Loading...
HomeMy WebLinkAboutMINUTES - 03281995 - 1.1 (2) Y1 /-i° TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: MARCH 28, 1995 SUBJECT: ACCEPT THE STATUS AND EXPENSE REPORT THROUGH THE SECOND QUARTER OF FISCAL YEAR 1994-95, CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT Specific Request(s)or Recommendation(s)&Background&Justification I. Recommended Action: ACCEPT the Canyon Lakes Geologic Hazard Abatement District (GHAD) Status and Expense Report for the second quarter of Fiscal Year 1994-95. II. Financiallmpact: There is no impact to the County General fund. III. Reasons for Recommendations and Background: During the second quarter, the District constructed the barge for use in the horizontal drain drilling program around the perimeter of the lake. As to the status of the budget, the construction costs through the second quarter of$74,536.00 are approximately 47% of the annual construction budget, and the total expenses through this quarter of$162,620.00 are approximately 54% of the total annual budget. IV. Consequences of Negative Action: The quarterly report will not be accepted as required by original formation of the GHAD. Continued on attachment: _yes SIGNATURE: RECOMMENDATION OF COUNTY ADMINISTRATOR 71 RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON: MAR 2 8 M APPROVED AS RECOMMENDED OTHER V70F SUPERVISORS ✓✓ UNANIMOUS (ABSENT ) AYES: NOES: ABSENT: ABSTAIN: I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervis rs�mild�q�own. ATTESTED: 't�� � J PHIL BATCHELOR,Clerk of the Board of Supervisors and County Administrator SE:pe\sd g:\EngSvc\SpDist\GHAD2-28.t3 gy �A&=�,Deputy Orig.Div.: PW(Special Districts) Contact: Skip Epperly,(510)313-2253 cc: Auditor-Controller Accounting Nystrom Engineering CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT 4'10 REPAIR AND IMPROVEMENT PROJECTS 1994-1995 FISCAL YEAR - CONSTRUCTION STATUS Est. Budget Actual Cost Category (FY'94/'95) (July-Dec.) Slope Stabilization 1. Corrective Grading 21,000.00 0.00 2. Revegetation 20,000.00 28,086.39 3. Slope Erosion Protection 20,000.00 0.00 4. Retaining or Pin Walls 10,000.00 1,248.34 Surface Drainage Improvements 5. Maint. B-58 Drain Syst. 8,000.00 0.00 6. Const. B-58 Drain. Syst. 4,000.00 6,845.71 7. Storm Drain Maintenance 5,000.00 178.50 8. Erosion/Runoff Cont. Devices 7,000.00 0.00 Subsurface Drainage 9. Subdrain Insp. and Maint. 8,000.00 560.00 10. Horiz. Drain Insp. and Maint. 20,000.00 0.00 11. Drilling Horiz. Drains 20,000.00 10,494.22 Repair of Existing Improvements 12. Insp. and Repair of Drain Struct. 10,000.00 0.00 13. Other Construction Projects 6.000.00 27.123.08 TOTAL $ 159,000.00 $ 74,536.24 47% CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT FINANCIAL REPORT FY '94-'95 February 15, 1995 BUDGET ACTUAL EXPENSES A. SAVINGS ACCOUNT JUL '94-JUN '95 JUL '94-DEC '94 1. Balance (Reserve) brough forward $627,000. 2. Annual Income via Assessments: $293,000. 743 Singele Family Detached 469 Townhouses 2,576 Condominiums/Rentals 100,000 square feet Commercial 3. Estimated Interest Earnings TOTAL ESTIMATED FUNDS: $920,000. C. PROJECTED EXPENSES 1. General Manager $ 15,000. $ 6,625. 2. Engineering Geologist and Assistant Geologist 58,000. 29,318 3. Support services (e.g. office space, office equipment, office staff vehicles) 0 0 4. a) Repair, maintenance and improvements (as per approved Repair, Maintenance and Improvement Program) 159,000. 74,536. b) Construction Administration 27,000. 17,146. 5. Legal, accounting and insurance 5,000. 0 6. Professional Soils & Geotechnical Consulting 12,000. 12,591. 7. Professional Civil Engineering and Environmental Consulting 4,000. 15,154 8. County staff services 10,000. 0 9. Assessment documents preparation 10,000. 7,250. TOTAL EXPENSES: $300,000. $162,620. 9. Reserve $620,000. TOTAL BUDGET: $920,000. * Included in items 1, 2, and 4(b). W:\DATA\WP51 WANCY\CANYONMBUDGET.94