Loading...
HomeMy WebLinkAboutMINUTES - 06281994 - 1.6 TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: June 28, 1994 SUBJECT: Approval of Contract Change Order No. 3 for the Avon Bridge Rehabilitation Project, _ Project No. 0662-6R4089-90 Specific Request(s)or R000mmendation(sy&Background&Justification I. Recommended Action: APPROVE Contract Change Order No. 3 in the approximated amount of $14,500 and AUTHORIZE the Public Works Director to execute it to compensate the contractor, Valentine Corporation, for work specified as a result of changes in design and field conditions. II. Financial Impact: The project contingency funds are sufficient to cover the change order costs. The source of funds is Federal Funds (81%), Matching State Funds (1%), and Road Funds (18%). Ill. Reasons for Recommendations and Background: This change order provides for the following changes: a. Replace facility bridge opening mechanism b. Seal bridge deck to protect light weight aggregate C. Added pavement markers on bridge deck to meet CALTRANS standards d. Remove wing wall as needed to constuct the new barrier railing The cumalative total of Contract Change Order Nos. 1 through 3 exceeds $25,000.00, requiring Board approval. IV. Consequences:of Negative Action: ,.. The lack of approval would preclude payment for work deemed necessary and requested by the Chief Engineer and performed in good faith by the contractor. Continued on attachment: _yes SIGNATURE: Gf � RECOMMEND [ RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON: .11 N 2 $ 1994 APPROVED AS RECOMMENDED OTHER VOPOF SUPERVISORS V UNANIMOUS (ABSENT AYES: NOES: ABSENT: ABSTAIN: Contact: Joseph P. Murphy, (510) 313-2321 Orig. Div.: PW(Constr) cc: County Administrator Ihereby Certify thatthisisatrueandcorrecteop of Auditor-Controller an action taken and entered on the minutes of the Public Works Board of Supery tt� oam. - Design ATTESTED. �S - Accounting, R. Gilchrist PHIL BATCHELOR,Clerk of the Board R. Bruno of Supervisors and County Administrator Contractor /f r By ,Deputy DG\tt c:BO\ABR-28.t6