HomeMy WebLinkAboutMINUTES - 06061995 - 1.77 , ro;. BOARD OF SUPERVISORS FILE: 135-9 3/C. 5.2 1 ,77 Contra FROM: BARTON J. GILBERT, DIRECTOR OF GENERAL SERVICES Costa - = County DATE: JUNE 6 1995 SUBJECT: APPROVING AND AUTHORIZING EXECUTION OF CHANGE ORDERS NO. 5 AND NO. 6 TO CONTRACT FOR REMODELING, 1305 MACDONALD AVENUE, RICHMOND FOR SOCIAL SERVICE DEPARTMENT (WH368D) SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I . RECOMMENDATION APPROVE Change Orders No. 5 and No. 6 to the Contract dated December 13, 1994, for Remodeling at 1305 MacDonald Avenue, Richmond, for Social Service Department, with West Bay Builders, Inc. of San Rafael, and AUTHORIZE the Director of General Services to execute Change Order No. 5, which increases the Contact Price by $100,732 . 00, and provides for the addition of plywood underlayment on the second and third floors, and Change Order No. 6, which increases the Contract Price by $34, 384 . 00, and provides for a change in the type of chiller to be provided. II . FINANCIAL IMPACT There are sufficient funds in the plant acquisition account to cover these Change Orders . III . REASONS FOR RECOMMENDATIONS/BACKGROUND A. Change Order No. 5 1 . Existing cementitious floor fill on the second and third floors has been removed because it was found to be cracked, deteriorated and contaminated with asbestos and was an unsuitable substrate for new flooring materials . X &fbA&&CONTINUED ON ATTACHMENT: YES SIGNATURE: RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S)- ACTION IGNATURE S:ACTION OF HOARD ON APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS 1 HEREBY CERTIFY THAT THIS IS A TRUE UNANIMOUS(ABSENT- AND CORRECT COPY OF AN ACTION TAKEN AYES: NOES: AND ENTERED ON THE MINUTES OF THE BOARD ABSENT: ABSTAIN: OF SUPERVISORS ON THE DATE SHOWN. Contact: Barton Gilbert (313-7100) q CQ See Page 2 ATTESTED � '- I I C 1. PHIL BATCHELOR,CLERK OF THE BOARD OF SUPERVISORS AND COUNTY ADMINISTRATOR V1382 (10/88) BY ,DEPUTY 13513B05 . 24A GB: ls Page 1 of 2 a APPROVING AND AUTHORIZING EXECUTION OF June 6, 1995 CHANGE ORDERS NO. 5 AND NO. 6 TO CONTRACT FOR REMODELING AT 1305 MACDONALD AVENUE, RICHMOND FOR SOCIAL SERVICE DEPARTMENT 2 . Change Order No. 5 will replace the removed floor fill with new plywood underlayment to provide a suitable substrate for the new flooring materials and will restore the finished floor elevations which existed before the old contaminated and deteriorated floor fill was removed. B. Change Order No. 6 1 . The Technical specifications allow the contractor to furnish and install a chiller that is too heavy for the building' s existing structural system, and that requires more electrical power than the building' s existing electrical system can provide. 2 . Change Order No. 6 will impose weight and electrical demand limits on the chiller used for this project. The chiller will be lighter, more compact and require less electrical power, so that costly structural and electrical alterations can be avoided. IV. CONSEQUENCES OF NOT ACTING If these change orders are not approved, the project will be delayed and will result in substantial - contractor claims for delay and extra lease payments for other temporary facilities which are housing the staff occupants of 1305 MacDonald Avenue during the remodeling. 13513B05 .24A GB:ls cc: General Services Department Architectural Division Accounting Administrator' s Office Auditor-Controller County Counsel Contractor (Via A.D. ) Consulting Architect (Via A.D. ) Page 2 of 2