HomeMy WebLinkAboutMINUTES - 03141995 - 1.2 THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
Adopted this Order on March 14, 1995, by the following vote:
AYES: Supervisors Rogers, Smith, DeSaulnier, Torlakson, Bishop
NOES: None
ABSENT: None
ABSTAIN:None
SUBJECT: Award of Contract for E1 Portal Drive/
Fordham Street Signal Modification
Project, San Pablo area
Project No. 0662-6U4168-92
Bidder Total Amount Bond Amounts
Richard A. Heaps Elect. Contractor, Inc. $49,888. 00 Payment:
8909 Florin Road $24,944. 00
Sacramento, CA 95829 Performance:
$49,888. 00
St. Francis Electric
Hayward, CA
The above-captioned project and the plans and specifications
therefor having been previously approved, and bids having been duly
invited and received by the Director of Public Works on February 23,
1995; and
The Contract Compliance Officer having determined that the lowest
monetary bidder, Steiny and Company, Inc. ("Steiny") , has failed to
meet the WBE goal for this project (i.e. , 6%) and has failed to
document an adequate good faith effort to comply with said goal and the
requirements of the County's Minority and Women Business Enterprise
Program, as required by the project specifications, and the Contract
Compliance Officer recommending rejection of said bid; and
Steiny having been notified in writing of the Contract Compliance
Officer's determination and having failed to appeal it, as required by
the project specifications; and
The bidder listed first above, Richard A. Heaps Electrical
Contractor, Inc. ("Heaps") , having submitted the lowest responsive and
responsible bid, which is $4, 101.00 less than the next lowest bid; and
The Contract Compliance Officer having determined that Heaps has
attained MBE participation of 18.3% and WBE participation of 6. 1%,
which exceeds the MBE and WBE goals for this project and complies fully
with the requirements of the County's Minority and Women Business
Enterprise Program; and
The Director of Public Works recommending that the bid submitted
by Heaps is the lowest responsive and responsible bid, and this Board
concurring and so finding;
NOW, THEREFORE, the Board finds, determines and orders as follows:
The Board DETERMINES that the lowest monetary bidder, Steiny, has,
failed to meet the WBE goal for this project, has failed to document an
adequate good faith effort to comply with said goal and has failed to
appeal the Contract Compliance Officer's determination, as required by
the project specifications, and the Board DETERMINES that said bid is
non-responsive and REJECTS said bid on that basis; and
AWARD OF CONTRACT FOR EL PORTAL DRIVE/ March 14, 1995
FORDHAM STREET SIGNAL MODIFICATION
PROJECT, SAN PABLO AREA
The Board FURTHER DETERMINES that Heaps, as the lowest responsive
and responsible bidder, has met or exceeded the MBE and WBE goals for
this project (i.e. , 14% and 6% respectively) and has otherwise complied
with the project specifications and the requirements of the County's
Minority and Women Business Enterprise Program; and
The Board ORDERS that the contract for the furnishing of labor and
materials for said work is awarded to Heaps at the listed amount and at
the unit prices submitted in said bid, and that said contractor shall
present two good and sufficient surety bonds as indicated above, and
that the Director of Public Works shall prepare the contract therefor;
and
The Board FURTHER ORDERS that after the contractor has signed the
contract and returned it, together with the bonds as noted above and
any required certificates of insurance or other required documents, and
the Director of Public Works has reviewed and found them to be
sufficient, the Director of Public Works is authorized to sign the
contract for this Board; and
The Board FURTHER ORDERS that in accordance with the project
specifications and/or upon signature of the contract by the Director of
Public Works, any bid bonds posted by the bidders are to be exonerated
and any checks or cash submitted for security shall be returned; and
The Board FURTHER ORDERS that the Director of Public Works is
authorized to sign any escrow agreements prepared for this project to
permit the substitution of securities for moneys withheld by the County
to ensure performance under the contact, pursuant to Section _22300 of
the Public Contract Code; and
Pursuant to Public Contract Code Section 4114, the Board DELEGATES
its functions under Public Contract Code Sections 4107 and 4110 to the
Director of Public Works or his designee; and
Pursuant to Labor Code Section 6705, the Board FURTHER DELEGATES
to the Director of Public Works or to any registered civil or
structural engineer employed by the County and designated by him the
authority to accept detailed plans showing the design of shoring,
bracing, sloping or other provisions to be made for worker protection
during trench excavating covered by that section; and
The Board DECLARES that, should the award of the contract to Heaps
be invalidated for any reason, the Board would not in any event have
awarded the contract to any other bidder, but instead would have
exercised its discretion to reject all of the bids received. Nothing
herein shall prevent the Board from reawarding the contract to another
bidder in cases where the successful bidder establishes a mistake,
refuses to sign the contract or fails to furnish required bonds or
insurance (see Public Contract Code Sections 5100-5107) .
1 hereby certify that this is a true and correct copy of
an action taken and entered on the minutes of the
Board of Supervisors on the date shown.
Orig. Dept: PW-Const. ATTESTMAR 14 1g9-q
cc: County Administrator PH•IL BATCHELOR,Clerk of the Board
County Counsel of Supervisors and County Administrator
Auditor-Controller
Public Works-Design ey ,Deputy
Accounting
R. Bruno
Richard A. Heaps Elect. Contr. , Inc. (Via Const. Div. )
Steiny & Co. , Inc. (Via Const. Div. )
Surety (Via Const. Div. )
-2-
CONTRACT AWARD
Board meeting date Agenda item # �
The Board Order indicating what contractors bid on this project, the dollar amounts bid,
and the successful low bidder, will be presented at the Board meeting.
Project name: EI Portal Dr. - Fordham St. Signal Modification
:djh
cont-awd.cao