Loading...
HomeMy WebLinkAboutMINUTES - 07121994 - 1.108 1 � .iC TO: BOARD OF SUPERVISORS Contra - FROM: PHIL BATCHELOR, COUNTY ADMINISTRATOR Costa` , oi. is County DATE: JUNE 28, 1994 s;A_cou" SUBJECT: APPROVING THE LIST OF GENERAL CONTRACTORS SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. RECOMMENDATION APPROVE Change Order No. 7 to the Contract dated October 5, 1993 , for Site Preparation Demolition, Relocation and Modification of Existing Structures and Features, and the Widening of Street No. 4 at Merrithew Memorial Hospital, 2500 Alhambra Avenue, Martinez, and AUTHORIZE the County Administrator, or his . designee, to execute the Change Order, which provides for the special treatment and disposition of construction debris :from H and L Wards, not included iri the original contract for the replacement County : Hospital project._ II. FINANCIAL IMPACT Funds in the' capital account established for the project are sufficient to cover the amount encumbered by this contract, from bond proceeds specified to the project. III. BACKGROUND . During the development of the Construction Documents and prior to bidding of this phase of . 'the Project the Construction Manager contacted an Industrial Hygienist regarding the handling and disposition of construction debris suspected of containing lead (Pb) based paint. The Construction Manager was advised at that time that there were no standards regarding the disposition of construction debris with lead based paint. CONTINUED ON ATTACHMENT: YES SIGNATURE: RECOMMENDATION OF COUNTY'ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON JUL I Z 19N APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS '/ I HEREBY CERTIFY THAT THIS IS A TRUE UNANIMOUS(ABSENT ) AND CORRECT COPY OF AN ACTION TAKEN AYES: NOES: AND ENTERED ON THE MINUTES OF THE BOARD ABSENT: ABSTAIN: OF SUPERVISORS ON THE DATE SHOWN. Contact: D* Bell, CAO ATTESTED P JUL 21994 HIL BATCHELOR,CLERK OF THE BOARD OF CC: AUd1tOr-COntrOl ler , GSD (Accounting) SUPERVISORS AND COUNTY ADMINISTRATOR Health Services Department F. Puglisi X Consultant (Via CAO) BY '`���'�� ""` =� 'DEPUTY Page 1 of 2 Board Order to Approve June 20, 1994 List of General Contractors On October 5, 1993 , the County awarded the contract to the lowest responsive and responsible bidder, Joe Carone, Inc . In preparation for the demolition of H and L Wards the Construction Manager was advised that there were new requirements for removal of construction debris containing lead based paint. The County contracted with an Industrial Hygienist to select paint samples and submit the samples to a laboratory for analysis . The results indicated that the paint contained lead in excess of the allowable amount for disposal at a conventional site and would require transportation to a site certified for the handling of this manner of construction debris . Four (4) methods of handling, removal, and disposition were developed and priced. The estimates ranged from a high of $803 , 355 to a low of $194, 554 . The estimates have been evaluated by the Construction Manager. The current construction contract amount is $1, 319, 009 . 46 . The new guaranteed maximum cost will be $1, 513 , 563 . 83 , an increase of $194, 554 .37 . Page 2 of 2