HomeMy WebLinkAboutMINUTES - 06141994 - 1.22 TO: BOARD OF SUPERVISORS, AS THE GOVERNING BOARD OF CONTRA COSTA
COUNTY AND CONTRA COSTA COUNTY FLOOD CONTROL AND WATER
CONSERVATION DISTRICT
FROM: J. MICHAEL WALFORD, CHIEF ENGINEER
DATE: JUNE 14, 1994
SUBJECT: APPROVE PLANS AND SPECIFICATIONS AND ADVERTISE FOR BIDS FOR THE 1993 WALNUT
CREEK DESILTING PROJECT.
PROJECT No. 7520-669316-94, CP # 92 - 21.
Specific Request(s) or Recommendation(s) & Background & Justification
I. RECOMMENDED ACTION:
APPROVE the Plans and Specifications for the project;
ADVERTISE for bids to be received on Tuesday, July 12, 1994, at 2:00 p.m.; and
DIRECT the Clerk of the Board to publish the Notice to Contractors in accordance with Section
21191 of the Public Contract Code, and
II. FINANCIAL IMPACT:
The estimated contract cost of the project is $184,000, funded by Zone 3B Flood Control funds
(100%).
III. REASONS FOR RECOMMENDATION/BACKGROUND:
The project is needed to remove accumulated sediment and restore the bottom elevations of the
Walnut Creek Channel, which will reestablish the volume and flow capacities of the channel
within the project limits.
The Chief Engineer has filed with the Board of Supervisors the Plans and Specifications for the
project.
r
06
Continued on Attachment: x SIGNATURE:
i
RECOMMENDATION OF COUNTY ADMINISTRATOR
RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
I
ACTION OF BOARD ON JUN 14 APPROVED AS RECOMMENDED OTHER _
VOTE OF SUPERVISORS IhereWceRiythat this tsatrueand=0001010
o
an action talo and entered on the
✓ UNANIMOUS (ABSENT 1 ) Board of 8upeMsors the date shown.
AYES: NOES: o Supentsors and County Adm ntistraW
ABSENT: ABSTAIN:
Byii a ,4 4 .De"
.PH/HF:pe
g:\fld ctl\fc bo\BO14.t6
Orig. Div: Public Works(FCE)
Contact: P. Harrington,313-2271
cc: Accounting
Construction
Auditor-Controller
Community Development
County Administrator
Attn: E. Kuevor
2;2-
1993
iZ1993 WALNUT CREEK DESILTING
JUNE 14, 1994
Page Two
III. REASONS FOR RECOMMENDATION/BACKGROUND: (Continued)
The general prevailing rates of wages, which shall be the minimum rates paid on this project,
have been filed with the Clerk of the Board and copies will be made available to any interested
party upon request.
The Board reviewed and approved the project on May 5, 1992, and determined the project to
be exempt from the California Environmental Quality Act as a Class 4G Categorical Exemption.
A Notice of Exemption was filed with the County Clerk on May 6, 1992.
IV. CONSEQUENCES OF NEGATIVE ACTION:
If the project is not approved for advertising, the channel's volume and flow capacities will not
be reestablished.