Loading...
HomeMy WebLinkAboutMINUTES - 03211995 - 1.12 ,/1 112- TO: 2TO: BOARD OF SUPERVISORS, AS THE GOVERNING BODY OF THE CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT FROM: J. MICHAEL WALFORD, CHIEF ENGINEER DATE: March 21, 1995 SUBJECT: Approve Plans and Specifications and Advertise for bids for the Lindsey Detention Basin interim Excavation Project. Project No. 7566-6D8465-94, CDD-CP # 95 -2. Specific Request(s) or Recommendation(s) & Background & Justification 1. RECOMMENDED ACTION: APPROVE the Plans and Specifications for the Project and ADVERTISE for bids to be received on Thursday, April 20, 1995, at 2:00 p.m. DIRECT the Clerk of the Board to publish the Notice to Contractors in accordance with Section 21191 of the Public Contract Code. II. FINANCIAL IMPACT: The estimated contract cost of the project is $700,000, funded by Drainage Area 56 Funds (100%). III. REASONS FOR RECOMMENDATION/BACKGROUND: The interim project is needed to provide added storage capacity to control and contain flood waters and reduce the risk of flooding to the surrounding area. The ultimate basin will be constructed in a future project. Continued on Attachment: X SIGNATURE• t _RECOMMENDATION OF COUNTY ADMINISTRATOR _RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON March 21, 1995 APPROVED AS RECOMMENDED OTHER_ VOTE OF SUPERVISORS •UNANIMOUS (ABSENT AYES: NOES: ABSENT: ABSTAIN: KE:jlg c\BO:bol4.t3 Orig.Div: Public Works(Design Division) I hereby certify that this is a true and correct copy of Contact: Kevin Emigh an action taken and entered on the minutes of the cc: County Administrator Board of Supenleore on the data shown. Attn: E.Kuevor March 21 1995 Auditor-Controller �• ATTESTED: � PW Accounting PHIL BATCHELOR,Clerk of the Board Construction of Supervisors and County Administrator Community Development (r 11 • `� J Ely ,Deputy Apprave Plans and Specifications and Advertise for bids for the Lindsey Detention Basin Interim Excavation Project. March 21, 1995 Page 2 The Chief Engineer has filed with the Board of Supervisors the Plans and Specifications for the project. The general prevailing rates of wages, which shall be the minimum rates paid on this project, have been filed with the Clerk of the Board and copies will be made available to any interested party upon request. The Board reviewed and approved the project on January 31, 1995 and found, that minor technical changes or additions to the project as descirbed in the addendum to the Negative Declaration are necessary and that there is no substantial evidence that the project will have a significant effect on the environment and approved the Addendum to the Negative Declaration in compliance with the California Environmental Quality Act. IV. CONSEQUENCES OF NEGATIVE ACTION: If the project is not approved for advertising, it will not be constructed .