Adopted this Order on April 25, 1995 by the following vote:
AYES: Supervisors Rogers, Smith, DeSaulnier, Torlakson, Bishop
NOES: None
ABSENT: None
ABSTAIN: None
SUBJECT: Authorizing the Public Works Director to Arrange for Completion of
Improvements and release the developer from the requirement of the
subdivision agreement, Subdivision MS 108-88, Alamo area.
The Board on December 11, 1990, having approved a Subdivision Agreement with
Robert D. Stratmore, effective December 11, 1990, for construction of certain
improvements in Subdivision MS 108-88, Alamo area; and
The Public Works Director having reported that an acceptable agreement has been
arranged between the developer and the Public Works Department whereby the developer
will release all deposited funds to the Public Works Department and the Public Works
Department will use these funds to complete the improvements, all as described in the
attached letters dated April 5, 1995 from the Public Works Department and from the
developer; and
The Public Works Director having recommended that pursuant to the before
mentioned letters he be authorized to arrange for completing the work using the $1,000
cash deposit (Auditor's Deposit Permit No. 182002, dated November 21, 1990) and the
$23,150 cash deposit (Auditor's Deposit Permit No. 182124, dated November 27, 1990)
and any accrued interest; and
The Public Works Director having recommended that the developer also be
released from the obligations described in the subdivision agreement approved by the
Board on December 11, 1990.
IT IS BY THE BOARD ORDERED that the recommendation of the Public Works
Director is APPROVED.
I hereby certiy 00 fht fe a bw and am copy of
an action taken and entered on the rninutes of the
Board of Supervisors an the date Ili-n i
ATTESTED: A_.Dr l 25, 1995
PHIL BATCHELOR,Clerk of the Board
of Supervisors and County Adminlstrator
Contact: Rich Lierly- 313-2348
Originator: Public Works (ES) By ,Deputy
cc: Public Works -Accounting
- Construction
- Design
Administrator
Auditor-Controller
County Counsel
Robert D. Stratmore
P.O. Box 232
Alamo, CA 94507
g:\engsvclbo\bo25.t4
q e,
Contra Public Works Department P Michael Watford
I' Public Works Director
Costa. 255 Glacier Drive
CountCount Martinez, California 94553-4897 Milton F. Kubicek
y FAX: (510) 313-2333 Deputy-Engineering
Telephone: (510) 313-2000 Patricia R. McNamee
April 5, 1995 Deputy-Operations
Maurice M. Shiu
Deputy-Transportation
Mr. Robert Strathmore S. Clifford Hansen
P.O. Box 232 Deputy-Administration
Alamo, CA 94507
RE: MS 108-88
Dear Strathmore:
am writing to you as a follow up to my letter dated March 16, 1995. After meeting with
Milton Kubicek, Deputy Public Works Director, and Henry Finch, Engineer, both with the
County Flood Control District, it is our opinion that the improvement plans, developed by
DeBolt Civil Engineering and stamped as reviewed by the County on December 20, 1990,
are inadequate for the required creek bank stabilization. Moreover, it is our opinion that
the work as shown on these plans could not be done without an Environmental Impact
Report (EIR). The cost of an EIR is undeterminable but would probably be in the
neighborhood of $10,000. Furthermore, the Fish and Game and Army Corps Permits,
which would be required to construct the necessary creek improvements, would cost
approximately $5,000 each.The entire construction costs for the creek bank stabilization
along your minor subdivision frontage would be approximately $50,000, with permitting
fees adding an additional $20,000, bringing the entire cost for creek bank stabilization to
a total of $70,000. As you are aware, we are currently holding a cash bond for these
improvements totaling $24,150 plus interest. This amount is obviously far short of the
$70,000 that we feel it would actually cost to do this work.
The Flood Control District also feels that the plans submitted by DeBolt Civil Engineering
are inaccurate in that they do not show a sewer main which must be relocated along the
creek frontage of MS 108-88. The cost for the sewer main relocation is estimated at
$10,000.
In the Flood Control District's opinion it would be more efficient to take the $24,150 plus
interest you currently have on deposit and use it towards the area wide permits and plans
to improve Miranda Creek. Therefore, if you are willing to relinquish the entire $24,150
plus interest to Contra Costa County to be used for the creek improvements, we would
consider your subdivision improvements for Miranda Creek and Jennifer Lane as being
satisfied.
If you choose not to take this option then we must require that you submit revised
improvement plans showing the relocation of the sewer main. These plans must be
reviewed and approved by the Public Works Department. In addition, it would be required
for you to obtain your own Fish and Game and Army Corps permits. However, it is of our
opinion the most efficient remedy for this situation is for your cash bond to be added to the
cost of the overall area wide improvements to Miranda Creek. If you agree with our
conclusion, please submit a letter to Milton Kubicek, requesting that the County use the
$24,150 cash bond plus interest (less $2,500 for Jennifer Lane improvements) for area
wide improvements to Miranda Creek.
If you have any questions, please feel free call me at 313-2348.
Very tr ,
Ric ie
Associate Civil Engineer
Engineering Services Division
RL:mw
g:1engsvc\worMms108-88.t4
cc: M.Kubicek,Deputy Public Works Director
M.Avalon,Engineering Services
B.Faraone,Engineering Services
H.Finch,Flood Control District
R.Gilchrist,Accounting
D.Schmidt,County Counsel
Don Andres
Contempo Reality
671 San Ramon Valley Boulevard
Danville,CA 94526
APR-05-'95 WED 17:02 ID:00000000000000000000 TEL N0:510-935-4494 #405 P01
ROBERT D. STRATMORE
P.Q. BOX 232
ALAMO, . CA, 94507
TEL. 935--7800
FAX. 935-4494
April 5, 1995
VIA FACSIMILE 313-2333 & U.S. MAIL
RE- MS 108-88
Mx. Milton F. Kubicek
Public Works Deputy Director-Engineering
Contra Costa County Public Works Department
255 Glacier Drive
Martinez, CA. 94553-4897
Dear Mx. Kubicek:
Today, I received by facsimile a letter of even date from
Mr. Rich Lierly, Associate Civil Engineer, Engineering Services
Division, Contra Costa County Public Works Department with respect
to the above-noted minor subdivision in Alamo. in addition to
Mr. Lierly' s letter, attached also was a copy of a Memorandum
dated April 4, 1995 from Mr. Lierly to Mr. Frank Lew, Director of
Building Inspection Department.
In Mr. Lierly's letter to me, he asked me to respond to you
concerning the county's offer to me spelled out in Mr. Lierly' s
letter of today regarding my agreement to hereby tender the cash
bond of $24,150 plus interest (less a set-aside for Jennifer Lane
improvements , to be completed by one or both of the buyers of
parcels B and C, APN 192-280 -017 and 018, of $2 ,500 from my bond
proceeds) . In exchange for my approval as outlined in Mr. Lierly' s
aforementioned letter and this letter itself, the county will
" . ..consider your subdivision improvements for Miranda Creek and
Jennifer Lane as being satisfied. " I 'hereby accept the County ' s
offer as outlined in the aforementioned letter received by
facsimilie from Mr. Lierly today.
Please confirm that you have received this acceptance letter,
Thank you.
Sincerely,
1 _
Robert D. Stratmore
cc w/enc. Don Andres, Contempo Realty (By Fax)