for the conditions under which the Safety Audit of the Unocal Refinery will be conducted. 3. AUTHORIZE the Health Services Director to send out a Request for Proposals (RFP) for contractors interested in conducting the Safety Audit and DIRECT the Health Services Director to return to the Board with a recommendation for awarding a contract with the firm which is believed to be the most competent to conduct the Safety Audit. BACKGROUND: On July 11, 1995, in response to a series of incidents which had occurred at the Unocal Refinery in 1994 and 1995, the Board of Supervisors directed that the staff undertake a Safety Audit of the Unocal Refinery located in Rodeo. It should be noted that substantial action had already been taken in response to these incidents, including the fact that on April 7, 1995, Unocal entered into a Good Neighbor Agreement with community groups in the Crockett/Rodeo area, which included an audit CONTINUED ON ATTACHMENT: YES SIGNATURE: 14/4/r RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER l SIGNATURE(S): 2i�_! vpv ACTION OF BOARD ON February 6, 1996 APPROVED AS RECOMMENDED OTHER X IT IS BY THE BOARD ORDERED that Recommendations Nos. 1 and 3 are APPROVED as presented; and Recommendation No. 2 is APPROVED, as amended, with reference to contract condition No. 18 to include that the Zoning Administrator will observe the public hearing and comment process and that this contract in no way abridges the 'right to appeal or other process as determined by the County. VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A TRUE UNANIMOUS(ABSENT ) AND CORRECT COPY OF AN ACTION TAKEN AYES: NOES: AND ENTERED ON THE MINUTES OF THE BOARD ABSENT: ABSTAIN: OF SUPERVISORS ON THE DATE SHOWN. ATTESTED February 6, 1996 Contact: County Administrator PHIL BATCHELOR,CLERK OF THE BOARD OF cc: Supervisor Smith Supervisor Rogers SUPEAVISORS AND COUNTY ADM INISTRAT R Health Services Director County Counsel General Manager, Unocal(Via CAO) B p.7 . by an outside contractor. This audit included a review of the Refinery's emergency response plan, emergency notification procedures, safety management program, and the results of process hazards analyses performed as part of the Process Safety Management Program which is mandated by California's Occupational Safety and Health Administration. This audit was completed in August, 1995 and a follow-up audit by the same contractor was completed in January, 1996. On September 12, 1995, the Board of Supervisors approved the general direction for the conduct of the Safety Audit of the Unocal Refinery and directed that the staff return the final Scope of Work to the Board for approval before releasing it in the form of an RFP to potential contractors. Staff determined that it would be preferable to return to the Board with the Scope of Work and the contract between Unocal and the County at one time so both documents could be approved at the same time, particularly since the Scope of Work is an attachment to the contract and needs to be viewed in the context of the entire contract. The first document that is attached is the Scope of Work which is the technical document that outlines in considerable detail the twelve areas which will be covered by the Audit and the technical benchmarks against which Unocal's performance will be compared. The bulk of this document consists of 11 attachments which detail the content of the Audit. The Scope of Work is an attachment to the contract discussed below. The first three pages which are attached on top of the Scope of Work are the comments which were received by County staff to the draft Scope of Work which was circulated to a variety of groups and individuals in August, 1995 for public comment, along with the responses which were made to each of the comments that was received. Each individual who made written comments has received a detailed written response from staff. Staff from the Hazardous Materials Section of the Health Services Department's Environmental Health Division are available to respond to any questions Board members or others may have regarding the content of the Scope of Work. This is Exhibit 1 to the contract. The second document is the actual contract between Unocal and the County which, along with the Scope of Work, details the comprehensive Safety Audit package. The contract includes these major elements: Unocal will pay for the Audit, based on the Scope of Work. There will be two Project Managers during the Audit, one for Unocal and one for the County. These Project Managers will be the sole points of contact between Unocal and the County for the purposes of the Audit. There will be an Audit Monitors Group consisting of seven members, two of whom will be Supervisors Smith and Rogers. This Group will also include . a representative from the Oil, Chemical and Atomic Workers Union and four community representatives, selected by the Board of Supervisors. The four community members must be residents of the immediate Rodeo, Tormey, Crockett community and may not have commenced any legal action against Unocal, or be the spouse of or be employed by anyone who has commenced legal action against Unocal. The Audit Monitors Group will participate in the selection of the contractor who will actually conduct the Audit. In addition, the Audit Monitors Group may designate one of its members (who may be rotated or changed as frequently as the Group wishes) to be present at and directly observe all work performed by the contractor, except for formal interviews of Unocal employees. This Designee is to report back to the Audit Monitors Group as the Group dictates. These restrictions are being included as a safety measure because of the fact that the meetings of the Audit Monitors Group must be open, public meetings pursuant -2- to the Ralph M. Brown Act and the County's Better Government Ordinance. It is neither safe or practical to conduct a meeting on-site at the Refinery if that meeting is open to the entire public. The Contractor Selection Panel that will review the responses to the RFP and recommend a contractor to the Board of Supervisors will include the members of the Audit Monitors Group and the two Project Managers or their designees, State OES and Cal-OSHA will be invited to participate in the Contractor Selection Panel. The safety precautions which must be observed by anyone participating in the Audit are identified. The work which will be undertaken by the contractor is outlined in brief, and is more fully detailed in the Scope of Work. The conditions which will control interviews of Unocal employees in order to maintain the confidentiality of their comments to the contractor are outlined. The deliverables which will result from the Audit are defined, including auditing protocols for each of the subjects defined in the Scope of Work, a final Audit Report and the process by which the final Audit Report will be released. The contract also anticipates a follow-up review and evaluation in approximately six months to determine what actions Unocal has taken as a result of the Audit. The contract also contains fairly standard contract provisions covering the cost of the audit, invoices, changes in work, access to the Refinery site, indemnification and insurance provisions. The third document that is attached is an updated schedule of work for the Safety Audit, showing the work which has been accomplished to date, the work that remains to be done and when it is anticipated that each additional task will be undertaken and completed. This is Exhibit 2 to the contract. We should note that the Bay Area Air Quality Management District is not a party to the contract, although their representatives have been consulted at each stage of the development of the Scope of Work and contract. Likewise, it is important to note that the contract recognizes that the Board of Supervisors has no jurisdiction over the prosecutorial responsibilities of the District Attorney or the responsibility of the Health Services Director to enforce State laws. In this way, those independent enforcement responsibilities are clearly acknowledged. We must emphasize that the contract and the Scope of Work in the form in which they are now before the Board of Supervisors have been approved by Unocal and County staff following consultation among the parties. Any changes which may be desired to either of these documents will result in staff's having to meet again with Unocal representatives and will further delay the start of the Audit. -3- Facts about the Unocal Audit and Oversight Committee Who will be on the Oversight Committee? • Four residents of Crockett, Tormey, and Rodeo who are not currently litigants against Unocal; • One representative of the Oil, Chemical and Atomic Workers International Union, chosen by OCAW; • Two members of the Board of Supervisors(from Districts I and II). How can other people participate? All Oversight Committee meetings are public meetings because they are covered by the State Brown Act and the County Better Government Code. Under the law, meetings and agendas must be announced 96 hours in advance, and agendas must include a public comment period. The Committee determines its meeting schedule and agendas. What will the Committee do? Committee responsibilities include: • Helping to select the auditor; • Review of audit protocol; • Oversight of the audit o selection of a Committee member as monitor to accompany the auditor(may rotate among Committee members) and report back to the full Committee (the report back is a public meeting); o meet with the auditor to discuss the auditor's final report(a public meeting). What will the audit cover? An audit is defined as "A systematic, independent review to verify conformance with established guidelines or standards. It employs a well-defined review process to ensure consistency, and to allow the auditor to reach defensible conclusions." The audit will be conducted at the Unocal San Francisco Refinery and will cover the entire facility. The audit will address operations, maintenance, engineering, and administration. It will include the following specific elements: 1. review of the findings from the independent safety audit conducted at the Unocal Refinery pursuant to the Unocal Good Neighbor Agreement which included an audit of the Refinery's a. emergency response plan, b. emergency notification procedures, c. safety management program, and 1 d. the results of process hazards analyses performed as part of the Process Safety Management Program; 2. review of Unocal corrective action plans, and the status thereof,which resulted from nonprivileged Unocal incident investigation records from 1992 to present ("nonprivileged"means all documents that are not covered by attorney-client privilege); 3. review/evaluation of selected written operating procedures for the process units; 4. review/evaluation of the Operator Training Program including applicable training on operating procedures, emergency shutdowns, emergency response/notification procedures, and certification of employees; 5. review/evaluation of contractor training program and standards for contractor qualifications; 6. review of Unocal oversight of contract workers; 7. review of the quality assurance program for positive materials (equipment) identification and confirmation of satisfied design standards; 8. review of the preventive and predictive maintenance program including the frequency of inspections and standards for determination of acceptable testing/inspection results; 9. review/evaluation of the Unocal Management of Change program and implementation of the program; 10. review/evaluation of a portion of Unocal's Loss Control Management policies and procedures; 11. review of the status of the Unocal action items resulting from the Catacarb release (corrective action plan); and 12. review of Unocal's corrective action plans addressing the Bay Area Air Quality Management District findings and recommendations that have been provided to Unocal regarding five incidents beginning in August 1994 (the Catacarb release)through the tank fire of June 1995. This fact sheet was prepared by the Contra Costa County Health Services Department. For more information, call Randy Sawyer at(510)646-2286. 2/6/96 UNOCAL SAFETY AUDIT SCOPE OF WORK COMMUNITY COMMENTS AND THE COUNTY'S ACTION The County's staff prepared a Draft Scope of Work for a safety audit of the Unocal Refinery. The Draft Scope of Work was issued for public comment in August 1995. Listed below are the comments received and (in bold) the action that was taken by staff. Staff has responded in writing to everyone who wrote comments on the draft. COMMENTS INCORPORATED IN THE FINAL SCOPE OF WORK • Examine all programs,ams• including pay for performance and other bonus programs and all systems including loss control and emergency response systems- not just some of them.We have added a section to the audit called General Promotions to review Unocal's bonus plans for safety and loss control. • Evaluate the effectiveness of procedures for all handling and transfers (including disposal) of recoverable oils or waste products. We have changed the audit to specify how operating procedures will be reviewed. The selection will be based on the prioritization listing of the units that the refinery developed for Process Safety Management regulations. • Odor abatement compressors at the sulphur plant keep failing. Please review the incident logs for the past few years. These compressors were put into service in the early 1940's. Maybe they should be replaced? We have specifically listed that the odor abatement compressors will be reviewed and audited. • Include in the safety audit to close the loop of the audit such as the Good Neighbor Agreement Audit. We have added the provisions fora follow-up by the auditor to determine that Unocal has implemented an action plan to address the findings of the audit. COMMENTS ALREADY ADDRESSED BY THE AUDIT • Look at operation at the entire refinery-not just part of it. The whole refinery will be reviewed. • Analyze how all programs and systems work at every level in the plant itself, not just by reviewing them on paper and by interviewing management staff in detail. Extensive site inspections and line level and contract workers interviews should be included. The audit will include inspections and interviews of the frontline employees, contract employers and contract employees. • Evaluate public notification procedures and decision-making in the event of release through pressure relief valves. Public notification was part of the Good Neighbor Audit, and the Leadership and Administration section of this audit will review Unocal's public notification. • Not only the findings of the Good Neighbor Audit, but the protocols,actual approach, and thoroughness of that audit should be evaluated. The protocols and approach of the Good Neighbor Audit were determined by Unocal and the community. We are not addressing Page #1 - 1• c Y � those in this audit. The County's audit, however will review the findings of the Good Neighbor Agreement's audit. COMMENTS BEING ADDRESSED BY OTHER ACTION The actions being taken by staff are expected in all cases to answer the concerns of the commenters more quickly than would the audit. • Review of Unocal's Risk Management and Prevention Plan to review acutely hazardous materials(only 3!)due this year. This will be done by the County's staff in their RIVIPP review. The findings of the audit will be incorporated in the County's RMPP review. • The list of incidents on page one under background should also include the following two incidents. We are following up with Unocal on these incidents and will get back with the person making the comment. • Evaluate the methods used by Unocal for testing employee exposure to toxic chemicals, such as benzene, including blood vs. Urine tests, etc. We have asked Unocal to give us information on their testing process. We have also followed up with Cal\OSHA, the agency which determines the evaluation process for such testing. When we have a response,we will get back to the individual making the comment. • Determine the number of relief valves that vent to atmosphere and options for use of recovery and containment systems to prevent release to the atmosphere and environment. An audit requires that each item reviewed be measured against an established regulation or standard. Since there is no regulation or standard to measure against with regard to relief valves we are instead working with the Air District in evaluating relief valves venting to the atmosphere. • The County's audit process must better integrate community participation. CBE, community groups, and the GNA audit committee should be given an opportunity to comment on the audit protocol. An oversight committee,which includes community participation,will be established by the Board of Supervisors and will participate in developing the audit protocol. CBE, Community groups, and the GNA audit committee should be included in the periodic meetings with the County staff to discuss progress on the audit, or separate provision should be made to ensure that they are kept updated. The GN audit oversight committee is an appropriate group to involve in this manner, though such committees should assume responsibility for reporting back to their constituencies. The Board of Supervisors'has designated the oversight committee for this task. Community should be permitted to accompany the auditor in some key aspects of the audit process. These include: site visits, tours, equipment inspections, onsite technology evaluations as noted above, employee interviews,record and document review, and review of preventive and predictive maintenance. The oversight committee will be included in all parts of the audit. The audit should evaluate and make recommendations for additional and Page #2 •�- -; Y 7 improved community participation in the future and not rely on the GNA in which Unocal shifts ongoing audit oversight to only the CAP, which exempts CBE, SEA, and other key stakeholders. The Community Advisory Panel was appointed by Supervisor Smith and was open to anyone who wanted to participate. • It is my hope that the County's audit will be able to identify the source(s) of CS2 emissions so that they can be brought to an end. We have not included this in the audit since there is no standard or regulation for carbon disulfide emissions. We asked Unocal to respond to this issue and they have done so. The people who made this comment have been informed of Unocal's response. Further,we have asked the State's Department of Health Services for more information concerning the toxicity of carbon disulfide. • Is dioxin released to the atmosphere during the generation phase of H2O treatment?We are following up with Unocal on this issue. • What happens to the sludge from the API Separator? Does it end up at the Coker? We have asked Unocal for a response to this question. Additionally,we are following up with the Regional Water Quality Control Board on the dioxin that may be in the water. • Unocal has complete files of MSDS's for purchased components as required. We propose that they go one step further and generate MSDS's for resulting mixtures on-site. Recall the absence of the mixture Catacarb MSDS was a big problem last year. We asked Unocal to respond to this concern and have passed the response on to the person making the comment. • Eight hundred pounds of diethanol amine are added to the Catacarb unit every week. Just recently we have determined that about 100 pounds is diverted to water treatment and another 20 pounds removed by filter. What happens to the rest of it? We asked Unocal to respond to this concern and have passed the response on to the person making the comment. Unocal is investigating what happens to diethanol amine in the Catacarb Unit and we will pass on the results of this investigation,when it is available. • The Hayward fault has been characterized as the same type as the Kobe fault. What type of damage occurred in chemical plants and refineries around Kobe? We have reviewed a report that was published by the consulting firm EQE and have talked with EQE on the Kobe earthquake. There were no petrochemical plants near Kobe. We have offered this report for review to the person who made the comment. • Use RMPP as a model for reviewing the safety of all other hazardous materials and their handling at Unocal. This is being accomplished through Process Safety Management, regulated by Cat\OSHA. Process Safety Management includes flammables,which would include.most of the refinery not already regulated by the RMPP. • The County's review should evaluate safety technologies and inherent safety enhancement options (primary and secondary prevention strategies) for continuously improving accident prevention at Unocal. Again there are no standards or regulations for inherent safety. Inherent safety, however, is part of the RMPP review. Page 93 P,7 Unocal, San Francisco Refinery Safety Audit of the Rodeo Facility Statement of Scope Background Past incidents that have occurred at the Unocal Refinery are of concern to the residents of the Hercules, Rodeo, Tormey, and Crockett areas. Incidents that have recently occurred are: the Catacarb release that began on August 22, 1994 and continued through September 6, 1994 originating from the Unocal Regeneration Tower D409; a hydrogen sulfide release on 9/15/94 caused by an unplanned shutdown of the odor abatement compressors; public nuisance at Hillcrest School due to odors on 3/28/95 caused by an open hatch on Tank 150 which contained sour oil and water; odor complaints on 4/6/95 and 4/24/95 originating from Tank 294 which contained sour water; and a seal fire and subsequent odors on June 16, 1995 at Tank 288, containing sour naphtha and sour water. In response to these incidents, the Contra Costa County Board of Supervisors has directed the County Counsel, County Health Services Department, County Administrator, Community Development Department, and requested the Bay Area Air Quality Management District to develop a contract with Unocal to define a scope for a thorough Safety Audit of the Rodeo facility. Of additional interest is that on April 7, 1995 the Unocal, 76 Products Company entered into a Good Neighbor Agreement with community groups in the Crockett/Rodeo area. A portion of the Good Neighbor Agreement requires an independent audit (by a contractor) of the Refinery's emergency response plan, emergency notification procedures, safety management program, and the results of process hazards analyses performed as part of the Process Safety Management Program (mandated by California's Occupational Safety and Health Administration). Requirements The Contra Costa County Board of Supervisors has directed that the Safety Audit of the Refinery will include the following: evaluation of actions to prevent future failures such as operational changes, policy changes, increased or focused maintenance, new training and certification of employees, and other appropriate actions; assurance of methods for proper prioritization of action items and auditing to ensure completion of action items; and a provision for public input on audit scope issues. Scope of Work The audit wi!I be conducted at the Unocal San Francisco Refinery and will include the following elements: 1. review of the findings from the independent safety audit conducted at the Unocal Refinery pursuant to the Unocal Good Neighbor Agreement which included an audit of the Refinery's a. emergency response plan, b. emergency notification procedures, c. safety management program, and d. the results of process hazards analyses performed as part of the Process Safety Management Program; 2. Review of Unocal corrective action plans, and the status thereof, which resulted from nonprivileged Unocal incident investigation records from 1992 to present; 3. review/evaluation of selected written operating procedures for the process units; 4. review/evaluation of the Operator Training Program including applicable training on operating procedures, emergency shutdowns, emergency response/notification procedures, and certification of employees; 5. review/evaluation of contractor training program and standards for contractor qualifications; 6. review of Unocal oversight of contract workers; 7. review of the quality assurance program for positive materials (equipment) identification and confirmation of satisfied design standards; 8. review of the preventive and predictive maintenance program including the frequency of inspections and standards for determination of acceptable testing/inspection results; 9. review/evaluation of the Unocal Management of Change program and implementation of the program; 10. review/evaluation of a portion of Unocal's Loss Control Management policies and procedures; 11. review of the status of the Unocal action items resulting from the Catacarb release (corrective action plan); and 12. review of Unocal's corrective action plans addressing the Bay Area Air Quality Management District findings and recommendations that have been provided to Unocal regarding the incidents listed above in Background. 1 Page 2 � 7 The audit will include a review and.evaluation of the applicable programs, policies, procedures, and records with respect to the criteria delineated below. 1. Review of the findings from the independent safety audit conducted at the Unocal Refinery pursuant to the Unocal Good Neighbor Agreement. Review of the findings from the evaluation of the Refinery's Emergency Response Plan and procedures manualfor determination of the level of compliance with the requirements of 8 CCR 5192(q). Review of the findings of the evaluation of the facility's past performance in implementing the Emergency Response Plan and the effectiveness thereof. Review of the evaluation of the effectiveness of the Refinery's Emergency Notification Procedures. Review of the evaluation of the Refinery's Injury and Illness Prevention Program for determination of the program's level of compliance with the requirements of 8 CCR 3203. The audit of the Injury Illness and Prevention Program will include safe and healthy work practices, communication to employees regarding occupational health and safety and reporting of hazards to the employer, procedures for identifying and evaluating work place hazards, procedures to investigate occupational injuries or illnesses, and methods for correcting unsafe working conditions. Review of the evaluation of the Refinery's Process Hazards Analyses for determination of the analyses level of compliance with the requirements of 8 CCR 5189(e). 2. Review/evaluate Unocal's Incident Investigation Program from nonprivileged Unocal incident investigation records from 1992 to present. The Refinery's Incident Investigation program will be reviewed using Cal/OSHA's "Guideline for Process Safety Management Audit" prepared for 8 CCR 5189 (m) attached (Attachment A). Nonprivileged incident reports of spills or releases from 1992 to present which resulted in or had the potential for a spill or release of hazardous materials will be summarized to determine possible patterns/trends in the Refinery operations. Those incident reports will also be reviewed for determination of root cause analyses and completion of all identified action items resulting from the incident investigation. The auditor is to pay particular attention to the odor abatement compressors. 3. Review/evaluation of selected written operating procedures for the processes. Selected Unocal written operating procedures will be reviewed and evaluated for adequacy utilizing the "Guideline for Process Safety Management Audit" prepared for 8 CCR 5189 (f) (Attachment B) by the CalJOSHA Consultation Service. A minimum of three operating procedures for refining units will be reviewed. The units selected will be high on the priority order list that the refinery developed for Process Safety Management, 8 CCR 5189 (e) (Process Hazards Analysis). 4. Review/evaluation of the Operator Training Program including applicable training on operating Page 3 procedures, emergency shutdowns, ,emergency response/notification procedures, and certification of employees. The Unocal Operator Training Program will be reviewed and evaluated for adequacy utilizing the "Guideline for Process Safety Management Audit" prepared for 8 CCR 5189 (g) (Attachment C) by the Cal/OSHA Consultation Service. 5. Review/evaluation of contractor training_program and standards for contractor qualifications. The Unocal Contractor Training Program will be reviewed and evaluated for adequacy utilizing the "Guideline for Process Safety Management Audit" prepared for 8 CCR 5189 (h) (Attachment D) by the Cal/OSHA Consultation Service. 6. Review of Unocal oversight of contract workers. The oversight by Unocal of contract workers will be reviewed utilizing the attached questions (Attachment E). 7. Review of the quality assurance program for positive materials (equipment) identification and confirmation of satisfied design standards. The Unocal quality assurance program for positive materials identification and confirmation of satisfied design standards will be reviewed for adequacy utilizing the "Guideline for Process Safety Management Audit" prepared for 8 CCR 5189 0) (Attachment F) by the Cal/OSHA Consultation Service. 8. Review of the preventive and predictive maintenance program including the frequency of inspections and standards for determination of acceptable testing/inspection results. The Unocal preventive maintenance program will be reviewed for adequacy utilizing the "Guideline for Process Safety Management Audit" prepared for 8 CCR 5189 0) (Attachment F) by the Cal/OSHA Consultation Service. The audit must include a review of the maintenance and inspection records of the odor abatement compressors and flare system and make recommendations as appropriate. 9. Review/evaluation of the Unocal Management of Change program and implementation.,o*f-the program. The Unocal's Management of Change program will be reviewed for adequacy utilizing the "Guideline for Process Safety Management Audit" prepared for 8 CCR 5189 (1) (Attachment G) by the Cal/OSHA Consultation Service. At least three Management of Change documents that deal with process changes and have been completed in the 2 years preceding the audit will be reviewed for completeness and interface issues with the various Unocal departments. Page 4 completed in the two ears preceding the audit will be reviewed for completeness and interface P Y P g P issues with the various Unocal departments. 10. Review/evaluation of a portion of Unocal's Loss Control Management policies and procedures. Unocal Refinery's Loss Control Management programs,policies,and procedures for Leadership and Administration, General Promotions,Personal Communication and Group Communication will be reviewed and evaluated. Attached are the sub elements of these programs that are to be reviewed and evaluated(Attachment H). 11. Review of the status of the Unocal action items resulting from Catacarb release (corrective action lan . The Unocal Catacarb Corrective Action Plan (Attachment I) will be reviewed and audited to verify completeness/status of action items. 12. Review of Unocal's corrective action plans addressingthe he Bay Area Air Quality Management District findings and recommendations that have been provided to Unocal. The Bay Area Air Quality Management District and the Health Services Department will review Unocal's corrective action plans and implementation schedules to address .findings and recommendations of the Bay Area Air Quality Management District that have been provided to Unocal regarding the Catacarb Incident" Page 5 Attachment A Review of Incident Investigations Page A-1 5189 (m) : ' INCIDENT INVESTIGATIONS I. PROGRAM SUMMARY The employer is required to investigate each incident which resulted in, or could reasonably have resulted in a catastrophic release of highly hazardous chemical in the .workplace. An investigation shall be initiated no later than 48 hours following the incident. An investigation team shall be established and a report prepared which includes: 1) Date of incident 2) Date investigation began 3) Description of incident 4) Factors that contributed to the incident 5) Recommendations from the investigation. The employer is required to establish a system to promptly address the incident report findings and recommendations, documenting all resolutions and corrective actions. Incident reports shall be reviewed with all affected personnel whose job tasks are relevant to the investigation and retained for five years. II . QUALITY CRITERIA REFERENCES A. 5189 m) : Incident Investigations III. VERIFICATION OF PROGRAM ELEMENTS Criteria Hec Reference YIN A. Records Review 1. Has each incident been investigated which resulted in, 5189 (m) or could reasonably have resulted in a catastrophic release (1) of highly hazardous chemicals in the workplace? 2. Have incident investigations been initiated as promptly 5189 (m) as possible, but not later than 48 hours following the (2) incident? D. 5189 (m) : INCIDENT INVESTIGATIONS B. On-site Conditions 1. Do observations of a representative sample of process 5189 W components involved in incident investigations indicate that (6) recommendations have been resolved? (Compare the corrective actions outlined in the ! investigation documentation with the actual equipment, procedures, material use, etc.) C. Interviews 1. Based on interviews with a representative number of 5189 W operators, maintenance employees and contractor employees, (1) have all incidents that resulted in or could reasonably have resulted in a catastrophic release of highly hazardous chemicals in the workplace, been investigated? D.7 5189 (m) : INCIDENT INVESTIGATIONS 6. Have resolutions and corrective actions from the 5189 (m) incident investigation reports been documented? (6) 7. Have incident investigation reports been reviewed with 5189)m) all affected personnel whose job tasks are relevant to the (5) incident findings including contract employees, where applicable? 8. Are incident investigation reports retained for five 5189(m) years? (7) 5189 (m) : INCIDENT INVESTIGATIONS. 3 . Have incident investigation teams been established? Do 5189 (m) the teams contain at least one person knowledgeable in the (3) process involved in the incident, and other members with appropriate knowledge and experience to thoroughly investigate and analyze the incident? Has a contractor employee been included in the team if the incident involved work of the contractor? 4. Have incident investigation reports been prepared at the 5189(m) conclusion of the investigation which include at minimum: (4) • Date of the incident? (A) • Date the inspection began? (B) • A description of the incident? (C) • The factors that contributed to the incident? (D) • Any recommendations resulting from the (E) investigation? 5. Has a system been established to promptly address and 5189 (m) resolve the incident investigation report findings and (6) recommendations? Attachment B Review of Written Operating Procedures Page B-1 D.-7 5189 (f) OPERATING PROCEDURES I. PROGRAM SUMMARY The intent of this paragraph is to provide clear instruction for conducting activities involved in covered processes that are consistent with the prccess safety information. The operating procedures must address steps for each operating phase, operating limits, safety and health considerations, and safety systems and their functions. II. QUALITY CRITERIA REFERENCES A. 5189 (f) D. 5155 B. 5192 E. 5194 C_ 3314 III. VERIFICATION OF PROGRAM ELEMENTS Criteria Net Reference WN A. Records Review 1. Do written operating procedures exist for each covered 5189 (f) process? Do the procedures provide clear instructions for (1) conducting activities safely? 2. Do the operating instructions address, as a minimum, 5189 (f) " steps for each operating phase, including: (1) (A) • Initial start-up? (1) • Normal operations? (2) • Temporary operations?. (3) • Emergency shutdowns? (4) • Conditions requ}ring emergency shutdown? • Assignment of shutdown- responsibility to qualified operators? • Emergency operations? • Normal shutdown? (5) • Start-ups following a turnaround or emergency {6) shutdown? ale t3-2 5189 (f) ; OPERATING PROCEDURES 3 . Do the operating procedures include operating limits 5189 (f) that outline consequences of process deviation and steps (1) (B) required to correct or avoid deviations? 1,2,3 4. Have safety and health considerations been included in 5189 (f) the operating procedures? Do they include at a minimum: (1) (C) • Properties of, and hazards presented by, chemicals (1) used in the process? a Precautions necessary to prevent exposure, including (2) engineering controls, administrative controls, and personal protective equipment? • Control measures to be taken if physical contact or (3) airborne exposure occurs? Quality control for raw materials and control of (4) hazardous chemical inventory levels? Any special or unique hazards? (6) S. Are safety systems and their functions included in the 5189 (f) operating procedures? (2) 6. Are the operating instructions consistent with the 5189 (f) process safety information? (2) Page B 5189 ( f) :' OPERATING PROCEDURES 7. Are operating procedures readily accessible to employees 5189(f) who work in or maintain a process? (2) 8 . Are operating procedures reviewed as often as necessary 5189 (f) to assure that they reflect current operating practice? Are (3) they certified annually by the employer that they are current and accurate? Do they reflect current operating practice that have resulted from changes in: • Process chemicals? • Technology? • Equipment? • Facilities? 9. Have safe work practices been developed and implemented 5189(f) for employees and contractors to control hazards during operations such as: • Lockout/tagout? • Confined space entry? • Opening process equipment or piping? • Control over entrance into a facility by maintenance, contractor, laboratory or- other support personnel? B. On-site Conditions 5189(f) (2) 1: Does observation of a representative sample of processes indicate that the written operating procedures are being implemented? Paae B-� 5189 M :' OPERATING PROCEDURES 2. Does observation of a representative sample of processes 5189(f) indicate that the written operating procedures are readily (2) accessible to employees who work or maintain a process? 3 . Does observation of a representative sample of processes 5189 (f) indicate that operating procedures reflect current practice, (3) including changes that result from process chemicals, technology, equipment, and facilities? (observe to see if actual procedures match the written operating procedures. ) 4. Does observation of representative operations indicate 5189 that safe work practices have been implemented for company (4) and contractor employees? Do such work practices include, where appropriate: • Lockout/tagout? • Confined space entry? • opening process equipment or piping? • Control over entrance into a facility by maintenance, contractor, laboratory, and other support personnel? Page B-5 5189 ( f) : ' OPERATING PROCEDURES C. Interviews 1. Based on interviews with a representative number of 5189 (f) operators, are the written operating procedures implemented (1) for each covered process? 2 . Based on interviews with a representative number of 5189 (f) operators, do operating procedures provide clear (1) instructions for safely conducting activities? (Specifically ask for conditions requiring emergency shutdown, the operating limits of a particular process or item of equipment, what might occur if a deviation from those limits should take place, steps to avoid the deviation, and precautions necessary to prevent exposure to hazardous chemicals. ) 3. Based on interviews with a representative number of 5189 (f) employees who work in or maintain a process, are the (2) operating procedures readily accessible? 4. Based on interviews with a representative, number of 5189 (f) operators and maintenance employees, do the operating (3) procedures reflect current operating practice? Page B-6 D7 Attachment C Review of Operator Training Program Page C-1 5189 (g) : TRAINING I. PROGRAM SUMMARY The intent of this section helps employees understand the nature and causes of problems arising from process operations, and increases employee awareness with respect to the hazards particular to a prccess. An effective training program significantly reduces the number and severity of incidents arising from process operations, and can be instrumental in preventing small problems from leading to a catastrophic release. Minimum requirements for an effective training program include: Initial Training, Refresher Training, and Certification records. II. QUALITY CRITERIA REFERENCES A. 5189 (8) : Training B. 5189 (f) (1) : Operating procedures III . VERIFICATION OF PROGRAM ELEMENTS Criteria "eC Aelerencn Y/N A. Records Review 5189(g) (1) 1. For employees involved in operating a process do initial and refresher training records exist? Do the records contain the identity of the employee, the date of the training, and the means used to verify that the employee understood the training? 2. Has the employer consulted with employees involved -in operating the process to determine the appropriate frequency for refresher training? Is the frequency at 5189 (g) least once every 3 years? (2) Page C-2 5189' (g) : TRAINING ` 3 . Is there written certification that they have the 5189 (g) required knowledge, skills and abilities to safely carry (3) out the duties and responsibilities specified in the operating procedures? (Review the documents to make sure the certification has not be invalidated by a change in duties. ) 4. Has each employee involved in operating a process 5189 (8) been trained in an overview of the process and the operating procedures including: • Steps for each operating phase? Initial startup, normal operations, temporary operations, emergency shutdown, emergency operations, normal shutdown, and startup following a turnaround or emergency shutdown • Operating limits? Consequences of deviations and steps required to avoid deviations • Safety and health considerations? - Properties.and-hazards of chemicals used and precautions for preventing exposure- • Safety systems .and their functions? H. On-site Conditions Verification is not required. Page C-3 5189 (9) : TRAINING C. Interviews 1. Based on interviews with a representative number of 5189 (8) employees, has their training emphasized specific safety and health hazards, emergency operations including shutdown, and safe work practices applicable to their tasks? 2. Based on interviews with employees named as having 5189(g) provided consultation, has the employer consulted with (2) employees involved in operating the process to determine the appropriate frequency of refresher training? Page C-4 Attachment D Review of Contractor Training Program Page D-1 t . 5189 (h) CONTRACTORS I. PROGRAM SUMMARY The intent of this section is to require employers who use contractors to perform work in and around processes that involve highly hazardous chemicals to establish a screening process sa that they hire and use contractors who accomplish the desired job tasks without compromising the safety and health of employees at a facility. The contractor must assure that contract employees are trained on performing the job safely, of the hazards related to the job, and applicable provisions of the emergency action plan. II. QUALITY CRITERIA REFERENCES A. 5189 (h) Contractors B. 5189 (f) (4) Operating Procedures C. 5189(n) Emergency Planning III. VERIFICATION OF PROGRAM ELEMENTS Criteria Net Reference Y/24 A. Records Review - Employer' s Program 51 )9 1. Does the program include all contractors performing (1) maintenance or repair, turnaround, major renovation or specialty work on or adjacent to covered processes? (Contractors performing incidental services which do not influence process safety such as janitorial work, food and drink services, laundry, delivery, and other supply services need not be included. ) 2. Is the information regarding the contractor's safety 5189 (h) performance and programs obtained and evaluated for selection (5) of contractors? Page D-2 5189 (h) CONTRACTORS D:7 3 . Are the contract employers informed of the known 5189(h) potential fire, explosion, or toxic release hazards related (1) to the contractor's work and the processes? 4. Are contract employers informed of the applicable 5189 (h) provisions of the emergency action plan required by 5189(n) ? (2) 5. Have safe work-- practices to control the entrance, 5189(h) presence and exit of contract • employers and contract (1) employees in covered process areas been developed and implemented? P Page D-3 518 9 (h) CONTRACTORS 6. Are contract employers evaluated for their performance in S189 (h) fulfilling their obligations to: (6) • Assure their employees are trained in safe work practices needed to perform the job? • Assure their employees are instructed in the known potential fire, explosion, or toxic release hazards related to the job and the applicable provisions of the emergency action plan? • Document the required training and the means to verify their employees have understood the training? • Assure their employees follow the facility safety rules and work practices? • Advise the employer of unique hazards presented by the contractor's work? 7. Does the employer maintain a contract employee injury and 5189 (h) illness log related to the contractor's work in process (7) areas? Records Review - Contractor' s Programs 5189(h) (3) 8. Are all contractor employees trained in the work practices necessary to perform their jobs safely? Page D-4 5189 (h) CONTRACTORS 9. Is each contract employee instructed in the known 5189 (h) potential fire, explosion, or toxic release hazards related (1) to his/her job and the processes and applicable provisions of the emergency action plan? 10. Is there documentation that each contract employee has 5189 (h) received and understands the required training? (4) 11. Do the contract employee training records contain the 5189 (h) following: (4) 0 The identity of the employee? • The -date of the training? • The means used to verify that the training was understood? Page D-5 5 5189 (h) CONTRACTORS 12. Are there means to assure that contract employee follow 5189 (h) the safety rules of the facility, including safe work (3) practices required in 5189 (f) (4) ? (Review evidence of enforcement by the contractor. ) 13 . is the employer advised of any unique hazards presented 5189(h) by the contract employer's work or any hazards found by the (3) contract employer's work? B. On-site Conditions 5189(h) (2) 1. Based on a representative sample of observations of coritractor employees, has the employer's program to control their. entrance, presence, and exit been implemented? Page D-6 5189 (h) CONTRACTORS _ 2. Based on a representative sample of observations of 5189 (h) contractor employees, do they follow the safety rules of the (3) facility? (These rules include the employer's safe work practices such as lockout/tagout, confined space entry, and opening process equipment or piping; they may also include other rules such as excavation procedures or use of PPE.) C. Interviews 5189(h) (1) 1. Based on interviews with contractor employers, have they been informed of the known fire, explosion, or toxic release hazards related to their work and the processes in which they are involved? 2. Based on interviews with contractor employers, have they 5189(h) been informed of the applicable provisions of the employer's (2) emergency action plan? Page D-7 5189 (h) CONTRACTORS 3. Based on interviews with contractor employers and 5189 (h) employees, have work practices to control their entrance, (1) presence, and exit of covered process areas been implemented? 4. Based on interviews with the contractor employer, has the 5189 (6) employer evaluated the contractor's performance in fulfilling the obligations required in 5189 (h) (3) ? 5. Based on interviews with a representative number of 5189(h) contractor employees, are they being instructed in the known (4) potential fire, explosion, or toxic -release hazards related to their work and the processes in which they are involved? Page D-8 5189 (h) CONTRACTORS 6 . Based on interviews with a representative number of 5189(h) contractor employees, have they been instructed in the (2) applicable provisions of the emergency action plan? (Ask them to explain the plan and evacuation procedures. ) 7. Based on interviews with a representative number of 5189(h) contractor employees, has the contract employer assured that (3) they follow the safety rules of the facility? (Ask how safe work practices, entry restrictions for the facility, and use of required PPE are enforced. ) Page D-9 D-7 Attachment E Review of Oversight of Contractors Page E-1 Review of Oversight of Contractors: Question Response 1. On what frequency are the activities of contractors monitored? 2. Who monitors the contractor's activities? 3. How does the facility assure that contractor's employees follow the specified job specific procedures? Page E-2 t 1 Attachment F Review of Quality Assurance Program and Review of Preventive and Predictive Maintenance Program Page F-1 5189 (j ) : , MECHANICAL INTEGRITY D I . PROGRAM SUMMARY The intent of this section is to assure that equipment used to process, store, or handle highly hazardous chemical is designed, constructed, installed, and maintained to minimize the risk of releases of such chemicals. This requires that a mechanical integrity program be in place to assure the continued integrity of process equipment. The elements of a mechanical integrity program include the identification and categorization of equipment and instrumentation, development of written maintenance procedures, training for process maintenance activities, inspection and testing, correction of deficiencies in equipment that are outside acceptable limits defined by the process safety information, and development of a quality assurance program. II. QUALITY CRITERIA REFERENCES A. 5189 (j) : Mechanical Integrity III. VERIFICATION OF PROGRAM ELEMENTS Criteria Net Reference YIN A. Records Review 1. Does the written mechanical integrity program include? 5189(j) • Pressure vessels and storage tanks (1) (A) • Piping systems and components such as valves • Relief and vent systems and devices • Emergency shutdown systems • Controls (including monitoring devices and sensors, alarms and interlocks) • Pumps & compressors • Heat exchangers 2. Are there written procedures to maintain the on-going 5189 (j) integrity of process equipment? Does the documentation (1) (A) indicate the procedures have been implemented? Page F-2 5189 (j ) : MECHANICAL INTEGRITY 3. Has .training been provided to each employee involved 5189(g) in maintaining the on-going integrity of process equipment (3) in the following: An overview of the process and its hazards? • Procedures applicable to the employee's job tasks to assure that the employee can perform the Joh tasks in a safe manner? (Review certification documents for employees doing non- destructive tests, welding on pressure vessels, etc. , where these certifications are required. ) 4. Are inspections and tests performed on each item of 5189 (j) process equipment included in the program? (2) (A) S. Do inspection and testing procedures follow good 5189(j) engineering practices? (2) (B) Page F-3 5189 ( 'J ) : MECHANICAL INTEGRITY 6. Are inspection and test frequencies consistent with 5189(j) the manufacturer's recommendation and good engineering (2) (C) practice? Are inspections and tests performed more frequently if determined necessary by operating history? 7. Is there documentation of each inspection and test 5189 (2) that has been performed including all of the following: (D) • Date of the inspection or test? • Name of person performing the procedure? • Serial number or other identifier of equipment on which procedure was performed? • Description of inspection or test performed? • Results of inspection or test? 8. Are deficiencies in equipment that are outside limits 5189(j) (as defined in process safety information) corrected (3) before further use or in a safe and timely manner when necessary means are taken to assure safe operation? Page F-4 D-7 5189 (j ) : MECHANICAL INTEGRITY 9. In the construction of new plants and equipment, does 5189 (j) the employer assure that equipment as it is fabricated is (4) (A) suitable for the process for which it will be used? 10. Have appropriate checks and inspections been made to 5189(j) assure equipment is installed properly and consistent with (4) (B) design specifications and manufacturer's instructions? (Include contractor supplied equipment. ) 11. Does the employer assure that maintenance materials, 5189(j) spare parts, and equipment are suitable for the process (4) (c) application for which they are used? (Include contractor, supplied equipment.) Page F-5 5189 ( '7 ) : -MECHANICAL INTEGRITY D B. On-site Conditions 1. Do observations of a representative sample of process slag (j). equipment indicate deficiencies outside acceptable limits? (3) (Compare process safety information criteria with the conditions of the equipment found in the process.) 2. If new plants or equipment are being constructed, do 5189 (j) observations indicate that the equipment as it is (4) (B) fabricated is suitable for the process application? 3. Do observations of a representative sample of 5189(j) maintenance materials; spare'parts, and equipment indicate (4) (c) • that they are suitable for the process application for which they will be used? Page F-6 5189 (j ) : ' MECHANICAL INTEGRITY C. Interviews 5189 (j) Engineers (if any; or other qualified persons capable of (1) (A) providing the information requested; 1. Based on interviews with a representative number of engineers, have procedures to maintain the on-going integrity of the process equipment been implemented for: • Pressure vessels and storage tanks? • Piping systems and components such as valves? • Relief and vent systems and devices? • Emergency shutdown systems? • Controls (including monitoring devices and sensors, alarms and interlocks) ? • Pumps? (Ask about the possibility of safety critical equipment being inadvertently rendered inoperative. For example, a relief device might be isolated by closing an upstream valve. ) 2. Based on. interviews with a representative number of 5189 (j) engineers, do the inspection and testing procedures follow (4) (B) recognized and generally accepted good engineering & practice? Has prior operating experience indicated a need (2) (C) for a more. fx-equent test and inspection schedule than- has been implemented? Page F-7 5189 (j ) : •MECHANICAL INTEGRITY 3 . Based on interviews with a representative number of 5189(j) engineers, are equipment deficiencies corrected before use (3) when they are outside the acceptable limits? If not, are the deficiencies corrected in a timely manner and are necessary means taken to assure safe operation? 4. Based on interviews with a representative number of engineers, has the employer assured that, for new plants 5189(j) and equipment, the equipment as it is fabricated is (4) (B) suitable for the process application? Are appropriate & (C) checks and inspections made to assure equipment is installed properly and consistent with design specifications and manufacturer's instructions? Are maintenance materials, spare parts, and equipment suitable for the process application for which they will be used? (Ask about contractor supplied items. ) Maintenance: 5. Based on interviews with a representative number of 5189.(j) maintenance employees, have the written procedures for (i) (A) maintaining the on-going integrity of process equipment been implemented? Page F-8 5189 (j ) : MECHANICAL INTEGRITY 6. Based on interviews with a representative number of 5189 (g) employees involved in maintaining the on-going integrity (3) of the process, have they been trained to assure they can perform their tasks in a safe manner? Did the training include an overview of the process, its Hazards, and procedures applicable to the job? (Determine if certification, specialized training, or unique qualifications are required. ) 7. Based on interviews with a representative number of 5189 (j) maintenance employees, do test and inspection procedures (2) (C) follow recognized and generally accepted good engineering practices? Is the frequency of inspections and tests consistent with applicable manufacturer's recommendations and good engineering practices? Are more frequent inspections and tests necessary due as indicated by prior operating experience? Page F-9 5189 (j ) : 'MECHANICAL INTEGRITY 8. Based on interviews with a representative number of 5189 (j) maintenance employees, are equipment deficiencies that are (3) outside acceptable limits corrected before further use? If not, are corrections made in a timely manner and are necessary means taken to assure operation? 9. Based on interviews with a representative number of 5189(j) maintenance employees, are maintenance materials, spare (4) (B) parts and equipment suitable for the process application & (C) for which they are intended? (Ask about availability and use of substitutes.) Page F-10 Attachment G Review of Management of Change Page 6-1 9 HANGE 518 �1) 'MANAGEMENT OF C I . PROGRAM SUMMARY The intent of this section is to require management of all modifications to equipment, procedures, raw materials and processing conditions other than "replacement in kind" by .identifying and reviewing them prior to implementation of the change. Minimum requirements for management of change include: establishing written procedures to manage change; addressing the technical basis, impact on safety and health, modification to operating procedures, necessary time period, and authorizations required; informing and training employees affected; and updating process safety information and operating procedures or practices. II . QUALITY CRITERIA REFERENCES A. 5189 (1) : Management of Change III . VERIFICATION OF PROGRAM ELEMENTS criteria Reference YIN A. Records Review 5189 (l) (1) 1. Are there written procedures for managing changes (except for "replacements in kind") to process. chemicals, technology, equipment, and procedures and changes to facilities that affect a covered process? (Review procedures that address responsibilities, steps for assessing risks and approving changes, requirements for reviewing designs for temporary and permanent changes, steps needed to verify that modifications have been made as designed, variance procedures, time limit authorizations for temporary changes, and steps required to return the process to status quo after temporary changes. ) 2. Do the procedures assure that the technical basis for 5189(1) the proposed change is addressed prior to any change? (2) (A) 5189(1) (2) (A) Page G-2 5189 (1) : 'MANAGEMENT OF CHANGE 3. Do the procedures assure that the impact of the change 5189(1) on safety and health is addressed prior to any change? (2) (B) 4. Do the procedures assure that modifications to 5189 (1) operating procedures is addressed prior to any change? (2) (C) 5. Do the procedures assure that the necessary time period 5189 (1) for the change is addressed prior to any change? (2) (D) Page G-3 • D�7 5189 (1) : MANAGEMENT OF CHANGE 6. Do the procedures assure that the authorization 5189 (1) requirements for the proposed change are addressed prior to (2) (E) any change? 7. Are employees involved in operating a process, and maintenance and contract employees whose job tasks will be 5189(1) affected by change informed of, and trained in, the change (3) prior to start-up of process or affected part of process? 8- Is the.process safety information required by paragraph (d) updated if changed? 5189(1) (4) Page G-4 5189 (1) : . MANAGEMENT OF CHANGE 9. Are the operating procedures or practices required by 5189 (1) paragraph (f) updated if changed? (5) B. On-site Conditions 5189(1) (1) 1. Do observations of new or recently modified process chemicals, technology, equipment, or procedures (except "replacement in kind") indicate that the Management of Change procedures have been implemented? (Determine if records are available to support the procedures for new or revised processes found in the facility. ) Page G-5 5189 (1) : ' MANAGEMENT OF CHANGE C. Interviews Operators, Maintenance, and contractor Employees: 1. Based on interviews with operators, maintenance 5189 (1) employees and contractor employees, are procedures �1) implemented to manage changes to existing process chemicals, technology, equipment, facilities, and procedures? 2. Based on interviews with operators, maintenance 5189 (1) employees and contractor employees, is training in process (3) changes provided to employees whose job tasks will be affected by the changes prior to start-up? Page G-6 D•7 Attachment H Review and Evaluation of Loss Control Management Page H-1 Loss Control Management Review the policies, programs, and procedures and evaluate their implementation for the elements listed below for the Unocal San Francisco Refinery. Leadership and General Personal Group Administration Promotion Communications Communications General Policy Loss Control Training in Group Loss Bulletin Boards Personal Control Meetings Communication Techniques Safety and Use of Incident Job Orientation/ Record-Keeping Health/Loss Statistics Induction Control Coordinator Senior and Critical Topic Task Instruction Management Middle Promotion Involvement Management Participation Established Loss Individual Planned Personal Control Awards and Contacts Performance Recognition Standards Participation in Loss Control Loss Control Information Activities Publications Management Group Awards Meetings and Recognition Loss Control Housekeeping Reference Promotion , Manual System Internale Audits External Conducted Promotions Individual Records of Responsibility Promotion for Loss Control Activities Page H-2 P.T Leadership and General Personal Group Administration Promotion Communications Communications Establishment of Annual Loss Control Objectives Joint Safety, Health, and Environmental Committees and/or Safety and Health Representatives Refusal to Work Due to Loss Control Hazards Reference Library Document Control Regulations, Codes, and Standards External Communications Page H-3 Attachment I Unocal Catacarb Corrective Action Plan Page I-1 CORRECTIVE ACTION PLAN SUMMARY 1. Auditing A. Independent Auditor to review Unocal's notification procedures, emergency response plan and safety management program B. Audit notification procedures to emergency response staff, employees, agencies, and community 2. Training A. "Lessons learned" Training Incorporate details of Catacarb incident in annual OSHA training to prevent recurrence B. .Management of Change Training with emphasis on unusual circumstance C. Compliance Alert Training D. Risk Communication Training E. Emergency Response Plan Training 3. Chills A. Notification procedures B. Emergency response plan C. Health Care Provider notification procedures 4. Communications Several communications channels will be used to reinforce message of commitment to safety and compliance A. Messages from Upper Management via presentations B. Articles in Employee Newsletter C. Messages from the Manager via memo 5. Management oversight/decision-making A. Increase technical staff input and cross-functional decision teams for unusual and emergency operations B_ Increase management in the field C. Improve handling of community calls 6. Enhanced Information Access A. Update MSDS handling B. Update crisis communications policy C. Create health care provider notification plan D. Community Advisory Panel Page I-2 December 2, 1994 Page 1 CORRECTIVE ACTION PLAN DETAIL Action Date Description 1. Auditing 3/95 A. Independent Auditor Unocal will, at company expense, hire an independent auditor, selected by the community and mutually agreeable to Unocal, who will perform an independent audit of the facility's notification procedures, emergency response plan, and safety management program. The results of the audit would be made public, and Unocal is committed to responding to any concerns raised by the report. B. Internal Audit A team has been pulled together to improve Unocal's notification procedures, which includes how the refinery notifies and communicates with emergency response staff, employees, agencies, and community. com- Internally, these include revising our procedures for activating plete emergency personnel and ordering new communications equipment. com- In the community, these mean identifying those which need plete most carefully looking after, such as schools, day care centers and senior citizen centers and improving our ability to communicate with them quickly and clearly. The audit will also review timeliness of agency notification. (The initial audit has �gen'completed and some of the recommendations have already been put in place) 2. Training 1/95 A. "Lessons Learned" Training Incorporate details of Catacarb incident in annual OSHA . training to all employees to prevent recurrence 3/95 B. Management of Change Training Review formal training of personnel who participate in Management of Change programs with emphasis on application of the Management of Change to unique or unusua situations. Review Management of Change procedure to address and reinforce inclusion of non-engineered changes in a process, operating equipment, and procedures. Page I-3 . . P,7 December 2, 1994 Page 2 Action Date Description 2. Training (Cont) 1/95 C. Compliance Alert Training Perform training to all employees during monthly safety meetings on the corporate compliance alert program. Training will include a description of compliance guidelines and standards, a description of the toll-free telephone number for compliance reporting, and distribution of a wallet-size card for reference. 1/95 D. Risk Communication Training Perform risk communication training to enhance management and staffs ability to communicate clear consistent message concerning potential health safety and environmental risks posed by operations. 2/95 E. Emergency Response Plan Training Perform training on the emergency response plan after it has been reviewed and updated, including evaluating criteria for calling an emergency "Under Control' and "All Clea", as well as agency and community notification procedures. Training will focus on Management and Staff, and be-incorporated into the all employee annual OSHA training. 3. Drill 1/95 A. Notification procedure Perform table top drills after notification procedures have been reviewed and updated to include: agency notification, community notification and employee notification. 5/95 B. Emergency response plan Perform:drill of 6mZ-rgencyiresponse plan. Invitation fo observe/participate in the drill will be extended to CAP members, and local fire departments. 4/95 C. Physician notification plan Perform drill of physician notification plan. Invitation to observe/participate in the drill will be extended to recipient physicians, CAP members, and local fire departments. Page I-4 D. 7 December 2, 1994 Page .3 Action Date Description 4. Communications Examine and take steps to improve communications within the Refinery. Several communications channels will be used to reinforce message of commitment to safety and compliance. A. Messages from Upper Management via Presentations 12/94 • President, 76 Products, addresses all supervisors 2/95 • Vice President of Refining, 76 Products, addresses all supervisors 5/95 • Vice President HES, Unocal, describes new corporate compliance program to all supervisors 8/95 • General Counsel, 76 Products, addresses all supervisors 11/95 • Chief Compliance Officer, Unocal, addresses all supervisors B. Articles in Employee Newsletter Including: on- ■ compliance alert 800 number going o interviews with health, safety, emergency response and environmental affairs personnel ■ description and examples of Management of Change process on- C. Messages from the Manager going Memos to employees, emphasizing commitment to compliance, updating on interaction with community Page I-5 December 2, 1994 Page 4 Action Date Description 5. Management 1/95 A. Include technical staff input in cross-functional oversight/ decision teams for unusual and emergency operations Decision making Review roles for specialized departments (i.e. Environmental Affairs, Health Safety and Emergency Response, Metallurgical Engineering and Inspection, Process Engineering, Engineering Design and Construction and Law Department) in the decision making process. Review and formalize methodology for management decisions related to unusual and emergency operating situations with the goal of enhancing cross-functional team work and decisions. 12/94 B. Increase management in the field Increase Management's and staff group's field presence in order to improve face to face communications. Include field visits in key performance indicators (KPI). 1/95 C. Handling community complaints Review and improve handling of community complaints, e.g. establish specific guidelines for response and incorporate the in the existing procedure. Complaint routing should be reviewed and updated to assure that the appropriate responsible departments (Environmental Affairs, Health Safety Emergency Response, etc.) are promptly apprised of the situation and respond. Refinery manager will be given copies of community complaints on an ongoing basis. CAP members will review complaints at CAP meetings. Complaints will be summarized for Vice-President of Refining monthly. Page I-6 December 2, 1994 Page 5 Action Date Description 6. Enhanced 2/95 A. Update MSDS handling Information Access An improved method will be developed to make MSDS quickly available to the public. Review current procedures for obtaining and reviewing Material Safety Data Sheets (MSDS) for new or modified chemicals and new and intermediate products. Procedures should include time limits for MSDS development, review, and availability to employees. The procedure should be consistent with the Unocal Corporate Product Safety and Toxicology Group procedure. 3/95 B. Update crisis communications plan Review and enhance current crisis communications plan to incorporate new relationships established with community members and media as a result of the Community Advisory Panel, Good Neighbor Agreement meetings and 76 Products Public Relations Plan. Specific examples include: ■ establish a list of "key community contacts" to be notified in the event of an emergency ■ timely notification of CAP members, incorporating CAP members in organization and dissemination of information to community after an incident ■ acquaint local media with incident command system C. Create health care providers notification plan Develop a plan to notify local health care providers (physicians clinics, emergency rooms, pharmacists, emergency response personnel, etc.) in the event of_a release. .Notification will include a brief summary of toxicological properties, recommended diagnostic tests and treatment, and a contact number for Unocal physicians and toxicologists. Action steps will include: 12/94 a Designate list of potential local health care providers (physicians, pharmacists, etc.) 1/95 ■ Hold focus group of potential recipients to review sample format and content 2/95 ■ Develop list of potential hazards to be included in program 3/95 ■ Computertfax broadcast set up 3/95 ■ Develop policy for activation, incorporate into the incident command system procedures and training 4/95 ■ Input data into program 6/95 ■ Prepare program/data to be shared with other facilities Page I-7 December 2, 1994 Page 6 Action Date Description 6. Enhanced C. Community Advisory Panel Information Access has A community advisory panel (CAP) will be established to (Cont) been promote long-term communications, cooperation and working initi- relationships between Unocal and its neighbors in Crockett, ated Rodeo and Tormey. on- The CAN will identify and work to resolve issues of concern to going the community and Unocal. As an introduction to the refinery, Unocal will provide CAP members with an orientation and training on refinery operations, health, environment and safety procedures, company policies and procedures including a tour. Page I-8 Attachment J Compliance Exceptions and Recommendations Page J-1 *01 0) —0 00 .0 it i yl 0- 0) 0 a11 0 7. rct ct Iz, 0 14 ATTACHMENT K BAY AREA AIR QUALITY MANAGEMENT DISTRICT RECOMMENDATIONS FOR UNOCAL'S CATACARB RELEASE Page K-1 a ATTACHMENT K BAY AREA AIR QUALITY MANAGEMENT DISTRICT RECOMMENDATIONS FOR UNOCAL'S CATACARB RELEASE BAAQMD BAAQMD NOTES CONCLUSIONS RECOMMENDATIONS 1. Unocal operated for 16 days An explicit policy of zero with a leak in a chemical tower. tolerance for leaks, spills and release needs to be developed and implemented. Verification methods must be established that cover: reporting, tracking and progress reports with specific time deadlines. 2. A flawed decision making The decision making process Contractor will review process allowed operation with must require greater in section 11 - the chemical leak. involvement of competent Attachment I, 5A. environmental and health& safety personnel. The Unocal Environmental Department must be an integral part of the day-to- day refinery operations. Any role ambiguities must be eliminated. 3. Inspection of the D-409 Unocal must have a more Contractor will review Tower, after shutdown, revealed effective program to monitor and in section 8. extensive corrosion in a number control corrosion in their process of areas. equipment. 4. Unocal's corporate culture, in Unocal must establish a Contractor will review practice, emphasizes production corporate culture that in section 10. over safety and the environment. emphasizes safety and environmental protection and institute training to communicate this to the employees. There must be Corporate environmental training. The degree of participation of the "front-line"workers will determine the success of the policy. Page K-2 SAFETY PROGRAM AUDIT AGREEMENT The parties to this Safety Program Audit Agreement ("Agreement") are the Union Oil Company of California ("Unocal"), a California Corporation, and the County of Contra Costa, a political subdivision of the State of California (on behalf of the Board of Supervisors and the Health Services Department, hereinafter referred to as "County"). Collectively, Unocal and the County shall be referred to as the "Parties." RR('TTAT S A. Unocal owns and operates an oil refinery located in Rodeo, California (the "Refinery"). B. In 1994 and 1995, several alleged releases of air emissions occurred at the Refinery which resulted in odor complaints by residents of Rodeo, Tormey, and Crockett, California, as identified in the attached Statement of Scope, which is attached as Exhibit 1 hereto. C. In response to these incidents and the associated complaints, the County desires to enter into an agreement with Unocal to perform a comprehensive safety audit, as defined below, at the Refinery. D. The audit performed under this Agreement will be conducted in addition to the audit performed under the Good Neighbor Agreement between Unocal and community groups s6o2oi.� D•7 in Crockett and Rodeo, California. The Good Neighbor Agreement required an independent audit of the Refinery's emergency response plan, emergency notification procedures, and safety management program, and of the results of the process hazards analyses performed as part of the Process Safety Management Program required by the federal and state Occupational Safety and Health Administrations. A¢reement NOW, THEREFORE, the Parties agree as follows: 1. Rem S�Audit Statement of Scone. Unocal agrees to reimburse County for an independent audit contractor to perform a comprehensive safety audit (the "Audit") at the Refinery, as defined in the attached Statement of Scope (the "Scope"). The Scope is incorporated by reference, expressly made a part of this Agreement, and is attached as Exhibit 1 to this Agreement. 1.1 No revisions to the attached Scope will bepermitted under this Agreement without the prior written approval of Unocal, which approval shall not be unreasonably withheld. 1.2 In the event of any conflict between the text of this Agreement and its incorporated documents, including the attached Scope, the text of this Agreement shall govern. In the case of any conflict or inconsistency within or among any of the incorporated documents, the conflict or inconsistency shall be resolved by Unocal in writing. 2. ALdit Pmject Managers. There shall be two Project Managers during the Audit, one for each Party. 96MOl.rm - 2 - 2.1 The Project Manager for the County shall serve as the sole point of contact for Unocal during the Audit and shall be authorized to render any decision reserved to the County on behalf of the County. The County Project Manager shall be present on-site at the Refinery during any and all work performed by the Audit Contractor (defined below). 2.2 The Project Manager for Unocal shall serve as the sole point of contact for the County Project Manager and shall be authorized to render any decision reserved to Unocal on behalf of Unocal. The Unocal Project Manager shall oversee all work performed by the Contractor and shall coordinate all activities required to be performed by Unocal. The Unocal Project Manager shall coordinate all logistical matters at the Refinery including arranging any interviews of Refinery personnel. 3. Audit MonitorinIZ. Seven (7) individuals, whose function is specifically described below, shall serve as the Audit Monitors ("Monitors"). 3.1 Members 3.1.1 The County shall select a total of four (4) members who are residents of Rodeo, Tormey, or Crockett, California to serve as Monitors. The eligibility criteria and roles of the Monitors are described below. No alternates shall be selected or permitted to serve in place of these County-selected Monitors. 3.1.2 The County Supervisors for Districts I and II shall serve as Monitors. With respect to these Monitors, each Supervisor may appoint a single alternate. The alternate appointed by each Supervisor shall serve as a Monitor only when the Supervisor %Moi.fin - 3 - D•7 is unable to serve as a Monitor. The eligibility criteria and roles of the Monitors (and their Alternates) are described below. 3.1.3 One Monitor shall be a member of the Oil, Chemical & Atomic Workers Union International, AFL-CIO, Local 1-326 (the "OCAW").The eligibility criteria and roles of the Monitor are described below. 3.1.4 The County, the Supervisors for Districts I and II, and OCAW shall notify Unocal of their respective selected Monitors and Alternates as described above, at least thirty (30) days prior to the start date of the Audit, so that Unocal may confirm that the selected Monitors and alternates are eligible under the criteria set forth below. 3.2 Fligihility Criteria. No Monitor or alternate shall be eligible to serve if the person has commenced any legal action against Unocal, is the spouse or dependent of any person who has commenced any legal action against Unocal, or is employed by any person who has commenced legal action against Unocal. 3.3 Audit Monitore Gmun. The Monitors shall serve on the Audit Monitors Group. 3.3.1 The Audit Monitors Group shall participate on the Contractor Selection Panel to select the Audit Contractor, in accordance with the provisions of Section 4 of this Agreement. 3.3.2 The Audit Monitors Group may specify one designated person from within the Group ("Designee") to be present at and directly observe all work performed by the Contractor; provided, however, that the Designee shall neither participate in nor attend 96MOI.fin - 4 - any formal interviews of Unocal employees, which interviews shall be conducted as provided in Section 7 below. The Designee shall be permitted onsite at the Refinery only during those times in which the Contractor is also onsite unless expressly approved by the Unocal Project Manager. The Designee shall report his or her observations of the performance status of the Contractor's work to the Audit Monitors Group, at the Group's direction. 3.4 The County represents that its Counsel has reviewed the provisions of this Section 3 in accordance with the Brown Act and Contra Costa County Better Government Code and determined them to be in compliance therewith, at this time. 4. Selertion of Audit Contractor, 4.1 A safety audit firm (the "Contractor") shall be selected by the Contractor Selection Panel, for recommendation to the Board of Supervisors, to perform the Audit Work set forth in the Agreement and attached Scope. The Contractor Selection Panel shall be composed of the Audit Monitors Group, the Unocal Project Manager or the Manager's designee, the County Project Manager or the Manager's designee, and, if they choose to participate, a representative of the California Office of Emergency Services ("OES") and a representative of the California Division of Occupational Safety and Health ("Cal-OSHA"). If OES and Cal-OSHA choose to participate, the role of each agency shall be limited to participating in the selection of the Contractor. 4.2 Each bidder must provide labor rates and other direct costs to the County in its audit proposal. %02oi.rm - 5 - p.� 4.3 Each bidder must demonstrate auditing experience in the California Petroleum Refining Industry and must provide references for similar safety audit work completed for clients in the petroleum industry. 5. Conduct of Parti _iNnts (fin-Site, 5.1 No photographs may be taken by Contractor, County staff, or any Designee without prior written permission by Unocal. 5.2 Contractor, County staff, and any non-OCAW-member Designee will be escorted by qualified Unocal personnel at all times while in the Refinery. Nomex clothing, hard hats, protective eye wear (including goggles in some areas), hearing protection, and safety shoes are required in specified areas of some facilities and are to be provided by Contractor when required. Unocal will provide safety equipment, excluding shoes, for County staff and any Designee if so requested at least one (1) week prior to the start date of the Audit. 6. Audit Wnrk. The Audit Work shall consist of conducting a comprehensive safety audit of the Refinery as stated more fully below and in the attached Scope. 6.1 Review of the AnF.International findings from the independent safety audit conducted at the Un al R .finery nsirsuant to the Tlnocal Good Neighh� or Agreement. The Contractor shall review the findings from the evaluation performed by EQE International of the Refinery's Emergency Response Plan and procedures manual for determination of the level of compliance with the requirements of 8 CCR § 5192(q). The review shall include a review of the findings of the evaluation of the facility's past performance in implementing the %MO1.rM - 6 - D.7 Refinery Emergency Response Plan and the effectiveness of the Plan. The review shall include the evaluation of the effectiveness of the Refinery's Emergency Notification Procedures. The Contractor shall review the evaluation of the Refinery's Injury and Illness Prevention Program for determination of the program's level of compliance with the requirements of 8 CCR § 3203. The audit of the Injury Illness and Prevention Program will include safe and healthy work practices, communication to employees regarding occupational health and safety and reporting of hazards to the employer, procedures for identifying and evaluating work place hazards, procedures to investigate occupational injuries or illnesses, and methods for correcting unsafe working conditions. The Contractor shall also evaluate the Refinery's Process Hazards Analyses for determination of the Analyses' level of compliance with the requirements of 8 CCR § 5189(e). 6.2 Review and evaluate Unocal's Incident Tnvestigation Program from nonprivilt-ged Unocal incident investigation records from 1992 to pre-sent. The Contractor shall review the Refinery's Incident Investigation program using Cal/OSHA's "Guideline for Process Safety Management Audit" prepared for 8 CCR § 5189(m) attached (Attachment A to Exhibit 1). Nonprivileged incident reports of spills or releases from 1992 to present which resulted in or had the potential for a spill or release of hazardous materials will be summarized to determine possible patterns or trends in the Refinery operations. The Contractor will also review the incident reports for determination of root cause analyses and completion of all identified action items resulting from the incident investigation. The Contractor will pay particular attention to the odor abatement compressors. %0201.fm - 7 - D-� 6.3 Review and evaluation of s 1 ted writt ng .rain T ra .erlur s forthe processes. The Contractor shall review selected Unocal written operating procedures and evaluate for adequacy utilizing the "Guideline for Process Safety Management Audit" prepared for 8 CCR § 5189(f) (Attachment B to Exhibit 1) by the Cal/OSHA Consultation Service. A minimum of three operating procedures for refining units will be reviewed. The units selected will be high on the priority order list that the refinery developed for Process Safety Management, 8 CCR § 5189(e) (Process Hazards Analysis). 6.4 Review and evaluation of the Comtor Training Programincluding an_�,ahl training on n=ew n�ediireq, emergencysbutdowns., emergency res ons ./nQ ificstion jimeedures, and certification of emnloyms. The Contractor shall review and evaluate the Unocal Operator Training Program for adequacy, utilizing the "Guideline for Process Safety Management Audit" prepared in accordance with 8 CCR § 5189(g) (Attachment C to Exhibit 1) by the Cal/OSHA Consultation Service. 6.5 Review evaluation of contractor urogram and s andards for contractor -analifi .ations. The Contractor shall review and evaluate the Unocal Contractor Training Program for adequacy utilizing the "Guideline for Process Safety Management Audit" prepared in accordance with 8 CCR § 5189(h) (Attachment D to Exhibit 1) by the Cal/OSHA Consultation Service. C.6 Review of Unneal oversight of contract workers. The Contractor shall review the oversight by Unocal of contract workers utilizing the attached questions (Attachment E to Exhibit 1). %mol.fm - 8 - 6.7 Review of the Quality acci�rance progmm forTnncitive materials (equipment) identification and confirmation of satisfied design standard . The Contractor shall review the Unocal quality assurance program for positive materials identification and confirmation of satisfied design standards for adequacy utilizing the "Guideline for Process Safety Management Audit" prepared in accordance with 8 CCR § 51890) (Attachment F to Exhibit 1) by the Cal/OSHA Consultation Service. C.8 Review of the preventive and predictive maintenance program, in .lc i the frqn .ncy of inspections and standards for determination of acre to ahle testes/inspectinn results. The Contractor shall review the Unocal preventive maintenance program for adequacy, utilizing the "Guideline for Process Safety Management Audit" prepared in accordance with 8 CCR § 51890) (Attachment F to Exhibit 1) by the Cal/OSHA Consultation Service. The Contractor shall include a review of the maintenance and inspection records of the odor abatement compressors and flare system and make recommendations as appropriate. 6.9 Review and Evaluate the Unocal Management of('.hanvP�nrnZ m and imnlementntinn of program. The Contractor shall review and evaluate the Unocal Management of Change program for adequacy utilizing the "Guideline for Process Safety Management Audit" prepared in accordance with 8 CCR § 5189(1) (Attachment G to Exhibit 1) by the Cal/OSHA Consultation Service. At least three Management of Change documents that deal with process changes and that have been completed in the two years preceding the audit will be reviewed for completeness and interface issues with the various Unocal departments. %Moi.rm - 9 - 6.10 Revif-.w and evaluate- n pnrtinn of TTnncal'c Tnss rnntrnl Management poliri .s and lirocedums. The Contractor shall review and evaluate Unocal Refinery's Loss Control Management programs, policies, and procedures for Leadership and Administration, General Promotions, Personal Communication and Group Communication. The sub-elements of these programs that are to be reviewed and evaluated by the Contractor are attached. (Attachment H to Exhibit 1). 6.11 Review of the statin of the TTnnc-al action items resulting from Cntaenrh release (corrective action nlan). The Contractor shall review and audit the Unocal Catacarb Corrective Action Plan (Attachment I to Exhibit 1) to verify completeness and status of action items. 6.12 Review of TUnneal's corrective action plans, addressing the RAAO MD find and recommendations that have hepn nrnvided to Unocal. The BAAQMD and the Contra Costa County Health Services Department ("CCCHSD") will review Unocal's corrective action plans and implementation schedules to address findings and recommendations of the BAAQMD that have been provided to Unocal regarding the incidents described in the recitals to this Agreement. No work under this item shall be performed by the Contractor. The results of the review by the BAAQMD and the CCCHSD shall be issued in a report separate from the report of the Contractor. This deliverable shall be distributed in accordance with Section 8 below. 7. RmDjoy ee Tnterviem. In performing the Audit Work, the Contractor may, from time to time, conduct formal interviews of Unocal employees. These formal interviews %02o1.rm - 10 - D.7 shall be attended only by the Contractor, the employee to be interviewed, and the designated representative of the employee that may otherwise be required by law or contract (e.g. Union Steward, personal attorney, etc.). The Contractor may provide an oral summary of such interviews during any public meeting described in this Agreement. Unocal shall make all reasonable efforts to make an employee requested by the Contractor available for an interview. 8. Project Deliverables, 8.1 The County will require the Contractor to prepare auditing protocols for this audit for review by. County, the Audit Monitor's Group and Unocal. The additional members of the Contractor Selection Panel may also review and comment on the Contractor's protocols, if they so choose. These protocols must cover all Audit subjects as defined in the Scope, except those for which Cal-OSHA Process Safety Management protocols are included in the Scope of Work. Protocols should include auditing methodology, applicable regulatory requirements, physical inspections, employee interviews and sampling methodology. At least two weeks will be allowed for Unocal's review and comment on the auditing protocols. 8.2 The Contractor shall be required to deliver a final Audit Report (the "Final Report") including an executive summary and a layman summary (if different from the executive summary). The Final Report shall also include a summary of the elements of the Audit, delineating any regulatory compliance exceptions in the tabular format shown in Attachment 7 to Exhibit 1. The Contractor shall be required to complete and finalize the Final Report at the Refinery at the conclusion of the Audit. W201.fm - 11 - P ,J 8.3 The Parties agree that the Final Report will be released to the public after it has been distributed as described in 8.2 above. The County will require the Contractor to deliver to the County Project Manager any written work products from the performance of the Audit work, including but not limited to any annotated auditing protocols, notes, written summaries of employee interviews, or memoranda. 8.4 The Contractor shall be required by the County to meet periodically during the Audit with the County Project Manager, the Unocal Project Manager, and the Audit Monitors Group to review audit progress and status. 8.5 The Contractor shall hold a closing conference with the County Project Manager, the Unocal Project Manager and the Audit Monitors Group on the last day of the Audit to discuss the Audit results and deliver the Final Report. 8.6 Unocal agrees that the Contractor will return to the Refinery to complete a review and evaluation of the Refinery's actions that were the result of the Audit. This Follow-up Audit will be scheduled approximately six months after the completion of the Audit at a date and time mutually agreeable to Unocal and the County. Such a Follow-Up Audit will consist primarily of a review of Unocal's action plans and records related to Unocal's progress on stated actions in the Final Report. The Follow-Up Audit will not be a reiteration of the original Audit and will not include formal employee interviews. The Contractor will provide a written report on the results of this Follow-up Audit to the County Project Manager, the Unocal Project Manager, and the Audit Monitors Group. W201.fn - 12 - D7 8.7 No materials will be removed from the refinery during the course of the Audit without express written permission from the Unocal Project Manager. This provision applies to the Contractor, County staff, and Designee. 9. Acceptance of Wnrk, The County and Unocal Project Managers jointly shall determine the acceptable completion of the Audit Work and Final Report according to the requirements of this Agreement. 10. Crn�'g Contract with C_nntractnr. County's contract with the Contractor (the "Audit Agreement") shall include the following provisions. 10.1. Default and Termination. If bankruptcy proceedings shall be commenced by or against Contractor; or if, except for any of the reasons stated in Section 23; Contractor shall fail, neglect, refuse or be unable at any time during the course of the Audit Agreement to perform the Audit Work at a rate deemed sufficient by County or to give reasonable assurance that Contractor will complete the same in accordance with the specifications of the Audit Agreement; or if Contractor shall default in its performance of a material representation, warranty or guarantee or other provision of the Audit Agreement; then County, without prejudice to any of its other rights or remedies, may terminate the Audit Agreement for service entered into with Contractor forthwith by'giving written Notice of Termination to Contractor; 10.2. In addition, County and Unocal may jointly in their discretion terminate the Audit Work with or without cause at any time by giving written Notice of Termination to Contractor. Termination by County and Unocal in accordance with the provisions herein shall W201.fm - 13 - 10 not constitute a breach of this Agreement nor entitle Contractor to any damages or claims except for compensation for Audit Work performed to the date of termination, including reasonable demobilization charges, subject to prior Unocal approval. 10.3. Audit Start nate. The Contractor's proposed Audit start date shall be approved in advance by the Unocal Project Manager, which approval shall not be unreasonably withheld. The County will make its best effort to adhere to its planned schedule attached as Exhibit 2. Where that schedule needs to be modified, Unocal will be notified.in advance of any material changes. 10.4. C'nct of Audit. The Audit shall be performed on a fixed-price basis, on a price mutually agreeable to County and Unocal. The Cost for the Audit shall include production of Audit protocols, a meeting to review the protocols with the Project Managers, the onsite Audit Work, production of the Final Report, opening and closing conferences, and any post-Audit meetings. Any modifications to the Audit Work that result in a price increase must be approved by Unocal in advance. All work associated with a Follow-Up Audit shall be performed on a time and materials basis. No mark-up on travel expenses will be permitted. 10.5. Invoices. Contractor shall provide all invoices for work to County. After review by County, County shall forward all such invoices to Unocal. Unocal shall remit payments owed under the invoices (unless disputed by Unocal) within 30 days of receipt by Unocal. 10.6. Change in Wnrk. No change in the Audit Work shall be undertaken by Contractor without the prior express written approval of County and Unocal. If County and MoLfim - 14 - Unocal authorize a change to the Audit Work, Contractor shall complete the additional work on a time-and-materials basis in accordance with the rates accepted at the time of the Contractor's audit proposal. 10.7. Site Acs&-, . All onsite Contractor employees must complete Unocal's standard Refinery Safety Orientation Training and execute a standard Unocal agreement for the protection of trade secrets prior to being provided access to the Refinery and prior to the commencement of the Audit work in the Refinery. County will remove from the Audit at Unocal's request any Contractor representative who, in the opinion of Unocal, is incompetent, disorderly, or otherwise unsatisfactory. 10.8. Contractor must agree to release, protect, indemnify and hold Unocal, its parent, its subsidiary and/or affiliate companies, and the respective employees, officers, directors, or agents thereof, free and harmless from and against any and all claims, liability, demands, and causes of action of all kinds, including, but not limited to, claims of damage to or loss of property of Unocal or others, injury, illness, or death , arising out of Contractor's, County's and Monitors' activities under the Audit Agreement, in the same manner and to the same extent as Contractor provides such protections to County. 10.9. Tnsurance. Contractor shall be required to obtain and maintain insurance of the same types and extent as are required by the County for its construction contracts and which names Unocal as an Additional Insured with respect to liability arising out of Contractor's performance under the Audit Agreement. s�a¢oi.rm - 15 - D .� 10.10 Fora' Majeure. If, within a reasonable time after a force majeure occurrence which has caused Contractor to delay performance of the Audit Work, Contractor has failed to take such action as Contractor could lawfully initiate to remove or relieve either the force majeure occurrence or its direct or indirect effects, the County may, in addition to any other right available to the County at law or in equity, in its discretion and after written notice to Contractor, at Contractor's expense, initiate such measures, including but not limited to, the hiring of third parties, as will be designed to remove or relieve such force majeure occurrence or its direct and indirect effects and thereafter require Contractor to resume full or partial performance of the Audit Work. 10.11. Miry on Conflirt of interest/Rosiness Condurt. Contractor must agree to perform the Audit Work and to conduct its affairs in respect to the Audit Agreement as follows: Wherever located, Contractor will be expected to conduct its operations in a lawful manner and in a manner which is consistent with the highest ethical standards prevailing in the business communities in which it operates. Books and records must be kept in a complete and accurate manner in accordance with Generally Accepted Accounting Principles consistently applied. The maintenance of the highest reputation for integrity is essential and is not in any circumstances to be sacrificed for the sake of results. Contractor must agree that it shall be the sole entity performing the Audit Work. 10.12 Contractor shall provide all necessary supervision, material, insurance, labor, transportation, equipment and supplies required to complete the Audit Work in W201.fm - 16 - � .7 accordance with the Audit Agreement. Telephones, copy machines, fax machines and office space will be made available by Unocal to the Contractor during the Audit. 10.13 Contractor shall be required to follow standard Unocal work requirements, including, but not limited to, orientation, training and security rules. The hours of contract work shall be 7:00 a.m. to 4:00 p.m., Monday through Friday excluding Refinery holidays. 10.14 Contractor shall submit to Unocal the names of specific Contractor personnel who will be performing the Audit to Unocal prior to the start date of the Audit. 11. Contrartnr's RPrnrds. 11.1. County shall provide Unocal with copies of all Contractor documentation in support of Contractor's invoices. Unless otherwise notified in writing by Unocal, invoices and supporting documentation shall be sent to: Unocal San Francisco Refinery 1380 San Pablo Avenue Rodeo, California 94509 Attn: Nancy Poloske 11.2. Unocal reserves the right to audit the invoice records of Contractor to the extent that such records apply to the Audit Work performed under this Agreement. 12. (fie in Wnrk. No change in the Contractor's Audit Work shall be approved by the County without the prior express written approval of Unocal, which approval shall not be unreasonably withheld. If Unocal authorizes a change to the Audit Work, Contractor shall %W01AM - 17 - � 7 complete the additional work on a time-and-materials basis in accordance with the rates included in the Contractor's contract with the County. 13. Indemnity. Prior to being provided site access to the Refinery and commencement of the Audit Work, County and any Designee must agree to release, protect, indemnify and hold Unocal, its parent, its subsidiary and/or affiliate companies, and the respective employees, officers, directors, or agents thereof, free and harmless from and against any and all claims, liability, demands, and causes of action of all kinds, including, but not limited to, claims of damage to or loss of property of Unocal or others, injury, illness, or death ("Claims"), arising out of Contractor's, County's and any Designee's activities in the conduct of the Audit under this Agreement, whether Unocal is negligent, actively, passively, or not at all, or Unocal is alleged or proved to be absolutely or strictly liable, or to have breached any duty or warranty (expressed or implied), except to the extent such Claims are shown by final judgment to have been caused by the sole negligence or willful misconduct of Unocal. The insurance requirements herein shall not be construed to limit this indemnity; it shall be effective to the maximum extent permitted by applicable law. County shall be solely responsible for the defense of any and all Claims hereunder, and any Claims by any person alleging the willful misconduct or sole negligence of Unocal until such time as a final judgment has been rendered. At such time as a final judgment has been rendered and it is determined that the claim or claims were the result of Unocal's sole negligence or willful misconduct, Unocal shall reimburse the County all reasonable litigation expenses, including costs of defense. The parties agree that should any court of competent jurisdiction determine 9W2o1.rM - 18 that the indemnitylrequired herein exceeds, in extent, scope, or amount, that which is permitted by applicable law, such indemnity shall be construed, interpreted and enforced so as to preserve the maximum indemnity which is permitted thereby. 14. She At-r--.q . The County Project Manager and any Designee must complete Unocal's standard Refinery Safety Orientation Training, and the Designee shall execute a standard Unocal agreement for the protection of trade secrets prior to being provided access to the Refinery and prior to the commencement of the Audit work in the Refinery. County will remove from the Audit at Unocal's request any County staff or Designee who, in the opinion of Unocal, is incompetent, disorderly, or otherwise unsatisfactory. 15. Audit Findings- The parties to this Agreement recognize that certain findings with respect to Refinery operations may result from the Audit. The County agrees that so long as Unocal in good faith diligently addresses such Audit findings, the County will forebear from pursuing any enforcement action relating to such findings. 16. Release_ Except as provided in Section 25, the County releases and forever discharges Unocal and its corporate parent, subsidiaries and affiliates, and each of their officers, directors, employees, and agents from any and all civil claims, causes of action, lawsuits, or litigation of any nature whatsoever, arising out of the incidents described on page one of Exhibit 1. 17. Relationship to nand Use permit_ The Parties to this Agreement agree that Unocal's obligations under this Agreement are not a part of or condition to Land Use Permit %0201.fm - 19 - 'D Number [2038-93] issued by the County for Unocal's Reformulated Gasoline Project (the "Land Use Permit"). 18. Cnnnt3r Review of Gnod Neighhor Agreement_ In consideration of Unocal's entering into this Agreement to conduct the Audit, the County agrees to complete, within 30 days of the effective date of this Agreement, its Zoning Administrator review of Unocal's June 30, 1995 quarterly report of its activities performed relative to the Good Neighbor Agreement and its request for final approval of the Good Neighbor Agreement, in accordance with Land Use Permit Conditions of Approval No. 77 and 78, respectively. If the report and Good Neighbor Agreement are acceptable to the County's Zoning Administrator, in his or her sole discretion, the County shall expressly inform Unocal of its approval, which shall be deemed full satisfaction of Land Use Permit Conditions numbers 77 and/or 78, respectively. If the report or the Good Neighbor Agreement are not acceptable to the County's Zoning Administrator, the County shall expressly inform Unocal and specifically describe the reasons for non-acceptance. 19. tnternretatinn of Agreement_ The Parties to this Agreement have participated in its drafting, and have consulted with their respective legal counsel in negotiating its terms. Any rule of construction to the effect that any ambiguity in the wording of a writing is to be construed against the drafter shall not be applied to the interpretation of this Agreement. 20. Fnr__Mai Majeure- 20.1 A delay in or total or partial failure of performance of either party except for the payment of money per the terms of the Agreement shall not constitute default, Moi.rm - 20 - suspension or termination under this Agreement or give rise to any claim for damages if and to the extent such delay or failure is caused by any force majeure occurrence demonstrably beyond the reasonable control of the party, provided that (1) the affected party gives prompt written notice to the other party of the circumstances constituting the occurrence and of the obligation or performance which is thereby delayed or prevented, and (2) such occurrences fall within one or more of the following categories: 20.1.1 acts of God; 20.1.2 expropriation, confiscation, requisitioning of or commandeering of all or part of the Refinery or compliance with any oral or written order, directive or request of any governmental authority or person purporting to act therefor or under such authority which affects to a degree not presently existing the supply, availability or use of materials, equipment or labor; 20.1.3 acts or inaction on the part of any governmental authority or person purporting to act therefor or under such authority; 20.1.4 acts of war or the public enemy whether war be declared or not; 20.1.5 public disorders; 20.1.6 insurrection, rebellion, sabotage or acts of terrorists; 20.1.7 explosions, fires, floods, earthquakes, lightning, hail, severe weather conditions, or other natural calamities; 20.1.8 riots or violent demonstrations; and 96MOI.rm - 21 - 20.1.9 strikes, boycott or job actions, whether direct or indirect, lawful or unlawful. 20.2 Any force majeure delay as defined herein shall be considered an excusable delay and the Contractor shall not be entitled to additional compensation or reimbursement as a result thereof, except that such a delay may be the subject of a claim for equitable adjustment if the County extends the delay beyond sixty (60) calendar days, or if the field work has commenced prior to the initiation of the delay and the County requires re-performance of some of the work done before the delay. 21. SevembiliM The invalidity or unenforceability or any modification to the Final Agreement or any attachments thereto that are not acceptable to the parties, herein of any portion or provision of this Agreement shall void the Agreement 22. Survival of Provisions, In order that the Parties may fully exercise their rights and perform their obligations under this Agreement arising from the performance of the Audit Work, such provisions of this Agreement required to ensure such exercise or performance shall survive the termination of this Agreement for any cause whatsoever. 23. Entirety of ARre .ment. This Agreement, as executed by authorized representatives of the Parties, constitutes the entire agreement between the Parties with respect to the subject matter of the Agreement, and there are no oral or written understandings, representations or commitments of any kind, express or implied, and all prior or contemporaneous oral or written understandings are either incorporated in this Agreement or are superseded. No oral or written modification of this Agreement by any officer, agent or WWI.& - 22 - employee of a party, either before or after execution of this Agreement, shall be of any force or effect unless such modification is in writing, is expressly stated to be a modification of this Agreement and is signed by duly authorized representatives of both parties. No waiver of any provision of this Agreement shall be of any force or effect unless such waiver is in writing, is expressly stated to be a waiver of a specified provision of this Agreement and is signed by the duly authorized representative of the Party to be bound by the waiver. Either Party's waiver of any breach or failure to enforce any of the terms, covenants, conditions or other provisions of this Agreement, at any time, shall not in any way affect, limit, modify or waive that Party's right thereafter to enforce or compel strict compliance with every term, covenant, conditions or other provision of this Agreement, any course of dealing or custom of the trade notwithstanding. Any documents, forms, receipts, etc. of either party which contain any terms or conditions shall be for informational or record purposes only. 24, No Third Partw Renefiriarv_ The terms of this Agreement shall not be deemed to confer any rights or benefits, as a third party beneficiary or otherwise, upon any person or entity other than the County and Unocal. 25. Limitation, Nothing in this Agreement to the contrary notwithstanding, nothing in this Agreement is intended to, nor shall it be construed to, prevent the necessary implementation by the County of state statutes and regulations or limit the independent civil and criminal prosecutorial authority of the Contra Costa County District Attorney. 26. Exerntion_ This Agreement may be signed in counterparts, all of which together shall constitute one original. 96MOl.fin - 23 - 1 27. F.ffectiv .T)ste_ The effective date of this Agreement is 1996. UNION OIL COMPANY OF CALIFORNIA Dated: , 1996 By: Its: COUNTY OF CONTRA COSTA Dated: , 1996 By: Its: - 24 - s SAFETY PROGRAM AUDIT A TRF.F.MF'NT The parties to this Safety Program Audit Agreement ("Agreement") are the Union Oil Company of California ("Unocal"), a California Corporation, and the County of Contra Costa, a political subdivision of the State of California (on behalf of the Board of Supervisors and the Health Services Department, hereinafter referred to as "County"). Collectively, Unocal and the County shall be referred to as the "Parties." RFC-TTAT 4 A. Unocal owns and operates an oil refinery located in Rodeo, California (the "Refinery"). B. In 1994 and 1995, several alleged releases of air emissions occurred at the Refinery which resulted in odor complaints by residents of Rodeo, Tormey, and Crockett, California, as identified in the attached Statement of Scope, which is attached as Exhibit 1 hereto. C. In response to these incidents and the associated complaints, the County desires to enter into an agreement with Unocal to perform a comprehensive safety audit, as defined below, at the Refinery. D. The audit performed under this Agreement will be conducted in addition to the audit performed under the Good Neighbor Agreement between Unocal and community groups �oi.rm D -7 in Crockett and Rodeo, California. The Good Neighbor Agreement required an independent audit of the Refinery's emergency response plan, emergency notification procedures, and safety management program, and of the results of the process hazards analyses performed as part of the Process Safety Management Program required by the federal and state Occupational Safety and Health Administrations. AjZreement NOW, THEREFORE, the Parties agree as follows: 1. Rpfn_= Safety Audit Statement of Scme. Unocal agrees to reimburse County for an independent audit contractor to perform a comprehensive safety audit (the "Audit") at the Refinery, as defined in the attached Statement of Scope (the "Scope"). The Scope is incorporated by reference, expressly made a part of this Agreement, and is attached as Exhibit 1 to this Agreement. 1.1 No revisions to the attached Scope will be.permitted under this Agreement without the prior written approval of Unocal, which approval shall not be unreasonably withheld. 1.2 In the event of any conflict between the text of this Agreement and its incorporated documents, including the attached Scope, the text of this Agreement shall govern. In the case of any conflict or inconsistency within or among any of the incorporated documents, the conflict or inconsistency shall be resolved by Unocal in writing. 2. Audit Prniectt Managers. There shall be two Project Managers during the Audit, one for each Party. 96 OLfn - 2 - D-7 2.1 The Project Manager for the County shall serve as the sole point of contact for Unocal during the Audit and shall be authorized to render any decision reserved to the County on behalf of the County. The County Project Manager shall be present on-site at the Refinery during any and all work performed by the Audit Contractor (defined below). 2.2 The Project Manager for Unocal shall serve as the sole point of contact for the County Project Manager and shall be authorized to render any decision reserved to Unocal on behalf of Unocal. The Unocal Project Manager shall oversee all work performed by the Contractor and shall coordinate all activities required to be performed by Unocal. The Unocal Project Manager shall coordinate all logistical matters at the Refinery including arranging any interviews of Refinery personnel. 3. Audit Monitoring. Seven (7) individuals, whose function is specifically described below, shall serve as the Audit Monitors ("Monitors"). 3.1 Members 3.1.1 The County shall select a total of four (4) members who are residents of Rodeo, Tormey, or Crockett, California to serve as Monitors. The eligibility criteria and roles of the Monitors are described below. No alternates shall be selected or permitted to serve in place of these County-selected Monitors. 3.1.2 The County Supervisors for Districts I and II shall serve as Monitors. With respect to these Monitors, each Supervisor may appoint a single alternate. The alternate appointed by each Supervisor shall serve as a Monitor only when the Supervisor %moi.fin - 3 - is unable to serve as a Monitor. The eligibility criteria and roles of the Monitors (and their Alternates) are described below. 3.1.3 One Monitor shall be a member of the Oil, Chemical & Atomic Workers Union International, AFL-CIO, Local 1-326 (the "OCAW").The eligibility criteria and roles of the Monitor are described below. 3.1.4 The County, the Supervisors for Districts I and II, and OCAW shall notify Unocal of their respective selected Monitors and Alternates as described above, at least thirty (30) days prior to the start date of the Audit, so that Unocal may confirm that the selected Monitors and alternates are eligible under the criteria set forth below. 3.2 Eliigihilit, Criteria. No Monitor or alternate shall be eligible to serve if the person has commenced any legal action against Unocal, is the spouse or dependent of any person who has commenced any legal action against Unocal, or is employed by any person who has commenced legal action against Unocal. 13 Audit Monitnrc CTrnun. The Monitors shall serve on the Audit Monitors Group. 3.3.1 The Audit Monitors Group shall participate on the Contractor Selection Panel to select the Audit Contractor, in accordance with the provisions of Section 4 of this Agreement. 3.3.2 The Audit Monitors Group may specify one designated person from within the Group ("Designee") to be present at and directly observe all work performed by the Contractor; provided, however, that the Designee shall neither participate in nor attend 96MOI.fin - 4 - p.7 any formal interviews of Unocal employees, which interviews shall be conducted as provided in Section 7 below. The Designee shall be permitted onsite at the Refinery only during those times in which the Contractor is also onsite unless expressly approved by the Unocal Project Manager, The Designee shall report his or her observations of the performance status of the Contractor's work to the Audit Monitors Group, at the Group's direction. 3.4 The County represents that its Counsel has reviewed the provisions of this Section 3 in accordance with the Brown Act and Contra Costa County Better Government Code and determined them to be in compliance therewith, at this time. 4. Selection of Audit C'nntrartnr, 4.1 A safety audit firm (the "Contractor") shall be selected by the Contractor Selection Panel, for recommendation to the Board of Supervisors, to perform the Audit Work set forth in the Agreement and attached Scope. The Contractor Selection Panel shall be composed of the Audit Monitors Group, the Unocal Project Manager or the Manager's designee, the County Project Manager or the Manager's designee, and, if they choose to participate, a representative of the California Office of Emergency Services ("OFS") and a representative of the California Division of Occupational Safety and Health ("Cal-OSHA"). If OES and Cal-OSHA choose to participate, the role of each agency shall be limited to participating in the selection of the Contractor. 4.2 Each bidder must provide labor rates and other direct costs to the County in its audit proposal. 9602o1.fm - 5 - t) 4.3 Each bidder must demonstrate auditing experience in the California Petroleum Refining Industry and must provide references for similar safety audit work completed for clients in the petroleum industry. 5. Conduct of Participants (fin-Site, 5.1 No photographs may be taken by Contractor, County staff, or any Designee without prior written permission by Unocal. 5.2 Contractor, County staff, and any non-OCAW-member Designee will be escorted by qualified Unocal personnel at all times while in the Refinery. Nomex clothing, hard hats, protective eye wear (including goggles in some areas), hearing protection, and safety shoes are required in specified areas of some facilities and are to be provided by Contractor when required. Unocal will provide safety equipment, excluding shoes, for County staff and any Designee if so requested at least one (1) week prior to the start date of the Audit. 6, Audit Work, The Audit Work shall consist of conducting a comprehensive safety audit of the Refinery as stated more fully below and in the attached Scope. 6.1 Review of the FOE international findin¢s from the •ndenendent safety audit conduntemi at the 11nacal Refinery pursuant to the Unwal Gand Neighbor Agreement. The Contractor shall review the findings from the evaluation performed by EQE International of the Refinery's Emergency Response Plan and procedures manual for determination of the level of compliance with the requirements of 8 CCR § 5192(q). The review shall include a review of the findings of the evaluation of the facility's past performance in implementing the s6MOI Am - 6 - Refinery Emergency Response Plan and the effectiveness of the Plan. The review shall include the evaluation of the effectiveness of the Refinery's Emergency Notification Procedures. The Contractor shall review the evaluation of the Refinery's Injury and Illness Prevention Program for determination of the program's level of compliance with the requirements of 8 CCR § 3203. The audit of the Injury Illness and Prevention Program will include safe and healthy work practices, communication to employees regarding occupational health and safety and reporting of hazards to the employer, procedures for identifying and evaluating work place hazards, procedures to investigate occupational injuries or illnesses, and methods for correcting unsafe worldng conditions. The Contractor shall also evaluate the Refinery's Process Hazards Analyses for determination of the Analyses' level of compliance with the requirements of 8 CCR § 5189(e). 6.2 Review and evaluate Unncal's incident Tnvesti.lZation Prol ram from nnn1)rivi1P¢PA ITna al innident investigation records frnm 1992 tnpres .n . The Contractor shall review the Refinery's Incident Investigation program using Cal/OSHA's "Guideline for Process Safety Management Audit" prepared for 8 CCR § 5189(m) attached (Attachment A to Exhibit 1). Nonprivileged incident reports of spills or releases from 1992 to present which resulted in or had the potential for a spill or release of hazardous materials will be summarized to determine possible patterns or trends in the Refinery operations. The Contractor will also review.the incident reports for determination of root cause analyses and completion of all identified action items resulting from the incident investigation. The Contractor will pay particular attention to the odor abatement compressors. 96MOI.fin - 7 - TO 6.3 .Review and evahnation of selected written n»erating nmceriures for the pm=%e . The Contractor shall review selected Unocal written operating procedures and evaluate for adequacy utilizing the "Guideline for Process Safety Management Audit" prepared for 8 CCR § 5189(f) (Attachment B to Exhibit 1) by the Cal/OSHA Consultation Service. A minimum of three operating procedures for refining units will be reviewed. The units selected will be high on the priority order list that the refinery developed for Process Safety Management, 8 CCR § 5189(e) (Process Hazards Analysis). 6.4 Review and evaluation of the QDmtor TrainingProgram, innhidinjZ applimhle training onn_ n�Prating pmcedures, emergency shUtdownc, emergency rens-/notification nromdures, and certification of eTlnv es. The Contractor shall review and evaluate the Unocal Operator Training Program for adequacy, utilizing the "Guideline for Process Safety Management Audit" prepared in accordance with 8 CCR § 5189(g) (Attachment C to Exhibit 1) by the Cal/OSHA Consultation Service. 6.5 - Review evaluation of contractor nmigram and standards for contractor -gvalifieatinns. The Contractor shall review and evaluate the Unocal Contractor Training Program for adequacy utilizing the "Guideline for Process Safety Management Audit" prepared in accordance with 8 CCR § 5189(h) (Attachment D to Exhibit 1) by the Cal/OSHA Consultation Service. 6.6 Review of TTnneal oversight of contract wnrkers. The Contractor shall review the oversight by Unocal of contract workers utilizing the attached questions (Attachment E to Exhibit 1). W201.fin - 8 - 6.7 Review of the quality accuranreTrogram for Dosi ive materials uinment)identification and confirmatian of satisfied design standard . The Contractor shall review the Unocal quality assurance program for positive materials identification and confirmation of satisfied design standards for adequacy utilizing the "Guideline for Process Safety Management Audit" prepared in accordance with 8 CCR § 51896) (Attachment F to Exhibit 1) by the Cal/OSHA Consultation Service. 6.8 Review of the nr .ventiv and nredictiv . maintenance program, includins� the frequency of inspections and standards for determinatinn of accen ahIe to 'nQ/insTn results. The Contractor shall review the Unocal preventive maintenance program for adequacy, utilizing the "Guideline for Process Safety Management Audit" prepared in accordance with 8 CCR § 51890) (Attachment F to Exhibit 1) by the Cal/OSHA Consultation Service. The Contractor shall include a review of the maintenance and inspection records of the odor abatement compressors and flare system and make recommendations as appropriate. 6.9 Review and evablite the Unocal Management of(-hangepr agram and implem _n ation of the nmgmm. The Contractor shall review and evaluate the Unocal Management of Change program for adequacy utilizing the "Guideline for Process Safety Management Audit" prepared in accordance with 8 CCR § 5189(1) (Attachment G to Exhibit 1) by the Cal/OSHA Consultation Service. At least three Management of Change documents that deal with process changes and that have been completed in the two years preceding the audit will be reviewed for completeness and interface issues with the various Unocal departments. %Moi.rm - 9 - 6.10 Review and evaluate a nation of TTnncal's T.nss Control Manag .m .nt poli i c and Droc Aures. The Contractor shall review and evaluate Unocal Refinery's Loss Control Management programs, policies, and procedures for Leadership and Administration, General Promotions, Personal Communication and Group Communication. The sub-elements of these programs that are to be reviewed and evaluated by the Contractor are attached. (Attachment H to Exhibit 1). 6.11 Review of the status of the TTnncnl action items resulting frnm Ca acarh r .l as . Corrective action Dian). The Contractor shall review and audit the Unocal Catacarb Corrective Action Plan (Attachment I to Exhibit 1) to verify completeness and status of action items. 6.12 Review of TTnncal's mrrective action plans, addressing the RAAO MD findings and rer_.nmmendations that have h pn nrnvided to Unocal. The BAAQMD and the Contra Costa County Health Services Department ("CCCHSD") will review Unocal's corrective action plans and implementation schedules to address findings and recommendations of the BAAQMD that have been provided to Unocal regarding the incidents described in the recitals to this Agreement. No work under this item shall be performed by the Contractor. The results of the review by the BAAQMD and the CCCHSD shall be issued in a report separate from the report of the Contractor. This deliverable shall be distributed in accordance with Section 8 below. 7. FF TnVee Interviews. In performing the Audit Work, the Contractor may, from time to time, conduct formal interviews of Unocal employees. These formal interviews 9W201.fm - 10 - shall be attended only by the Contractor, the employee to be interviewed, and the designated representative of the employee that may otherwise be required by law or contract (e.g. Union Steward, personal attorney, etc.). The Contractor may provide an oral summary of such interviews during any public meeting described in this Agreement. Unocal shall make all reasonable efforts to make an employee requested by the Contractor available for an interview. 8. Pmiert n .1'verahles. 8.1 The County will require the Contractor to prepare auditing protocols for this audit for review by. County, the Audit Monitor's Group and Unocal. The additional members of the Contractor Selection Panel may also review and comment on the Contractor's protocols, if they so choose. These protocols must cover all Audit subjects as defined in the Scope, except those for which Cal-OSHA Process Safety Management protocols are included in the Scope of Work. Protocols should include auditing methodology, applicable regulatory requirements, physical inspections, employee interviews and sampling methodology. At least two weeks will be allowed for Unocal's review and comment on the auditing protocols. 8.2 The Contractor shall be required to deliver a final Audit Report (the "Final Report") including an executive summary and a layman summary (if different from the executive summary). The Final Report shall also include a summary of the elements of the Audit, delineating any regulatory compliance exceptions in the tabular format shown in Attachment J to Exhibit 1. The Contractor shall be required to complete and finalize the Final Report at the Refinery at the conclusion of the Audit. 9W201.fm - 11 - 8.3 The Parties agree that the Final Report will be released to the public after it has been distributed as described in 8.2 above. The County will require the Contractor to deliver to the County Project Manager any written work products from the performance of the Audit work, including but not limited to any annotated auditing protocols, notes, written summaries of employee interviews, or memoranda. 8.4 The Contractor shall be required by the County to meet periodically during the Audit with the County Project Manager, the Unocal Project Manager, and the Audit Monitors Group to review audit progress and status. 8.5 The Contractor shall hold a closing conference with the County Project Manager, the Unocal Project Manager and the Audit Monitors Group on the last day of the Audit to discuss the Audit results and deliver the Final Report. 8.6 Unocal agrees that the Contractor will return to the Refinery to complete a review and evaluation of the Refinery's actions that were the result of the Audit. This Follow-up Audit will be scheduled approximately six months after the completion of the Audit at a date and time mutually agreeable to Unocal and the County. Such a Follow-Up Audit will consist primarily of a review of Unocal's action plans and records related to Unocal's progress on stated actions in the Final Report. The Follow-Up Audit will not be a reiteration of the original Audit and will not include formal employee interviews. The Contractor will provide a written report on the results of this Follow-up Audit to the County Project Manager, the Unocal Project Manager, and the Audit Monitors Group. 96MOI.en - 12 - 8.7 No materials will be removed from the refinery during the course of the Audit without express written permission from the Unocal Project Manager. This provision applies to the Contractor, County staff, and Designee. 9. Ac tanr . nnf Work. The County and Unocal Project Managers jointly shall determine the acceptable completion of the Audit Work and Final Report according to the requirements of this Agreement. 10. I'-rn_intv'c contract with C'_ontmrtnr. County's contract with the Contractor (the "Audit Agreement") shall include the following provisions. 10.1. Default and Termination. If bankruptcy proceedings shall be commenced by or against Contractor; or if, except for any of the reasons stated in Section 23; Contractor shall fail, neglect, refuse or be unable at any time during the course of the Audit Agreement to perform the Audit Work at a rate deemed sufficient by County or to give reasonable assurance that Contractor will complete the same in accordance with the specifications of the Audit Agreement; or if Contractor shall default in its performance of a material representation, warranty or guarantee or other provision of the Audit Agreement; then County, without prejudice to any of its other rights or remedies, may terminate the Audit Agreement for service entered into with Contractor forthwith by giving written Notice of Termination to Contractor; 10.2. In addition, County and Unocal may jointly in their discretion terminate the Audit Work with or without cause at any time by giving written Notice-of Termination to Contractor. Termination by County and Unocal in accordance with the provisions herein shall 96MOl.rm - 13 - .D .� not constitute a breach of this Agreement nor entitle Contractor to any damages or claims except for compensation for Audit Work performed to the date of termination, including reasonable demobilization charges, subject to prior Unocal approval. 10.3. Andit Start Date, The Contractor's proposed Audit start date shall be approved in advance by the Unocal Project Manager, which approval shall not be unreasonably withheld. The County will make its best effort to adhere to its planned schedule attached as Exhibit 2. Where that schedule needs to be modified, Unocal will be notified.in advance of any material changes. 10.4. rnst of Audit. The Audit shall be performed on a fixed-price basis, on a price mutually agreeable to County and Unocal. The Cost for the Audit shall include production of Audit protocols, a meeting to review the protocols with the Project Managers, the onsite Audit Work, production of the Final Report, opening and closing conferences, and any post-Audit meetings. Any modifications to the Audit Work that result in a price increase must be approved by Unocal in advance. All work associated with a Follow-Up Audit shall be performed on a time and materials basis. No mark-up on travel expenses will be permitted. 10.5. Invnices. Contractor shall provide all invoices for work to County. After review by County, County shall forward all such invoices to Unocal. Unocal shall remit payments owed under the invoices (unless disputed by Unocal) within 30 days of receipt by Unocal. 10.6. Change in Work, No change in the Audit Work shall be undertaken by Contractor without the prior express written approval of County and Unocal. If County and 960201.rm - 14 - --7 Unocal authorize a change to the Audit Work, Contractor shall complete the additional work on a time-and-materials basis in accordance with the rates accepted at the time of the Contractor's audit proposal. 10.7. Rite. ACCPSS. All onsite Contractor employees must complete Unocal's standard Refinery Safety Orientation Training and execute a standard Unocal agreement for the protection of trade secrets prior to being provided access to the Refinery and prior to the commencement of the Audit work in the Refinery. County will remove from the Audit at Unocal's request any Contractor representative who, in the opinion of Unocal, is incompetent, disorderly, or otherwise unsatisfactory. 10.8. Contractor must agree to release, protect, indemnify and hold Unocal, its parent, its subsidiary and/or affiliate companies, and the respective employees, officers, directors, or agents thereof, free and harmless from and against any and all claims, liability, demands, and causes of action of all kinds, including, but not limited to, claims of damage to or loss of property of Unocal or others, injury, illness, or death , arising out of Contractor's, County's and Monitors' activities under the Audit Agreement, in the same manner and to the same extent as Contractor provides such protections to County. 10.9. Ingilmnr. . Contractor shall be required to obtain and maintain insurance of the same types and extent as are required by the County for its construction contracts and which names Unocal as an Additional Insured with respect to liability arising out of Contractor's performance under the Audit Agreement. 96MOI.fm - 15 - 10.10 Fnrc_ e Mni urere. If, within a reasonable time after a force majeure occurrence which has caused Contractor to delay performance of the Audit Work, Contractor has failed to take such action as Contractor could lawfully initiate to remove or relieve either the force majeure occurrence or its direct or indirect effects, the County may, in addition to any other right available to the County at law or in equity, in its discretion and after written notice to Contractor, at Contractor's expense, initiate such measures, including but not limited to, the hiring of third parties, as will be designed to remove or relieve such force majeure occurrence or its direct and indirect effects and thereafter require Contractor to resume full or partial performance of the Audit Work. 10.11. Pnlir3� on Conflict of Interest/Rnsiness Condnct. Contractor must agree to perform the Audit Work and to conduct its affairs in respect to the Audit Agreement as follows: Wherever located, Contractor will be expected to conduct its operations in a lawful manner and in a manner which is consistent with the highest ethical standards prevailing in the business communities in which it operates. Books and records must be kept in a complete and accurate manner in accordance with Generally Accepted Accounting Principles consistently applied. The maintenance of the highest reputation for integrity is essential and is not in any circumstances to be sacrificed for the sake of results. Contractor must agree that it shall be the sole entity performing the Audit Work. 10.12 Contractor shall provide all necessary supervision, material, insurance, labor, transportation, equipment and supplies required to complete the Audit Work in 960 OI A, - 16 - accordance with the Audit Agreement. Telephones, copy machines, fax machines and office space will be made available by Unocal to the Contractor during the Audit. 10.13 Contractor shall be required to follow standard Unocal work requirements, including, but not limited to, orientation, training and security rules. The hours of contract work shall be 7:00 a.m. to 4:00 p.m., Monday through Friday excluding Refinery holidays. 10.14 Contractor shall submit to Unocal the names of specific Contractor personnel who will be performing the Audit to Unocal prior to the start date of the Audit. 11. Contractnr'c Reenrds. 11.1. County shall provide Unocal with copies of all Contractor documentation in support of Contractor's invoices. Unless otherwise notified in writing by Unocal, invoices and supporting documentation shall be sent to: Unocal San Francisco Refinery 1380 San Pablo Avenue Rodeo, California 94509 Attn: Nancy Poloske 11.2. Unocal reserves the right to audit the invoice records of Contractor to the extent that such records apply to the Audit Work performed under this Agreement. 12, rhange in Wnrk. No change in the Contractor's Audit Work shall be approved by the County without the prior express written approval of Unocal, which approval shall not be unreasonably withheld. If Unocal authorizes a change to the Audit Work, Contractor shall W201.rm - 17 - complete the additional work on a time-and-materials basis in accordance with the rates included in the Contractor's contract with the County. 13. Indemnitv. Prior to being provided site access to the Refinery and commencement of the Audit Work, County and any Designee must agree to release, protect, indemnify and hold Unocal, its parent, its subsidiary and/or affiliate companies, and the respective employees, officers, directors, or agents thereof, free and harmless from and against any and all claims, liability, demands, and causes of action of all kinds, including, but not limited to, claims of damage to or loss of property of Unocal or others, injury, illness, or death ("Claims"), arising out of Contractor's, County's and any Designee's activities in the conduct of the Audit under this Agreement, whether Unocal is negligent, actively, passively, or not at all, or Unocal is alleged or proved to be absolutely or strictly liable, or to have breached any duty or warranty (expressed or implied), except to the extent such Claims are shown by final judgment to have been caused by the sole negligence or willful misconduct of Unocal. The insurance requirements herein shall not be construed to limit this indemnity; it shall be effective to the maximum extent permitted by applicable law. County shall be solely responsible for the defense of any and all Claims hereunder, and any Claims by any person alleging the willful misconduct or sole negligence of Unocal until such time as a final judgment has been rendered. At such time as a final judgment has been rendered and it is determined that the claim or claims were the result of Unocal's sole negligence or willful misconduct, Unocal shall reimburse the County all reasonable litigation expenses, including costs of defense. The parties agree that should any court of competent jurisdiction determine 960201.fm - 18 - that the indemnity required herein exceeds, in extent, scope, or amount, that which is permitted by applicable law, such indemnity shall be construed, interpreted and enforced so as to preserve the maximum indemnity which is permitted thereby. 14. Site A req . The County Project Manager and any Designee must complete Unocal's standard Refinery Safety Orientation Training, and the Designee shall execute a standard Unocal agreement for the protection of trade secrets prior to being provided access to the Refinery and prior to the commencement of the Audit work in the Refinery. County will remove from the Audit at Unocal's request any County staff or Designee who, in the opinion of Unocal, is incompetent, disorderly, or otherwise unsatisfactory. 15. Audit Findings_ The parties to this Agreement recognize that certain findings with respect to Refinery operations may result from the Audit. The County agrees that so long as Unocal in good faith diligently addresses such Audit findings, the County will forebear from pursuing any enforcement action relating to such findings. 16. Release Except as provided in Section 25, the County releases and forever discharges Unocal and its corporate parent, subsidiaries and affiliates, and each of their officers, directors, employees, and agents from any and all civil claims, causes of action, lawsuits, or litigation of any nature whatsoever, arising out of the incidents described on page one of Exhibit 1. 17. Relationship to TAnd Use Permit, The Parties to this Agreement agree that Unocal's obligations under this Agreement are not a part of or condition to Land Use Permit �ozoi.rm - 19 - Number [2038-93] issued by the County for Unocal's Reformulated Gasoline Project (the "Land Use Permit"). 18. rn-nnt Review of Gnnd Neighhor Agreement_ In consideration of Unocal's entering into this Agreement to conduct the Audit, the County agrees to complete, within 30 days of the effective date of this Agreement, its Zoning Administrator review of Unocal's June 30, 1995 quarterly report of its activities performed relative to the Good Neighbor Agreement and its request for final approval of the Good Neighbor Agreement, in accordance with Land Use Permit Conditions of Approval No. 77 and 78, respectively. If the report and Good Neighbor Agreement are acceptable to the County's Zoning Administrator, in his or her sole discretion, the County shall expressly inform Unocal of its approval, which shall be deemed full satisfaction of Land Use Permit Conditions numbers 77 and/or 78, respectively. If the report or the Good Neighbor Agreement are not acceptable to the County's Zoning Administrator, the County shall expressly inform Unocal and specifically describe the reasons for non-acceptance. 19. Interpretation of Agreement_ The Parties to this Agreement have participated in its drafting, and have consulted with their respective legal counsel in negotiating its terms. Any rule of construction to the effect that any ambiguity in the wording of a writing is to be construed against the drafter shall not be applied to the interpretation of this Agreement. 20. ForceMajeure- 20.1 ajP ire- 20.1 A delay in or total or partial failure of performance of either party except for the payment of money per the terms of the Agreement shall not constitute default, %MO1.rm - 20 - suspension or termination under this Agreement or give rise to any claim for damages if and to the extent such delay or failure is caused by any force majeure occurrence demonstrably beyond the reasonable control of the party, provided that (1) the affected party gives prompt written notice to the other party of the circumstances constituting the occurrence and of the obligation or performance which is thereby delayed or prevented, and (2) such occurrences fall within one or more of the following categories: 20.1.1 acts of God; 20.1.2 expropriation, confiscation, requisitioning of or commandeering of all or part of the Refinery or compliance with any oral or written order, directive or request of any governmental authority or person purporting to act therefor or under such authority which affects to a degree not presently existing the supply, availability or use of materials, equipment or labor; 20.1.3 acts or inaction on the part of any governmental authority or person purporting to act therefor or under such authority; 20.1.4 acts of war or the public enemy whether war be declared or not; 20.1.5 public disorders; 20.1.6 insurrection, rebellion, sabotage or acts of terrorists; 20.1.7 explosions, fires, floods, earthquakes, lightning, hail, severe weather conditions, or other natural calamities; 20.1.8 riots or violent demonstrations; and 96MOI.fm - 21 - : 14 20.1.9 strikes, boycott or job actions, whether direct or indirect, lawful or unlawful. 20.2 Any force majeure delay as defined herein shall be considered an excusable delay and the Contractor shall not be entitled to additional compensation or reimbursement as a result thereof, except that such a delay may be the subject of a claim for equitable adjustment if the County extends the delay beyond sixty (60) calendar days, or if the field work has commenced prior to the initiation of the delay and the County requires re-performance of some of the work done before the delay. 21. SPvera�. The invalidity or unenforceability or any modification to the Final Agreement or any attachments thereto that are not acceptable to the parties, herein of any portion or provision of this Agreement shall void the Agreement 22. Survival of Provisions, In order that the Parties may fully exercise their rights and perform their obligations under this Agreement arising from the performance of the Audit Work, such provisions of this Agreement required to ensure such exercise or performance shall survive the termination of this Agreement for any cause whatsoever. 23. Entirety of Agreement. This Agreement, as executed by authorized representatives of the Parties, constitutes the entire agreement between the Parties with respect to the subject matter of the Agreement, and there are no oral or written understandings, representations or commitments of any kind, express or implied, and all prior or contemporaneous oral or written understandings are either incorporated in this Agreement or are superseded. No oral or written modification of this Agreement by any officer, agent or 96MOI.fin - 22 - �.7 employee of a party, either before or after execution of this Agreement, shall be of any force or effect unless such modification is in writing, is expressly stated to be a modification of this Agreement and is signed by duly authorized representatives of both parties. No waiver of any provision of this Agreement shall be of any force or effect unless such waiver is in writing, is expressly stated to be a waiver of a specified provision of this Agreement and is signed by the duly authorized representative of the Party to be bound by the waiver. Either Party's waiver of any breach or failure to enforce any of the terms, covenants, conditions or other provisions of this Agreement, at any time, shall not in any way affect, limit, modify or waive that Party's right thereafter to enforce or compel strict compliance with every term, covenant, conditions or other provision of this Agreement, any course of dealing or custom of the trade notwithstanding. Any documents, forms, receipts, etc. of either party which contain any terms or conditions shall be for informational or record purposes only. 24. No Third Parry Renefciarv_ The terms of this Agreement shall not be deemed to confer any rights or benefits, as a third party beneficiary or otherwise, upon any person or entity other than the County and Unocal. 25. Limitatinn. Nothing in this Agreement to the contrary notwithstanding, nothing in this Agreement is intended to, nor shall it be construed to, prevent the necessary implementation by the County of state statutes and regulations or limit the independent civil and criminal prosecutorial authority of the Contra Costa County District Attorney. 26. Execution- This Agreement may be signed in counterparts, all of which together shall constitute one original. %MOI.rM - 23 - t 27. Effective-Date_ .The effective date of this Agreement is 1996. UNION OIL COMPANY OF CALIFORNIA Dated: , 1996 By: Its: COUNTY OF CONTRA COSTA Dated: , 1996 By: Its: 960201.fm - 24 - >xTC:0(�nm�NntnNnmw>oM-namx;VwmTOOMovMozn'T MOow ( /.1 zm-zrppmmwOr- OOmv<Z2Xmmmmwz 5z CZ mOZZO n J/ O'Q O O Z Z<m c z m c z c r V m D D D i3<W<C D�-i D,W>,O c D D 3 M 0 -40r -I-ImDm-imm"OmrprrTCm'ommr xr'T�r- ' OZr rC Dc An D00. "'1m O :- -- 'i-i1 -{m -IA-AO�tn*z*2TOp W Cann -4 Om -� m mnn'V�OnnOnmC7-i O"�A T-i-0(n 10 CO n D. 2 O mppm�-i iA 4Z-10m-4000, MM --i <O Z Tv� O m -q W Wm-r0 3 0 W�<nm O Dz <3Zn -� Orvr Z. Am Zp og'go�IADp,TT CTO 'Mn MUmm�mmmrmr-m y z OA OOOOCfin p r r 3 ZMZZOT..�0 �Z C m bn-n- m:mZ r T 3p �ni 5 C:; 00005 �mr�rty O _Za N mm� rm �9 m Nm3m3 n -Zi �� _ V� W p3 m rZKZK m y v m Km mzyz n A C D A y rA m m� 0 O m M z ch '•`•O m co nZ 0 —4A mD aN D m <A N �rpM M m � c ;, m m m N m N N O m m 03 0-1 °'m v� w mm Wo Dm mz0 wm W C T N m Z N D r � am C vm Z Om 0 0 (n N D 0 N D 0 I— = CA °°D Ill A CD -n D m N C m m 0 N A T m o �^co D m f')D C n ,p j 0 Z A �2 m 0 D �v tir W r 1• N N ' �D Of W N O N V WC Z ...m 0 V A N N N A <s N c rn N zN,mD m F m W wA 0 Request to Speak Form ,) ,�( THREE (3) MINUTE LIMIT) Complete this form and place it In the box near the speakers' estrum before addressing the Board. 4PI-7/7 �rird,.t . if 2 3-�R573Name: �Iror�eL � Address: LC)-O d 1 am speaking for myself.+ or organization: ane of apni�tioN ONE: 1 wish to speak on Agenda flan #�� My comments will be: general _for._,*ain . I wish to speak on the wbject of 1 do not wish to speak but kava these comments for the Board to consider: Request to Speak Form(,D P, -7 ( THREE (3) MINUTE LIMIT) Co npiete this form and place it in the box near the speakers' rost um before addressing the Board N,tne: � rhone; z4�s/ �� 1 am speaking for nriw f,_,_,or organizatitm imine of 0 smdzm n 0 CH ONS 1 wish to on Apo& Otem # Oat 6 I wig t� mon tnuds will be: generalfbr_ _�Wnd_.. _ 1 do not wish to speak but leave these comments for the Board to consider: Request to Speak Form ( THREE (3) MINUTE LIMIT) Complete this form and place it In the box near the rostrum before addressing the Board. game: -Phone;- 5+, hone•S+, Wew s ,fir, lam speaking for myself- or organiratioro_ S1oeli ri e males of apnitatioN CHEC"NE: 1 wish to speak on Agenda Item4R�- Z -� My comments will be: :,U!e ;- s�ai 1 wish to speak on the abject 1 do not wish to speak but leave these comments for the Board to cor"idw: 4 —CIS-1996 '9:E aAP 1 FP..UP 1 ER.EP,;T FEPGUS0f,,I 510;3 i 199)3 P. 2 0 '1 G3 W:HI •J J.1V� � RECEIVE® P E T t T. . F T FEB — 61990 CLERK 0 CONTRACOSTACO�SORS WE OPPOSE THE UNOCAL-CQUNTY ST FF AL TQ 141 K ACTIVISTS AND CBE OFF THE SAPETY AU IiITT COMMITTEE OF THE UNOCAL REFINERY JUST BECAUSE THEY ARE PURSUING THEIR RIGHTS UNDER THE LAW TO HOLD UNOCAL MANAGEMENT ACCOUNTABLE! WE ALSO OPPOSE THE -REJECTION QE MAJORITY OF THE CQMMUNITY HE6LT & SAFETY ISSUES—FROM THE AUDIT SCOPE. WE DEMAND A REALUDIT OF ALL 1H ISSUES WITH EVERYONE INCLUDED} Name Address Phone r y f Qy ------S��-7 A k sa CA k,,�;L 72-7- 1 ks __- ---------- .�.s. -�-�o�1 �r�z.•i,.�.,Yr.. �- c tri c?cam -r- `Z�s? t$$Z. FPOt 1 EPEf'JT FE GIUSOf'J E'I Ct?871 933 P. 4 RECEIVED FEB - 6 19�6 �-�.-�-!-..,T 0 N SARD OF SUPERVISORS CONTRA COSTA CQ. WE OPPOSE THE NOOCAL-CQUNTY TQ KiGK Lt?GAL tA�,'TIVISTS AND-CUE-OFF THE SAFETY AUDIT COMMITTEE OF THE UNOCAL REFINERY JUST BECAUSE THEY AIDE PURSUING THEIR RIGHTS UNDER THE LAW TO HOLD UNOCAL MANAGEMENT ACCOUNTABLE! WE ALSO OPPOSE THE 8EJSCT oN aF IVIAJCl�3iT_ Y THE COMM ITY EALTH SAF TY iS5 S FROM THE AUDIT SCOPE. WE DEMAND A REAL AUNT Q-ULL THE ISSN$ V�1 ISH EVERYOi INCLUDED! Na a .Address Phone -a-T------- .� - --- -------------------- ----------------- _ - -_-_--------w_--__-_-- T6-� - _ ---_--_---------------------- . _ _ _ ------------------- ------------ -- -------- --- --1� ------------------- �"�_�a 7 !/ le ................... . . ------------------------ ------------------------ 4------------------- ------------.----------4----------_-..----_--`---------------------- -- 2-06-1.`_q'S 10:00AH FPOH EP,EP,JT FEP.GlJ 0t,,,l SIC,1727/ 1903 P. RECEIVE® T J-3 1 0 N 0 F S, U , p --p -,A_j�AB - 6 btb CLERK BOARD OF SUPERVISORS CONTRA COSTA CO. WE OPPOSE THEQALOLJNTY TAIrF PRCIPC7SAL TO KICK LOC -A& ATIVlST$ AN CSE OFF THE SAFETY AUQIT C,aMMITTFE OF THE UNOCAL REFINERY JUST BECAUSE THEY ARE PURSUING THEIR BIGHTS UNDER THE LAW TO HOLD UNOCAL MANAGEMENT ACCOUNTABLE! WE ALSO OPPOSE THE R JE � F MAJOIfTY OF TFiE 7OMIVi11NlTY HEALTH & SAFETY ISSUES FROM THE AUDIT SCOPE. WE DEMAND A REAL UNIT OF ALL THE ISSUES WITH FVERYOrVE INCLUDED! Name Address Phone .1 1 � � L7�2�1{� r2?^ �27s Z `7 r �1 ---1 � ?Z'^- --- `----5_S LCl t yZ _ a�✓ 'j '-:_X61 '__ 5 c - - 17 7 SOW T k-e- 7 L L If L L i A&Jf7 C4� _ .� ---------------- -�-��