HomeMy WebLinkAboutMINUTES - 04261994 - 1.6 TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: April 26, 1994
SUBJECT: Approve Plans and Specifications and Advertise for bids for the Willow Pass Road
Frontage Improvements Project.
Project No. 0662-6114211-92, CP # 93-45.
Specific Request(s) or Recommendations) & Background & Justification
I. RECOMMENDED ACTION:
APPROVE the Plans and Specifications for the Project and
ADVERTISE for bids to be received on Tuesday, May 24, 1994, at 2:00 p.m.
DIRECT the Clerk of the Board to publish the Notice to Contractors in accordance with Section
20392 of the Public Contract Code.
II. FINANCIAL IMPACT:
The estimated contract cost of the project is $460,000, funded by the County Redevelopment
Agency (75%), General Road Funds (9%) and State Local Partnership Program (SB 300) Funds
(16%).
s
111. REASONS FOR RECOMMENDATION/BACKGROUND:
The project will provide frontage improvements on Willow Pass Road. The improvements will
include curb, gutter, sidewalk, bicycle lanes, on-street parking, an improved storm drain system
and an AC surface treatment.
The Public Works Director has filed with the Board of Supervisors the Plans and Specifications
for the project.
Continued on Attachment: X SIGNATURE:
RECOMMENDATION OF COUNTY ADMINISTRATOR
RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON G� APPROVED AS RECOMMENDED OTHER
VOTE OF SUPERVISORS
X UNANIMOUS (ABSENT )
AYES: NOES:
ABSENT: ABSTAIN:
NL:jlg
c\BO:bo12.t4
1 hereby certify that this is a true and correct copy of
Orig.Div: Public Works(Design Division) an action taken and entered on the minutes of the
Contact: Neil Leary (313-2363) Board of Supervl rs on he date sh
Administrator ATTESTED. � / 194
cc: County PHIL BAT C ELOR,Clert of the Board
Attn: E. Kuevor
of supervisors and County Administrator
Auditor-Controller
PW AccountingBY � Deputy
Construction
Community Development
Approve Plans and Specifications and Advertise for bids for the Willow Pass Road Frontage
Improvements Project
April 26, 1994
Page 2
The general prevailing rates of wages, which shall be the minimum rates paid on this project,
have been filed with the Clerk of the Board and copies will be made available to any interested
party upon request.
The Board reviewed and approved the project on September 21, 1993 and found, on the basis
of the initial study and all comments received, that there is no substantial evidence that the
project will have a significant effect on the environment and adopted the Negative Declaration
in compliance with the California Environmental Quality Act. A Notice of Determination was filed
with the County Clerk on September 24, 1993.
IV. CONSEQUENCES OF NEGATIVE ACTION:
If the project is not approved for advertising, it will not be constructed.