Loading...
HomeMy WebLinkAboutMINUTES - 05091995 - 1.11 TO: BOARD OF SUPERVISORS, AS THE GOVERNING BODY OF THE CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT FROM: J. MICHAEL WALFORD, CHIEF ENGINEER DATE: May 9, 1995 SUBJECT: Contract Award Recommendation: Lindsey Detention Basin Interim Excavation Project - Alternate 1, Project No. 7566-6D8465-94, Oakley area Specific Request(s)or Recommendation(s)&Background&Justification RECOMMENDED ACTION: AWARD the contract for furnishing labor and materials for the subject project to DSS Company, the low bidder, who has also met the requirements of the County's Minority and Women Business Enterprise Contract Compliance Program, in the amount of$618, 473.00 and at the unit prices submitted; and REQUIRE the contractor to present surety bonds for Payment and Faithful Performance in the amounts of$309,236.50 and $618,473.00, respectively. DIRECT the Chief Engineer to prepare the contract for the project. AUTHORIZE the Chief Engineer to sign the contract on behalf of the Board subject to the Chief Engineer having reviewed and found sufficient all required documents, including the contract signed by the contractor, the aforementioned surety bonds, and a certificate of insurance. DIRECT that, in accordance with the project specifications and/or upon the execution of the contract by the Chief Engineer any bid bonds posted by the bidders be exonerated and any checks or cash submitted for bid security be returned. Pursuant to Public Contract Code Section 4114, the Board DELEGATES its functions under Public Contract Code Sections 4107 and 4110 to the Chief Engineer or his designee. Pursuant to section 6705 of the Labor Code, the Board also DELEGATES to the Public Works Director or to any registered civil or structural engineer designated by him the authority to accept detailed plans showing the design of shoring, bracing, sloping or other provisions to be made for worker protection during trench excavating covered by that section. FINANCIAL IMPACT: The project, including engineering and appropriate overhead ch is funded b Drainage Area 56 funds (100%). Continued on attachment: X ves SIGNATURE: RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER: SIGNATURE(S): ACTION OF BOARD ON-M" S APPROVED AS RECOMMENDED OTHER i° VOTE OF SUPERVISORS UNANIMOUS(ABSENT_) AYES: NOES: ABSENT: ABSTAIN: Contact: Joseph P.Murphy,(510)313-2321 Orig.Div.: PW(Constr) cc: County Administrator Auditor-Controller Public Works Accounting,R.Gilchrist Construction,R.Bruno Design,V.Germany Transp.Eng.,Heather Ballenger I hereby certify that this Is a true and correct copy of S.B.E.- an action taken and entered on the minutes of the 926 Natoma St. Board of Supervisors on the date shown. San Francisco,CA 94103-2514 ATTESTED: Contractor PHIL BATCHE R,CIA of the Boats RBitt of Supervisors and County Administrator g:\CONST\BO\LDB-9.0 - —�- \ By -_ �.Deputy Linc-fsey Detention Basin Interim Excavation Project, Project No. 7566-6D8465-94 Board Date: May 9, 1995 Page 2 of 2 RECOMMENDATION/BACKGROUND: The plans and specifications were approved and the project advertised for bids by the Board of Supervisors on March 21, 1995. The bids were received and opened at 255 Glacier Drive, Martinez, California, on April 20, 1995. The construction bids received were as follows: 1. DSS Company . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $618,473.00 2. De Silva Gates Construction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 655,333.72 3. William G. McCullough Company . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 697,481.84 4. Ghilotti Construction Company . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 712,543.45 5. Fanfa, Inc. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 732,877.59 6, Gabe Mendez, Inc. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 733,213.20 7. Granite Construction Company . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 836,850.00 8. Wolin& Sons, Inc. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 837,255.92 9. Hess Construction Company . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 919,769.10 10. Delta Excavating, Inc. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,199,458.00 The Engineer's estimated construction cost was $760,050.05.