HomeMy WebLinkAboutMINUTES - 04261994 - 1.9 TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: April 26, 1994
SUBJECT: Cooperative Funding Agreement - Empire Avenue Bridge
Project No.: 0662-6R4017-93 - CP#92-69
SPECIFIC REQUEST(S) OR RECOMMENDATIONS) &BACKGROUND AND JUSTIFICATION
I. Recommended Action:
APPROVE and AUTHORIZE the Chair of the Board of Supervisors to execute the Cooperative
Funding Agreement between the County and the East Bay Regional Park District (EBRPD), for
the construction of sidewalks on the Empire Avenue Bridge in the Oakley area.
ll. Financial Impact:
There is no financial impact to the County General Fund. EBRPD will provide $18,000 from
Measure AA to the County to construct extra-wide sidewalks on this bridge.
III. Reasons for Recommendations and Background:
EBRPD has requested that the Empire Avenue Bridge be built with wider sidewalks than
originally proposed and have agreed to pay the incremental cost difference. The extra wide
sidewalks are needed to allow the trail users on the Delta DeAnza Trail, to use the crosswalk at
Laurel Road instead of crossing Empire Avenue at mid-block. It is about 100 feet from where
the Delta DeAnza Trail meets Empire Avenue to the Laurel Road crosswalk.
The Delta DeAnza Trail is an important regional transportation link connecting central Contra
Costa County to eastern Contra Costa County. When complete the trail will encompass 21 miles
and extend from Concord through Bay Point, Pittsburg, Antioch and terrpiate in Oakley. The
trail will also connect to the Marsh Creek Trail which will provide a coin ion to the City of
Brentwood.
Continued on Attachment: X SIGNATURE:
_ RECOMMENDATION OF COUNTY ADMINISTRATOR
_ RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON .1� /,f?y APPROVED AS RECOMMENDED OTHER
VOTE OF SUPERVISORS
_ UNANIMOUS (ABSENT )
AYES: NOES:
ABSENT: J ABSTAIN:
I Nareby cortify that this i9 a true and he correct copy of
AS:eh
BAoa of Si kenv nd Aon he date sshom. the
c:B026.t4 " �'' 9
A SATC LOR Oe of the hoard
at supervisors and aounty Administrator
Orig. Div: Public Works (T/E)
Contact: Al Schaal, Tel. 313-2234 By oevua
cc: See Page 2
Cooperative Funding Agreement - Empire Avenue Bridge !1'
April 26, 1994
Page 2
III. Reasons for Recommendations and Background: (Cont.)
The Cooperative Funding Agreement allows the County to collect Measure AA funds from
EBRPD in the amount of $18,000, and designates the County to be the responsible agency for
the expenditure of these funds to construct the bridge. The County will maintain the bridge once
completed and EBRPD will maintain and patrol the Delta DeAnza trail.
IV. Consequences of Negative Action:
Failure to execute the Empire Avenue Bridge Cooperative Funding Agreement between the
EBRPD and the County for the $18,000 funding, may delay the construction of the bridge.
cc: D. Eckerson, Design
R. Gilchrist, Accounting
S. Williams, EBRPD
COOPERATIVE FUNDING AGREEMENT FOR IMPROVEMENTS TO THE
EMPIRE BRIDGE FOR THE DELTA DE ANZA TRAIL, OAKLEY
This Coope ative Funding Agreement made and entered the
day of , 199,71,P" by and between the East Bay
Regional Park District, hereinafter referred to as "EBRPD" and
Contra Costa County, hereinafter referred to as "County" .
WITNESSETH
WHEREAS, County will replace the roadway bridge at Empire
Avenue in Oakley at the Contra Costa Canal and provide two nine-
foot sidewalks to accommodate regional trail users; and
WHEREAS, the Empire Avenue roadway bridge will intersect
with the Delta De Anza Trail, a regional trail being developed by
EBRPD; and
WHEREAS, EBRPD has a License Agreement with Contra Costa
Water District to operate and maintain the completed trail at
EBRPD's expense; and
WHEREAS, the project which is the subject of this Agreement
(hereinafter referred to as "Project") will be constructed to
eliminate a mid-block trail crossing on Empire Avenue.
WHEREAS County and EBRPD do mutually desire to cooperate in
completing the Project and to specify herein the terms and
conditions under which said Project will be designed,
constructed, financed and maintained.
NOW, THEREFORE, it is mutually agreed as follows:
SECTION I
EBRPD AGREES:
(1) To provide funds estimated by County in the amount of
$18,000 from Measure AA funds allocated by the EBRPD Board of
Directors for construction of the Delta De Anza Trail to
compensate the County for the additional costs related to the
widening of the bridge sidewalks.
(2) To deposit the full amount of the money to which it
will become obligated, in trust, with County.
(3) To review plans and specifications for the project
before the County goes to bid.
SECTION II
COUNTY AGREES:
1
(1) To provide EBRPD with a set of plans and specifications
before going to bid in which the sidewalk widening is identified
as an add alternate with a specific price.
(2) To provide management for the Project.
(3) To require the Construction Contractor to maintain in
force, until completion and acceptance of the Project
construction contract, a policy of Contractual Liability
Insurance, including coverage of Bodily Injury Liability and
Property Damage Liability in accordance with Standard County
requirements. Such policy shall contain an additional insured
endorsement naming the EBRPD and the officers, agents and
employees as additional insured. Coverage shall be evidenced by
a Certificate of Insurance in a form satisfactory to EBRPD which
shall be delivered to EBRPD before the start of construction.
(4) To maintain, in trust, funds deposited by EBRPD and
issue payment from these funds as required under approved
progress payments.
(5) To provide EBRPD with a copies of contracts, invoices
and canceled checks.
(6) To submit to EBRPD, upon request, an accounting of
trust funds and to retain, or cause to be retained for audit all
records and accounts relating to the Project.
(7) To operate and maintain the Project when complete.
SECTION III
IT IS MUTUALLY AGREED AS FOLLOWS:
(1) This Agreement may be amended or canceled by mutual
consent in writing of the two parties.
(2) Notices regarding this agreement shall be sent by first
class mail, postage prepaid, to EBRPD at P. O. Box 5381, Oakland,
CA 94605-0381 and to County at 255 Glacier Drive, Martinez, CA
94553-4897.
( 3) EBRPD shall defend, indemnify, save, and hold harmless
County and its officers and employees from any and all claims,
costs, and liability for any damages, sickness, death, or injury
to person(s) or property, including without limitation all
consequential damages from any cause whatsoever, arising directly
or indirectly from or connected with the negligent operations or
services of EBRPD or its officers, employees, agents, or
subcontractors hereunder. EBRPD shall reimburse County for any
expenditures, including reasonable attorney's fees, County may by
reason of the matters that are the subject of this
2
X
indemnification and, if requested by County, shall defend any
claims or litigation to which this indemnification applies at the
sole cost and expense of EBRPD.
(4) County shall defend, indemnify, save, and hold harmless
EBRPD and its officers and employees from any and all claims,
costs, and liability for any damages, sickness, death, or injury
to persons(s) or property, including without limitation all
consequential damages from any cause whatsoever, arising directly
or indirectly from or connected with the negligent operations or
services of County or its officers, employees, agents, or
subcontractors hereunder. County shall reimburse EBRPD for any
expenditures, including reasonable attorney's fees, EBRPD may by
reason of the matters that are the subject of this
indemnification and, if requested by EBRPD, shall defend any
claims or litigation to which this indemnification applies at the
sole cost and expense of County.
(5) Entire Agreement. This Agreement contains the entire
agreement between the parties with regard to matters described in
this Agreement and supersedes all prior agreements, whether
written or oral, between the parties with respect to such subject
matter.
(6) This Agreement shall be interpreted and enforced under
the laws of the State of California.
IN WITNESS WHEREOF, the parties hereto have caused this
Agreement to be executed by their respective officers, duly
authorized, the provisions of which Agreement are effective as of
the day, h, and year first hereinabove written.
[CONTRA OSTA COU EAST REGTONAL PARK DISTRICT
By By . A UL
Ch irperson Ge era Manage
Board of Supervisors
Attested: Phil Batchelor
Administrator and Clerk of the
Board
By
Approved as to form: Approved as to form:
Victor J. Westman Ted Radosevich
Coun� Counsel j� Distri t Counsel
By � S.
/ By
8/24/93 SE�) TJ
3
PRELIMINARY COST ESTIMATE
Project Name: Empire Avenue Bridge Replacement
Project No.: 0662-6114017-91
Description: EBRPD Share of Work for Trail Crossing of CCWD Canal
ITEM OF WORK UNIT QUANTITY UNIT PRICE TOTAL
1. Furnish Precast, Prestressed SF 377 $25.00 $9,425.00
Concrete Slab
2. Erect Precast, Prestressed EA 2 1,000.00 2,000.00
Concrete Slab
3. Structural Concrete CY 7.7 300.00 2,310.00
(Abutments)
4. Cast-in-drilled-hole Concrete LF 60 35.00 2,100.00
Piers
5. Concrete Barrier (Type 26*) LF 19% of 100 105.00 1,995.00
6. Minor Concrete (Sidewalk) SF —7325 2.75 894.00
Total Construction Cost "$18,724.00
(Rounded) $18,750.00
*Concrete Barrier (Type 26) work item includes sidewalk on bridge. EBRPD's share of this work item
is 19% based on area of 4-foot wide sidewalk.
DHE:jlg
c: Prelims.*