Loading...
HomeMy WebLinkAboutMINUTES - 06071994 - 1.12 I., TO: BOARD OF SUPERVISORS, AS THE GOVERNING BODY OF THE CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT FROM: J. MICHAEL WALFORD, CHIEF ENGINEER DATE: June 7, 1994 SUBJECT: Approve Plans and Specifications and Advertise for bids for the Drainage Area 76- Miranda Creek Improvement Project. Project No. 7505-6F8535-93, CDD-CP #-93 Specific Request(s) or Recommendation(s) & Background & Justification 1. RECOMMENDED ACTION: APPROVE the Plans and Specifications for the Project and ADVERTISE for bids to be received on Tuesday, July 5, 1994 at 2:00 p.m. DIRECT the Clerk of the Board to publish the Notice to Contractors in accordance with Section 21191 of the Public Contract Code, and II. FINANCIAL IMPACT: The estimated contract cost of the project is $344,000 funded by Drainage Area 76 (100%). III. REASONS FOR RECOMMENDATION/BACKGROUND: The project is needed to divert storm water from an existing drainage system outfall on Miranda Creek. This water will be carried downstream and discharged at a point where the creek has greater capacity. The Chief Engineer has filed with the Board of Supervisors the Plans and Specifications for the project. Continued on Attachment: x SIGNATURE: zz- _ RECOMMENDATION OF COUNTY ADMINISTRATOR _ RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON JUN 7 - 1994 APPROVED AS RECOMMENDED V OTHER OF SUPERVISORS VUNANIMOUS (ABSENT t ) AYES: NOES: ABSENT: ABSTAIN: EH:jlg c\B 0:7.t6 1 hereby certify that this is a true and correct copyof an action taken and entered on the minutes of the Orig. Div: Public Works (Design Division) Board ofI on the date shown. Contact: Eric When,313-2242 ATTESTED: 7 — 100E PHIL BATCHELOR, cc: County Administrator Of SupBnFSOr8 afW C f the Board Attn: E. Kuevor ty Administrator Auditor-Controller PW Accounting By _Deputy Construction Community Development Drainage Area 76 - Miranda Creek June 7, 1994 Two The general prevailing rates of wages, which shall be the minimum rates paid on this project, have been filed with the Clerk of the Board and copies will be made available to any interested party upon request. The Board reviewed and approved the project on March 1, 1994 and found, on the basis of the initial study and all comments received, that there is no substantial evidence that the'project will have a significant effect on the environment and adopted the Negative Declaration in compliance with the California Environmental Quality Act. A Notice of Determination was filed with the County Clerk on March 3, 1994. IV. CONSEQUENCES OF NEGATIVE ACTION: If the project is not approved for advertising, it will not be constructed.