Loading...
HomeMy WebLinkAboutMINUTES - 05091995 - 1.7 TO: BOARD OF SUPERVISORS, AS THE GOVERNING BODY OF THE CONTRA COSTA COUNTY FLOOD CONTROL & WATER CONSERVATION DISTRICT FROM: J. MICHAEL WALFORD, CHIEF ENGINEER DATE: May 9, 1995 SUBJECT: Approve Plans and Specifications and Advertise for bids for the San Ramon Creek Drop Structure Rehabilitation Project. Project No. 7520-669322-94, CP # 95 - 1. Specific Request(s) or Recommendation(s) & Background & Justification I. RECOMMENDED ACTION: APPROVE the Plans and Specifications for the Project and ADVERTISE for bids to be received on Thursday, June 8, 1995, at 2:00 p.m. DIRECT the Clerk of the Board to publish the Notice to Contractors in accordance with Section 21191 of the Public Contract Code, and II. FINANCIAL IMPACT: The estimated contract cost of the project is $220,000 funded by Flood Zone 3B (100%). III. REASONS FOR RECOMMENDATION/BACKGROUND: The project includes the reconstruction of portions of Drop Structure No. 4 and the repair of failed subdrainage systems at Drops 7, 8, 9, and 11 on,San Ramon Creek. Continued on Attachment: X SIGNATURE: _RECOMMENDATION OF COUNTY ADMINISTRATOR _RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON &.� 9) 199.5 APPROVED AS RECOMMENDED OTHER VOT OF SUPERVISORS UNANIMOUS (ABSENT ) AYES: NOES: ABSENT: ABSTAIN: BF:kd g:\Design\BO\BO9b.t5 Orig.Div: Public Works(Design Division) Contact: Bill Fernandez, i hereby certify that this Is a true and Correct co of 94 cc: Countymy Administrator PY Attn: E.Kuevor an action taken and entered on the minutes of the Pe Auditor-Controller Board of Su rvisors on the date shown. PW Accounting ATTESTED �Q26 AF 14 Construction 1995 Community Development PHIL BATCHEQR,Clerk of the Board of SupeMaors and County Administrator BY = .Deputy San Ramon Creek Drop Structure Rehabilitation Project May 9, 1995 Page Two The recent collapse of Drop Structure No. 5 was attributed to a failed subdrainage system, therefore, this project is needed to insure the long term function of these vital grade control structures along San Ramon Creek. The Chief Engineer has filed with the Board of Supervisors the Plans and Specifications for the project. r The general prevailing rates of wages, which shall be the minimum rates paid on this project, have been filed with the Clerk of the Board and copies will be made available to any interested party upon request. The Board reviewed and approved the project on February 28, 1995, and determined the project to be exempt from the California Environmental Quality Act as a Class 1 C Categorical Exemption. A Notice of Exemption was filed with the County Clerk on March 6, 1995. IV. CONSEQUENCES OF NEGATIVE ACTION: If the project is not approved for advertising, it will not be constructed this construction season.