HomeMy WebLinkAboutMINUTES - 06201995 - 1.16 TO: BOARD OF SUPERVISORS ACTING AS THE GOVERNING BODY OF THE CONTRA COSTA
COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT
FROM: J. MICHAEL WALFORD, CHIEF ENGINEER
DATE: June 20, 1995
SUBJECT: APPROVE JOINT EXERCISE OF POWERS AGREEMENT WITH THE CITY OF CLAYTON FOR
SPECIAL PROJECT TO REMOVE POLLUTANTS FROM RESIDENTIAL STORMWATER
RUNOFF, PROJECT NO. 0929-6X7046, CLAYTON AREA
SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION
1. Recommended Action:
APPROVE and AUTHORIZE Chief Engineer to execute a joint exercise of powers agreement with the
City of Clayton in the amount of$12,500 for the design, development and testing of control structure and
filter to remove pollutants from stormwater runoff generated by a fifty-four (54) unit residential
subdivision.
II. Financial Impact:
There will be no impact to General Fund. Joint exercise of powers agreement is funded with stormwater
utility fees collected by the Flood Control District on behalf of the nineteen (19) municipalities in the
Contra Costa Clean Water Program.
III. Reasons for Recommendations and Background:,
The San Francisco Bay Regional Water Quality Control Board requires the nineteen (19) municipalities
in the Contra Costa Clean Water Program conduct special studies to determine the effectiveness of best
management practices (BMPs) in removing pollutants from stormwater runoff. Runoff from new
development and construction sites has proven to be an important source of pollutants. As part of their
municipal stormwater permit, municipalities are constantly seeking effective BMPs that will remove these
pollutants in a cost efficient manner.
Continued on Attachment: x SIGNATURE: I/tn
RECOMMENDATION OF COUNTY ADMINISTRATOR
RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON �.o f 199 APPROVED AS RECOMMENDED OTHER
VOTE OF SUPERVISORS
UNANIMOUS(ABSENT )
AYES: NOES:
ABSENT: ABSTAIN:
ELG:fp
g:\FLDCTLW PDES\bo\Clay20.t6
Orig.Div: Public Works(CCCWP)
Contact: Donald P.Freitas(510)313-2373
cc: County Administrator E hereby certiy that this (a a
Community Development ftS and.co>red Copy of
Building Inspection an action taken and entered on the minutes of the
County Counsel Board of Supervisors on the date shown.
County Assessor ATTESTED:
County Treasurer-Tax Collector PHIL BAT ELOR,Clerk of
County Auditor-Controller of Supervisors and Court he Board
Chief Engineer ty Administrator
Accounting
Engineering Services -
By, .Deputv
SUBJECT: JOINT EXERCISE OF POWERS AGREEMENT WITH THE CITY OF CLAYTON FOR SPECIAL
PROJECT TO REMOVE POLLUTANTS FROM RESIDENTIAL STORMWATER RUNOFF
Page-2-
111. Reasons for Recommendations and Background: (cont.)
The City of Clayton will contract with Wollman&Associates to conduct a special study evaluating control
structures and filtration systems designed to remove oil and grease, sediments and other pollutants.
These control measures will be incorporated into a fifty-four(54) unit residential subdivision along Marsh
Creek Road in the City of Clayton. Wollman &Associates will conduct water quality tests to determine
the effectiveness of the control structures in removing pollutants. A written evaluation will also be
available for the municipalities in the Contra Costa Clean Water Program.
All nineteen (19) municipalities in the Contra Costa Clean Water Program will jointly fund this study
through this agreement between the City of Clayton and the Flood Control District. The Contra Costa
Clean Water Program municipalities must approve second and third year costs of this study at later
dates.
IV. Consequences of Negative Action:
The San Francisco Regional Water Quality Control Board may find that the Contra Costa Clean Water
Program is not conducting special studies as required in its Municipal NPDES Stormwater Permit. The
Regional Board has the authority to fine municipalities in the Contra Costa Clean Water Program up to
$25,000 per day for non-compliance with the permit.
JOINT EXERCISE OF POWERS AGREEMENT
BETWEEN CONTRA COSTA COUNTY FLOOD CONTROL
AND WATER CONSERVATION DISTRICT
AND CITY OF CLAYTON
Special Project to Remove Pollutants
from Residential Stormwater Runoff
1. Parties:
Effective , the CONTRA COSTA COUNTY FLOOD
CONTROL AND WATER CONSERVATION DISTRICT, a political subdivision of the
State of California, hereinafter referred as "DISTRICT," and the CITY OF
CLAYTON, a municipal corporation, hereinafter referred as "CITY," pursuant to
Government Code Section 6500 and following, mutually agree and promise as
follows:
2. Purpose and Scope of Work:
CITY is conducting a special study project, hereinafter referred as "PROJECT", to
measure the effectiveness of filtration systems in removing pollutants from
residential stormwater runoff. The study was approved by the nineteen
municipalities of the Contra Costa Clean Water Program, which includes seventeen
cities, Contra Costa County and the DISTRICT, and will be funded by stormwater
utility assessments levied by the DISTRICT. The purpose of this Agreement is to
apportion PROJECT duties and costs between CITY and DISTRICT.
3. Methods:
CITY shall perform the following activities:
a. Act as lead agency and comply with all environmental requirements pursuant
to California Environmental Quality Act.
b. Obtain all necessary permits for PROJECT.
C. Retain a qualified consultant approved by DISTRICT to conduct PROJECT.
d. Perform all necessary supervision and contract administration to ensure that
the PROJECT work complies with this Agreement.
e. Maintain PROJECT records and document project expenses.
f. Bill DISTRICT for PROJECT tasks described in Exhibit"A".
g. Prepare and deliver to DISTRICT a written report of all receipts and
disbursements.
DISTRICT shall perform the following activities:
a. Act as a responsible agency pursuant to California Environmental Quality
Act.
b. Consult with CITY, as necessary, to enable PROJECT work to be properly
completed.
C. Reimburse CITY for the PROJECT tasks described in Exhibit W.
4. Changes in Proiect Work:
The PROJECT work shall comply with acceptable engineering practices and shall
include all of the tasks set forth in Exhibit "A". Any changes in the PROJECT work
shall require the prior, written approval of DISTRICT.
5. Financial Responsibilities:
DISTRICT shall reimburse CITY for all costs of the PROJECT work, including
reasonable compensation for necessary review and contract administration
performed by CITY, as well as all costs of any changes or extra work requested or
approved in writing by DISTRICT. PROJECT task breakdown and the maximum
costs that DISTRICT shall pay for the entire PROJECT are set forth in attached
Exhibit "A".
6. Insurance and Hold Harmless:
a. The contract documents for PROJECT shall include provisions requiring the
consultant to: (1) obtain and maintain in full force and effect during the
PROJECT work, workers' compensation, public liability and property damage
insurance, in forms and limits of liability satisfactory to CITY and DISTRICT,
naming CITY and DISTRICT, their governing bodies, officers and employees
as additional insureds; and (2) promise to defend, indemnify, save and hold
harmless DISTRICT, its governing body, officers and employees from liability
to the same extent as promised to CITY. The aforementioned policy shall
contain an endorsement that the insurance afforded thereby to the additional
insureds shall be primary insurance to the full limits of the policy, and that
if any of the additional insureds have other insurance or self insurance
against a loss covered by such policy, such insurance or self insurance shall
be excess insurance only. Before beginning the PROJECT work, the
consultant shall submit to CITY and DISTRICT a certificate of insurance
evidencing the required coverages and requiring the carrier to give at least
30 days written notice to CITY and DISTRICT of any cancellation, non-
renewal or material modification of the policy. CITY shall be responsible for
ensuring that this requirement has been met before allowing the PROJECT
work to proceed.
b. Neither DISTRICT, nor any officer or employee thereof, shall be responsible
for any damage or liability occurring by reason of anything done or omitted
to be done by CITY in connection with any work delegated to CITY under
this AGREEMENT, and CITY shall defend, indemnify, save and hold
harmless DISTRICT, its governing body, officers and employees from the
same.
C. Nothing in this AGREEMENT is intended or shall be construed to affect the
legal liability of either party to third parties by imposing any standard of care
greater than that imposed by law.
7. Restrictions:
Pursuant to Government Code Section 6509, the powers of the parties under this
AGREEMENT shall be subject to the restrictions on such powers applicable to
CITY.
8. Agreement Modification:
This AGREEMENT shall be subject to modification only with the prior, written
consent of CITY and DISTRICT. Neither party shall unreasonably withhold its
consent to the implementation and accomplishment of the overall purpose for which
this AGREEMENT is drawn.
9. Agreement Expiration:
This AGREEMENT shall expire upon delivery of the report of receipts and
disbursements and payment of all funds specified herein, except for the provisions
of Section 6 which shall survive expiration of this AGREEMENT.
CONTRA COSTA COUNTY CITY OF CLAYTON
FLOOD CONTROL AND WATER
CONSERVATION DISTRICT
By: By:
hair, toard of Supe isors Mayor
ATTEST: ATTEST: , City Clerk
Phil Batchelor, C k of the Board
of Supervisors and County
Administrator By:
RECOMMENDED FOR APPROVAL RECOMMENDED FOR APPROVAL
J. Michael Walford, Chief Engineer
B By:
C n eer
By: By:
FORM APPROVED: FORM APPROVED:
Victor J. Westman, County Counsel , City Attorney
By: � d1,�6r;b. By:
Deputy
ELG:fp
g:\FLDCTLW PDES1Contract%J EPACLA.t6
June 8,1995
AMCII'IEM "A'
REVISED PROPOSAL
CLAYTON SPECIAL STUDY
PHASE L
Task A: Design, model test, and develop control structure(includes: construction of structure
and installation of filters).
• Wollman Associates(contracted) . . . . . . . . . . . . . . . . . . $8,000
• City Contract Engineer review of design and
model testing results and inspection of control
structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $2,500
• City staff administration involvement . . . . . . . . . . . . . . . . $500
Time period: March-June 1995
Total Task A . . . . . . . . . . . .. . .. . . .. . . . . . . . . . . . . . . . . $11,000
Task B: Prepartation of report on design, model test and construction of control structure.
• Wollman Associates (contracted) . . . . . . . . . . . . . . . . . . $1000
• City staff . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $500
Time period: June 1995
Total Task B . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . $1,500
Sub-totals by participant:
• Wollrnan Associates(contracted) . . . . . . . . . . . . . . . . . . $9,000
• City Engineer(contracted) . . . . . . . . . . . . . . . . . . . . . . . $2,500
• City staff . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000
Total . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $12,500