HomeMy WebLinkAboutMINUTES - 06131995 - 1.4 TO: BOARD OF SUPERVISORS
l• �
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: June 13, 1995
SUBJECT: Approval of Contract Change Order No. 7 for the Ygnacio Valley Rd./Cowell Rd.
Intersection Improvements, Project No. 0662-6R4221-92
Specific Request(s)or Recommendation(s)&Background&Justification
I. Recommended Action:
APPROVE Contract Change Order No. 7 in the approximate amount of $5,000.00 and
AUTHORIZE the Public Works Director to execute it in order to compensate the contractor, Oliver
De Silva (De Silva Gates) for work required to assure positive roadway drainage.
II. Financial Impact:
The project contingency funds are sufficient to cover this change order cost. The project is funded
.by Measure C (95%) and the City of Concord (5%).
III. Reasons for Recommendations and Background:
The cumulative total of Contract Change Orders Nos. 1 through 7 exceeds $25,000.00 requiring
Board Approval.
IV. Consequences of Negative Action:
Without approval the contractor Will not receive payment for work required.
Continued on attachment: _yes
SIGNATUR ' D�
RECOMMENDATION OF COUNTY ADMINISTRATOR
RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON: 13 CL5 APPROVED AS RECOMMENDED ✓ OTHER
VOTF F SUPERVISORS
UNANIMOUS (ABSENT_)
__A7ES: NOES:
ABSENT: ABSTAIN:
Contact: Joseph P. Murphy, (510) 313-2321
Orig. Div.: PW(Constr)
cc: County Administrator
Auditor-Controller
Public Works 1 hereby certify that this is a true and Correct copy of
- Design,V. Germany an action taken and entered on the minutes of the
- Accounting, R. Gilchrist Board of Supervisors on the date shown.
- R. Bruno ATTESTED:
Contractor PHIL BAtCHELOR,Cler t of the Board
of Supervisors and County Administrator
SE\tt i
g:\const\BO\YVC-13A.t6 BJAI" Deputy