HomeMy WebLinkAboutMINUTES - 04041995 - 1.3 ..tic
TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: April 3, 1995
SUBJECT: Approve and Authorize the Chair to Execute Program Supplement No. 101 Rev. 1 for the
Widening of Olympic Boulevard.
Project No.: 0662-6R4092-93.
SPECIFIC RBgUESTM OR RECOMMENDATION(S) & BACKGROUND AND JUSTIFICATION
I. Recommended Action:
APPROVE and AUTHORIZE the Chair of the Board of Supervisors to execute Program
Supplement No. 101 Rev.1 which provides $1,666,000 in Federal Aid funds for the widening of
Olympic Boulevard from Tice Valley Boulevard to Las Trampas Creek.
II. Financial Impact:
The supplement provides reimbursement from the federal government for 89% of the County's
estimated costs for the project. South Walnut Creek Area of Benefit funds and County road funds
will provide the remaining 11% of the funding for this project.
III. Reasons for Recommendations and Background:
On June 21, 1977 the Board approved the County-State Master Agreement No. 04-5928 for the
funding of Federal Aid Projects.
On July 29, 1992 Contra Costa County qualified for Federal funds to widen Olympic Boulevard.
Caltrans and the Federal Highway Administration have determined that the County can be
reimbursed for the County's estimated preliminary engineering, right-of-way, construction
engineering, and construction costs for the project.
Caltrans and the Federal Highway Administration determined o pril 5, 1994 that the project
meets the criteria for funding of no significant im act.
Continued on Attachment: X SIGNATURE: W T�
_RECOMMENDATION OF COUNTY ADMINISTRATOR
_RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ONO-fA:--L4 ) %9*'S APPROVED AS RECOMMENDED OTHER_
VOTE OF SUPERVISORS
UNANIMOUS(ABSENT
AYES: NOES:
ABSENT: ABSTAIN:
BS:eh
c:B04.t4 I hereby certify that this is a true and correct copy of
an action taken and entered on the minutes of the
Orig. Div: Public Works(TE)
Board of Supervisors on the date shown.
ATTESTED: �e-��Q� 4 � 9 9.S
Contact: B. Hersh,Tel.313-2355 '2��to$ PHIL BATCFVELOR,Clerk 4 the Board
cc: GMEDA Director of Supervisors and County Administrator
Accounting
C"
Dep utv
. _ 1. 3
Approve and Authorize the Chair to Execute Program Supplement No. 101 Rev. 1 for the Widening of
Olympic Boulevard.
April 4, 1995
Page 2
.IV. Consequences of Negative Action:
If this program supplement is not approved the County will have to absorb the entire cost of the
preliminary engineering, right-of-way, construction engineering, and construction costs for the
project.
Date: February 7, 1995
PROGRAM SUPPLEMENT NO. 101Rev. 1 Location: 04-CC -0-CR
to Project Number: STPL-5928 (005)
LOCAL AGENCY-STATE AGREEMENT E.A. Number: 04-069634
FOR FEDERAL-AID PROJECTS NO. 04-5928
This Program Supplement is hereby incorporated into the Local Agency-State
Agreement for Federal Aid which was entered into between the Local Agency
.and the State on 06/21/77 and is subject to all the terms and conditions
thereof . This Program Supplement is adopted in accordance with Paragraph 2
of Article II of the aforementioned Master Agreement under authority of
Resolution No. approved by the Local Agency on
(See copy attached) .
The Local Agency further stipulates that as a condition to payment of funds
obligated to this project, it accepts and will comply with the covenants or
remarks setforth on the following pages .
PROJECT TERMINI:
ON OLYMPIC BLVD FROM TICE VALLEY ROAD TO LAS TRAMPAS CREEK
TYPE OF WORK: ROADWAY WIDENING LENGTH: 0 . 9 (MILES)
PROJECT CLASSIFICATION OR PHASE (S) OF WORK
[XJ Preliminary Engineering [X) Right-of-Way [ )
[X] Construction Engineering [X) Construction
Estimated Cost Federal Funds Matching Funds
LocalSTATEMATCH OTHER
$ 1881848 33C $ 1666000 $ 0 $ 215848 $ 0
$ 0
COUNTY OF CONTRA COSTA STATE OF CALIFORNIA
Department of Transportation
BY �t c v✓ ! By
DEPUTY DISTRICT DIRECTOR OF
TRANSPORTATION, DISTRICT 4
Date Q"p,;,� - q�19 Date
Attest
Title CI
I hereby Certify upon my personal knowledge that budgeted funds are available for this encumbrance:
Accounting Officer _ u Date 2— 7 1881848 . 00
Chapter) Statutes I Item Year I Program 1BC1 Fund Source I AMOUNT
139 1994 2660-101-890 94-95 20.30.010.810 C 262040 892-F 906547.00
139 1994 2660-125-042 94-95 20.30.010.120 N 217000 042-T 215848.00
139 1994 2660-101-890 94-95 20.30.010.610 C 262040 892-F 759453.00
Page 1 of 2
By Deputy.
i .
04-CC -0-CR DATE: 02/07/95
STPL-5928 (005)
SPECIAL COVENANTS OR REMARKS
1 . This Revised Program Supplement supersedes Program Supplement
approved by the Local Agency' s Governing Body on 10/27/94
2 . All maintenance, involving the physical condition and the
operation of the improvements, referred to in Article VI
MAINTENANCE of the aforementioned Master Agreement will be
performed by the Local Agency at regular intervals or as required
for efficient operation of the completed improvements .
3 . The Local Agency will advertise, award, and administer this
project and will obtain the State ' s concurrence prior to either
award or rejection of the contract .
4 . The Local Agency agrees the payment of Federal funds will be
limited to the amounts approved by the Federal Highway
Administration in the Federal-Aid Project Agreement (PR-2) /Detail
Estimate or its modification (PR-2A) or the FNM-76, and accepts
any increases in Exchange Funds, State Matching funds, and\or
Local Agency Funds as shown on the Finance or Bid Letter or its
modification as prepared by the Division of Local Streets and
Roads .
5 . In executing this Program Supplemental Agreement, Local
Agency hereby reaffirms the "Nondiscrimination Assurances"
contained in the aforementioned Master Agreement for
Federal-Aid Program.
6 . whenever the local agency uses a consultant on a 'cost plus basis,
the local agency is required to submit a post audit report cover-
ing the allowability of cost payments for each individual consul-
tant or sub-contractor incurring over $25, 000 on the project .
The audit report must state the applicable cost principles utili-
zed by the auditor in determining allowable costs as referenced in
CFR 49, part 18, Subpart C - 22, Allowable Costs .
Page 2 of 2
Date: February 7, 1995
• PROGRAM SUPPLEMENT NO. 101Rev. 1 Location: 04-CC -0-CR
to Project Number: STPL-5928 (005)
LOCAL AGENCY-STATE AGREEMENT E.A. Number: 04-069634 �- 3
FOR FEDERAL-AID PROJECTS NO. 04-5928
This Program Supplement is hereby incorporated into the Local Agency-State
Agreement for Federal Aid which was entered into between the Local Agency
and the State on 06/21/77 and is subject to all the terms and conditions
thereof . This Program Supplement is adopted in accordance with Paragraph 2
of Article II of the aforementioned Master Agreement under authority of
Resolution No. approved by the Local Agency on 4 [ 4- lg S
(See copy attached) .
The Local Agency further stipulates that as a condition to payment of funds
obligated to this project, it accepts and will comply with the covenants or
remarks setforth on the following pages .
PROJECT TERMINI:
ON OLYMPIC BLVD FROM TICE VALLEY ROAD TO LAS TRAMPAS CREEK
TYPE OF WORK: ROADWAY WIDENING LENGTH: 0 . 9 (MILES)
PROJECT CLASSIFICATION OR PHASE (S) OF WORK
[X] Preliminary Engineering [X] Right-of-Way [ ]
[X] Construction Engineering [X] Construction
Estimated Cost Federal Funds Matching Funds
LocalSTATEMATCH OTHER
$ 1881848 33C $ 1666000 $ 0 $ 215848 $ 0
$ 0
COUNTY OF CONTRA COSTA STATE OF CALIFORNIA
Department of Fa�sportation
By �By
DEPUTY '� ISTRICT DIRECTOR OF
TRANSPO ATION, DISTRICT 4
Date Q�,p,;`� �• , q 95 Date 2S
Attest
Title
I hereby Certify upon my personal knowledge that budgeted funds are available for this encumbrance:
Accounting Officer C�(y r � Date 2- 7-ZS_ $ 1881848 . 00
Chapter Statutes I Item I Year I Program 113CI Fund Source I AMOUNT
139 1994 2660-101-890 94-95 20.30.010.810 C 262040 892-F 906547.00
139 1994 2660-125-042 94-95 20.30.010.120 N 217000 042-T 215848.00
139 1994 2660-101-890 94-95 20.30.010.810 C 262040 892-F 759453.00
FORM APPROVED
VICTOR J.VI TMAN, Co my Counsel Page 1 of 2
By Deputy �—.—� " Ti
04-CC -0-CR DATE : 02/07/95
' STPL-5928 (005)
SPECIAL COVENANTS OR REMARKS
1 . This Revised Program Supplement supersedes Program Supplement
approved by the Local Agency' s Governing Body on 10/27/94
2 . All maintenance, involving the physical. condition and the
operation of the improvements, referred to in Article VI
MAINTENANCE of the aforementioned Master Agreement will be
performed by the Local Agency at regular intervals or as required
for efficient operation of the completed improvements .
3 . The Local Agency will advertise, award, and administer this
project and will obtain the State ' s concurrence prior to either
award or rejection of the contract .
4 . The Local Agency agrees the payment of Federal funds will be
limited to the amounts approved by the Federal Highway
Administration in the Federal-Aid Project Agreement (PR-2) /Detail
Estimate or its modification (PR-2A) or the FNM-76, and accepts
any increases in Exchange Funds, State Matching funds, and\or
Local Agency Funds as shown on the Finance or Bid Letter or its
modification as prepared by the Division of. Local Streets and
Roads .
5 . In executing this Program Supplemental Agreement, Local
Agency hereby reaffirms the "Nondiscrimination Assurances"
contained in the aforementioned Master Agreement .for
Federal-Aid Program.
6 . Whenever the local agency uses a consultant on a cost plus basis,
the local agency is required to submit a post audit report cover-
ing the allowability of cost payments for each individual consul-
tant or sub-contractor incurring over $25, 000 on the project .
The audit report must state the applicable cost principles utili-
zed by the auditor in determining allowable costs as referenced in
CFR 49 , part 18 , Subpart C - 22, Allowable Costs .
Page 2 of 2