Loading...
HomeMy WebLinkAboutMINUTES - 05091995 - 1.72 r� ,= Contra Costa TO: BOARD OF SUPERVISORS County f FROM: HARVEY E. BRAGDON ��J DIRECTOR OF COMMUNITY DEVELOPMENT DATE: May 9, 1995 SUBJECT: Ratification of the Zoning Administrator's Decision Regarding Shell Oil Company' s Compliance with Conditions of Approval (LUP 2009-92) SPECIFIC REQUEST (S) OR RECOMMENDATIONS) & BACKGROUND AND JUSTIFICATION RECOMMENDATIONS Ratify the Zoning Administrator' s decision that Shell Oil Company has complied with Condition of Approval #22 for the Hydrogen Plant. FISCAL IMPACT None. BACKGROUND/REASONS FOR RECOMMENDATIONS When the Board of Supervisors approved the Land Use Permit for Shell Oil Company' s Clean Fuels Project (County LUP #2009-92) , the Board specified that the Zoning Administrator' s decision regarding several conditions of approval be placed on the consent calendar for ratification. As directed by the Board at the October 4, 1994 meeting, the Zoning Administrator' s decisions discussed herein have been placed on the Zoning Administrator' s agenda for May 8, 1995. Any comments received at the meeting will be forward d to the Board.CONTINUED ON ATTACHMENT: %% YES SIGNATU RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF H-9-ARD COMMITTEE APPROVE OTHER SIGNATURE (S) : ACTION OF BOARD ON May 9 , 1995 APPROVED AS RECOMMENDED x OTHER VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A x UNANIMOUS (ABSENT TRUE AND CORRECT COPY OF AN AYES : NOES : ACTION TAKEN AND ENTERED ON THE ABSENT: ABSTAIN: MINUTES OF THE BOARD OF SUPERVISORS ON THE DATE SHOWN. Contact: Catherine Kutsuris (510/646-2036) ATTESTED May 9 , 1995 cc: Community Development Department (CDD) PHIL BATCHELOR, CLERK OF Health Services Department: RMPP THE BOARD OF SUPERVISORS Shell Oil (via CDD) AND COUNTY ADMINISTRATOR BY DEPUTY CK:db c:shl.bo Ratification of decision on Shell Oil Company May 9, 1995 Page Two Condition of Approval #22 : Hazard and Operability Study This condition requires Shell Oil to prepare a Hazard and Operability Study and accident consequence analysis for all elements of the Clean Fuels Project with the exception of the office building, the control rooms and the maintenance/warehouse buildings . Shell Oil Company completed the required study for the Hydrogen Plant. This information was evaluated by the Risk Management and Prevention Program Team of the Health Services Department. Their review included a detailed examination of the hazard analyses and off-site consequences as well as scrutiny of all the programs or aspects of the Company (e.g. , operating procedures, preventive maintenance programs and operator training) which are designed to prevent or mitigate accidents or process anomalies . The review included document assessments, management and operations personnel interviews and process "walk through" to verify documentation. In addition, Health Department staff inspected the unit to verify that the construction conforms to the design specified. The Health Services Department will conduct follow-up field inspections to ensure that all measures identified have been followed. CK:db c: shl .bo 5/9/95 Contra Costa County Health Services Department ENVIRONMENTAL HEALTH DIVISION HAZARDOUS MATERIALS/OCCUPATIONAL HEALTH DATE: April 21, 1995 TO: Catherine Kutsuris, Hing Administrator, Community Development Department FROM: Lewis G. Pascalli, Deputy Director - Health Services Departme , Hazardous Materials Division SUBJ: CONSENT ITEM FOR SHELL REFINERY CLEAN FUELS PROJECT CONDITION #f22 Executive Summary: The Contra Costa County Health Services Department (CCCHSD) Hazardous Materials Risk Management and Prevention Program team has completed the Clean Fuels reviews for Shell Refinery's Air Products and Chemicals Inc. hydrogen plant scheduled for start-up on May 16, 1995. Air Products and Chemicals Inc. will own and operate the hydrogen plant. Shell will supply the feed gases to the plant. Air Products will supply hydrogen and steam to Shell. The hydrogen plant will produce 88.5 mmscfd hydrogen at 99.9% purity. The plant will also export about 253,000 lb/hr of superheated steam. The feeds to the hydrogen plant will be a blend of Saturates Dry Gas, Flexicoker Dry Gas, Isomerization Vent Gas, Coker Dry Gas, Natural Gas, and Liquid Petroleum Gas. The trim fuel to the furnace will be refinery fuel gas. The feed to the plant is preheated and reformed in a down-fired, downflow box reformer. The reformed gas is further shifted to convert carbon monoxide to hydrogen and cooled by generating, steam, preheating feed, preheating boiler feedwater and makeup water. Final cooling is done against air and cooling water. Final hydrogen purification is performed in a 10-bed Pressure Swing Adsorbtion unit. The purge from this portion of the hydrogen plant provides the majority of firing to the furnace. The furnace utilizes low Nitrogen Oxide (NOX) burners and Selective Catalytic Reduction(SCR) technology. Heat in the flue gas is recovered into the steam system and by preheating combustion air. 4333 Pacheco Boulevard • Martinez, Califomia.94553 • (510) 646-2286 My staff has performed a detailed line-by-line examination of the Process Hazards Analysis performed for the unit mentioned above. Design of safety systems as well as operational and maintenance issues have been addressed. Additionally, my staff has inspected the unit to verify that it conforms to the design developed. My staff will perform a follow up review to ensure that all incomplete mitigations have been implemented. Conclusion: CCCHSD, Hazardous Materials Division Staff has completed the review of the hydrogen plant. We have concluded that identified hazards and items of concern have been resolved. Once the plant is functional, my staff will perform a follow-up review to ensure that all recommendations have been implemented. Attachment CONTRA COSTA COUNTY REVIEW OF CLEAN FUELS SYSTEM SHELL OIL COMPANY,MARTINEZ MANUFACTURING COMPLEX PURPOSE OF REVIEW As a condition for approval of Land Use Permit#2009-92 (Shell Oil Company Clean Fuels Project),Board Order Condition#22,.Contra Costa County Health Services Department (CCCHSD)Hazardous Materials Risk Management and Prevention Program team was requested to review.and evaluate the Clean Fuels systems for Shell Oil Company,Martinez Manufacturing Complex. SCOPE OF REVIEW The review of the Clean Fuels System at the Shell Oil Company includes a detailed examination of the hazard analyses and off-site consequences,as well as scrutiny of all of the programs or aspects of the business which are designed to prevent or mitigate accidents or process anomalies. For example,the design safety of new equipment,operating procedures,preventive maintenance programs,operator training,emergency operating procedures as well as emergency response planning,and audit procedures to ensure that these programs are being executed as planned will be reviewed and evaluated for efficacy. The review process occurs primarily on-site at the facility. The review includes document assessments,management and operations personnel interviews,Hazard and Operability Studies (HazOps)question and answer sessions,and process"walk throughs"to verify documentation, safeguards (process control and alarms, shutdowns,monitors,checklists,procedures,etc.)and recommendations from the HazOps. CONCLUSION At the conclusion of the review, CCCHSD staff will provide the facility with a list of findings, concerns, and outstanding questions. The facility will be required to clarify or respond to each item. CCCHSD will then issue a report to the Zoning Administrator,delineating the necessary and recommended corrections to the procedures,the documentation,and the facility. 3/15/95