HomeMy WebLinkAboutMINUTES - 05031994 - 1.3 TO: BOARD OF SUPERVISORS
F
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: May 3, 1994
SUBJECT: Approve Plans and Specifications and Advertise for bids for the Highway 4/1-aurel Road
Traffic Signal Project.
Project No. 4660-6X4011-93, CDD-CP # 93 - 31.
Specific Request(s) or Recommendations) & Background & Justification
I. RECOMMENDED ACTION:
APPROVE the Plans and Specifications for the Project and
ADVERTISE for bids to be received on Tuesday, May 31, 1994, at 2:00 p.m.
DIRECT the Clerk of the Board to publish the Notice to Contractors in accordance with Section
20392 of the Public Contract Code.
II. FINANCIAL IMPACT:
The estimated contract cost of the project is $143,000 funded by Developer (22%), State (39%),
Oakley/North Brentwood AOB (39%).
III. REASONS FOR RECOMMENDATION/BACKGROUND:
The project is needed to facilitate the traffic movement through the intersection by constructing
a traffic signal.
The Public Works Director has filed with the Board of Supervisors the Plans and Specifications
for the project.
Continued on Attachment: SIGNATURE:
_ RECOMMENDATION OF COUNTY ADMINISTRATOR
_ RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON MAY 3 1994 APPROVED AS RECOMMENDED OTHER
VOTE F SUPERVISORS
UNANIMOUS (ABSENT )
AYES: NOES:
ABSENT: ABSTAIN:
KF'1lg I hereby cortify that this Is a true and oonect copyof
c\BO:12.t4 an action taken and entered on the minutes of the
Board of su �pIs on4ft a shown.
Orig. Div: Public Works (Design Division) ATTESTED! ,& q1994
Contact: Kathleen Fudge (510) 313-2249 of Supervisors a1ATCHEnd County Adminirk strator
—
cc: County Administrator
Attn: E. Kuevor
Auditor-Controller By A� a A 'Deputy
PW Accounting
Construction
Community Development
Hwy 4/Laurel Road Signal
May 3, 1994
Page 2
The general prevailing rates of wages, which shall be the minimum rates paid on this project
have been filed with the Clerk of the Board and copies will be made available to any interested
party upon request.
The Board reviewed and approved the project on September 28, 1993 and determined the
project to be exempt from the California Environmental Quality Act as a Class 1 C Categorical
Exemption. A Notice of Exemption was filed with the County Clerk on September 29,. 1993.
IV, CONSEQUENCES OF NEGATIVE ACTION:
If the project is not approved for advertising, it will not be constructed.