HomeMy WebLinkAboutMINUTES - 04261994 - 1.189 Contra
TO: REDEVELOPMENT AGENCY • �, Costa
FROM: Phil Batchelor sem' County
Executive Director
DATE : April 29, 1994
SUBJECT: North Richmond Flood Control Financing
SPECIFIC REQUEST(S) OR RECOMMENDATIONS (S) & BACKGROUND AND JUSTIFICATION
RECOMMENDATIONS
COMMIT future North Richmond Redevelopment revenues to cover $400, 000 of
the capital costs necessary to complete the Wildcat - San Pablo Creek Flood
Control Project, subject to terms; and
AUTHORIZE the Chair, Vice-Chair, Executive Director or Deputy Director to
execute an Agreement with the Contra Costa County Flood Control District.
FISCAL IMPACT
No General Funds are involved. The commitment of Agency revenues will
permit the Flood Control District to meet a local match requirement
necessary to secure approximately $6 million in federal Corps of Engineers
funding to complete the San Pablo - Wildcat Creek Flood Control project.
BACKGROUND/REASONS FOR RECOMMENDATIONS
Background is provided in Exhibit A. The recommendation to commit
Redevelopment Agency funds has been approved by the North Richmond
Municipal Advisory Council . The above recommendations include the terms
and conditions stipulated in Section V, p. 3 of Exhibit A hereto.
CONTINUED ON ATTACHMENT: XX YES SIGNATURE :
RECOMMENDATION OF EXECUTIVE DIRECTOR RECOM EION OF GENCY CO ITTEE
APPROVE OTHER
7
SIGNATURE (S) :
ACTION OF AGENCY ON April 26 , 1994._ APPROVED AS RECOMMENDED x OTHER
VOTE OF COMMISSIONERS
I HEREBY CERTIFY THAT THIS IS A
x UNANIMOUS (ABSENT ) TRUE AND CORRECT COPY OF AN
AYES: NOES: ACTION TAKEN AND ENTERED ON THE
ABSENT: ABSTAIN: MINUTES OF THE REDEVELOPMENT
AGENCY ON THE DATE SHOWN.
Contact: Jim Kennedy
646-4076 ATTESTED April 26 , 1994
orig: Redevelopment PHIL BATCHELOR,
cc: Public Works AGENCY SECRETARY
Community Development
County Administrator
County Counsel BY , DEPUTY
JK:1h
sral3/nrflood.bos
Exhibit A
Page 1 of 11
CONTRA COSTA COUNTY REDEVELOPMENT AGENCY
DATE: March 17, 1994
TO: North Richmond Municipal Advisory Council
FROM: Jim Ke ed
Depu Direct - e evelopment
SUBJECT: Re uest of tra Costa County Flood Control & Water Conservation District for
Re evelo nt Agency Participation in Financing Wildcat- San Pablo Creek Corps
of E neers Project
I. Background
The County's Flood Control & Water Conservation District ("Flood Control") has requested
that the Redevelopment Agency finance $400,000 of an approximate $800,000 local share
requirement necessary to complete the Wildcat - San Pablo Creek Corps of Engineers
Project (Attachment A). The remaining $400,000 of the local share requirement for
completion of the project will be covered by the Flood Control District by reducing districtwide
planning costs.
II. Considerations
A number of policy and pragmatic considerations should be kept in mind when-evaluating the
proposal for funding the Wildcat- San Pablo Creek Flood Control Project (the "Project"):
1. Failure to complete the Project will result in a considerable portion of the North
Richmond area remaining in the federal flood hazard area, therefore development
costs and flood insurance costs will be adversely affected;
2. Failure to provide the local match would result in a loss of approximately$5 million
in federal funding for the Project;
3. The Agency does not have sufficient funds today to provide the requested funds,
however, the Flood Control District has indicated it can cavy the Agency on terms for
up to six years; and
4. Redevelopment funding for the Project will result in opportunity costs to the North
Richmond community, i.e., the Agency will have to forego funding other
projects/programs to fulfill an obligation to fund the Project.
- Exhibit A
Page 2 Of 11
North Richmond Advisory Committee -2- March 17, 1994
III. Analysis
A. Normative Financial Projections
The Agency has limited financial resources (present and projected). Attachment B
reflects a projection of tax increment revenue through the fiscal year 2000-2001,
completed in 1992 when the Agency issued its Tax Allocation Bonds. .Note the
assumptions regarding development expectation. Further note that the cost of
administering the Agency functions must be borne entirely by tax increment
revenues, and that the projects do not provide for any diversion of revenue to the
State.
B. Optimistic Financial Projections
If one assumes two additional major projects come on line prior to the end of the
decade (the Erickson facility and Parkway Estates), the Financial Projects are more
optimistic (Attachment C).
C. Current Commitments
The Agency has entered into an Agreement with the County to design/construct the
Brookside realignment. This $1.3 million (est.) project is to be funded with bond
proceeds (present amount $680,000) and future tax increments or future bond
proceeds (estimated $620,000).
The North Richmond MAC previously endorsed, and the Agency committed to, the
Agency participating in the North Richmond Area of Benefit (AOB) Program by
funding up to $675,000 in circulation improvements (Attachment D).
The North Richmond MAC has previously expressed a desire to fund employment
training/job linkage programs such as OPEN. Agency funds have been programmed
in the past, and could be programmed more significantly in the future (up to $200,000
annually over 15 years as recommended by the North Richmond Revitalization
Strategy, August 1991).
Administration currently utilizes approximately $110,000 annually. This amount will
increase with the cost of living/inflation rate.
Current debt service on outstanding bonds is approximately $78,000 per year, of
which $62,000 comes from the Capital Project Fund and $16,000 from the Housing
Fund.
IV. Options
In view of the Agency's limited funding capabilities, the Flood Control District formulated an
alternative funding proposal (Attachment E). The alternative proposal would entail the
Agency committing to:
1. A $400,000 capital contribution by the Agency within the next six years;
Exhibit A
Page 3 of 11
North Richmond Municipal Advisory Board -3- March 17, 1994
2. The�Flood Control District would cavy the full local costs (Flood Control and
Agency portion), including interest on borrowed funds, for up to six years;
3. They,Agency would assume its share of the borrowing costs beginning in
January, 1996.
V. Recommendation
Staff recommends^the following:
1. Commit$400,000 in future Redevelopment Agency revenues to financing the
completion of the Wildcat- San Pablo Creek Flood Control Project;
2. Agency agrees to bear interest costs on its portion of the local match utilizing
,borrowed funds beginning in FY 1996-1997;
3. The Flood Control District commits to the future sale of APN 408-201-17 (3rd
and Brookside) by July 1, 2001 and the allocation of all revenues (less sales
expenses) in excess of $ per sq. ft. in the following
manner.
A. District and Agency interest cost on the $400,000 from July 1, 1994
through July 1, 2001 shall have first claim on said incremental
increase in revenue; and
B. District and Agency shall share equally the remaining increase in
revenue. (Parcel size is 138,956± sq. ft.)
4. Enter into an Agreement with the Flood Control District affecting these
business terms.
## Current estimate of $3.50-$4.00 per square foot; actual
value to be confirmed via appraissal .
JKlh
Attachments
cc: Board of Supervisors
Phil Batchelor
Val Alexeeff
Mlton Kubicek
File D5.1(b)
sra13/nrmac.mem
Exhibit A
Page 4 of 11
CONTRA COSTA COUNTY FLOOD CONTROL
AND WATER CONSERVATION DISTRICT
DATE: January 11, 1994
North Richmond Industrial Property Owners Association and
TO: North Richmond Municipal Advisory Council
FROM: Milton" ic�puty Chief Engineer
SUBJECT: Request for Redevelopment Agency Participation in Financing
Wildcat-San Pablo Creek Corps of Engineers Project
The local cost share of the Corps of Engineers Wildcat-San Pablo Creeks Project is
significantly under funded. We must find$800,000 in additional local funding,to complete
the last contracts on San Pablo and Wildcat Creeks. The purpose of this memo is to
solicit your financial support.
To date, the Corps of Engineers has completed the channel improvements on both
creeks upstream to the Southern Pacific Railroad Company right of way. The
improvements provide some relief of flooding for the North Richmond area; however,
complete 100 year event protection is not possible until the improvements are extended
upstream through the Atchison, Topeka and Santa Fe right of way. The remaining two
contracts are scheduled to be advertised for bids in 1994.
The total cost for all of the creek improvements is approximately $27,000,000. Of this
amount, $21,000,000 has already been expended. The non-federal cost share is
approximately 48 percent due to the extensive right of way acquisition and relocations
associated with the environmentally sensitive alternative selected for implementation.
Thirty percent of this amount must be funded from local sources, i.e. non-state funds.
In the planning stage for the project, approximately 1982, we identified four sources for
project funding:
* Zone 7 Tax Revenue
* Assessment District No. 1992-2
* Donated rights of way by Government.agencies owning adjacent lands
* Drainage Area 73 Fees
Based on the conventional channel system envisioned in 1982, these funding sources
were adequate. However, as the project moved through the local and federal approval
process, environmental enhancements were added increasing the amount of project
rights of way. Further, the concrete channel was eliminated at Verde School, thereby,
significantly increasing our relocation costs, i.e. school sewer line, play fields, access
bridge and alternative access road. These changes increased the non-federal cost share
from approximately 30 percent to 48 percent.
Exhibit A
Page 5 of 11
North Richmond Municipal Advisory Council
January 11, 1994
Page Two
To date, we have expended approximately $4,200,000 on the local share of the non-
federal costs. Of this amount, $1,600,000 represents the increase in local costs resulting
from the change in project scope. This cost has been temporarily covered by loans from
other Flood Control entities that must be repaid. This debt is offset by$800,000 due from
the State of California federal flood control project subvention program and approximately
$800,000 in surplus property in the project area. However, this leaves no funding for
completion of the last two contracts. We need $800,000 to meet the local share of the
non-federal costs associated with contracts 3 and 3a.
On November 18, 1993, we met with the Redevelopment Agency staff to discuss this
issue. We recognize the Agency's limited funding capability. However, we believe some
participation by the Redevelopment Agency is appropriate. If the redevelopment process
is going to be successful, the redevelopment area must be flood free, outside of the 100
year flood plain. If the Corps of,Engineers Project is not finished, the area will still be
subject to flooding. This will impact the types of development that can occur and the tax
increment to be derived from those development.
We respectfully request your support for the Redevelopment Agency to absorb $400,000
of the funding shortfall. To ease the Agency's cash. flow, we would be willing to
recommend to the Board of Supervisors that the District continue to refinance the funding
shortfall to January 1, 1998, with the understanding that the interest costs for refinancing
after January 1, 1996, will be born by the Agency.
MFIM.drg
c:RedvRefat1
cc: P. Batchelor, County Administrator
V. Alexeeff, GMEDA Director
J.M. Watford, Public Works Director
J. Kennedy, Deputy Community Development
P. Harrington, Flood Control
I
I
Exhibit A
Page 6 of 11
ATTACHMENT B
_. . NORMATIVE� PROJECTION OF ,TAX INCREMENT REVENUE
North Richmond Redevelopment Project Area
GROSS TAX ADJUSTMENTS TO TAX INCREMENT NET ANNUAL
FISCAL YEAR INCREMENT (a) Housing Debt Service TAX INCREMENT
1994 $154,000 $30,800 $78,000 $45,200
1995 $181,000 $36,200 $78,000 $66,800
1996 $348,000 $69,600 $78,000 $200,400
1997 $352,000 $70,400 $78,000 $203,600
1998 $356,000 $71,200 $78,000 $206,800
1999 $360, 000 $72,000 $78,000 $210,000
2000 $364,000 $72,800 $78,000 $213,200
2001 $368, 000 $73,600 $781-000 $216,400
(a) Major development assumption is the the IRRF Station will
come on line in ,FY 1996
Source: Katz-Hollis Coren & Associates 1992 Tax Increment
Projections
Exhibit A
Page 7 of 11
ATTACHMENT C
OPTOMISTI'C. .PROJECTION OF. TAX. .INCREMENT REVENUE
North Richmond Redevelopment Project Area
GROSS TAX ADJUSTMENTS TO TAX INCREMENT NET ANNUAL
FISCAL YEAR INCREMENT (a) Housing Debt Service TAX INCREMENT
1994 $154,000 $30,800 $78,000 $45,200
1995 $1'81,000 $36,200 $78,000 $66,800
1996 $4.23,000 $84,600 $78,000 $260,400
1997 $477,000 $95,400 $78,000 $303,600
1998 $481,000 $96,200 $78,000 $306,800
1999 $485,000 $97,000 $78,000 $310,000
2000 $490,000 $98,000 $78,000 $314,000
2001 $490,000 $98,000 $78, 000 $314,000
(a) Major development assumption is the the IRRF Station will
come on line in FY 1996, The Erickson facility in 1997, &
Parkway Estates in FY 1996 (50%) & FY 1997 (50%) .
Source: Katz-Hollis Coren & Associates 1992 Tax Increment
Projections, modified & updated by Contra Costa
County Redevelopment Agency
s `
Exhibit A
Page 8 of 11
a r Contra
/. Costa
TO: REDEVELOPMENT AGENCY
n� .►` 1L J
FROM: Phil Batchelor
Executive Director
DATE: January 11, 1994
SUBJECT: Financial Participation Agreement between Contra Costa County and
County Redevelopment Agency - North Richmond Area of Benefit.
SPECIFIC REQUEST(S) OR RECOMMENDATIONS(S) & BACKGROUND AND JUSTIFICATION
RECOMMENDATIONS
APPROVE and AUTHORIZE the Deputy Director - Redevelopment to execute
a contract with Contra Costa County for the design and construction
of various road improvements located in the North Richmond
Redevelopment Project Area.
FISCAL IMPACT '
No General Fund money will be used on these projects. The total
estimated cost of roadway improvements to be undertaken by the County
1 under the North Richmond Area of Benefit program is $5,576,000. The
Redevelopment Agency will reimburse the County North Richmond Area of
Benefit for expenditures up to $675,700 out of its tax increments or
bonded indebtedness from the North Richmond Redevelopment Project
Area. The projects will be included in the adopted Agency budget for
the fiscal year in which the project would be implemented. The
remaining $4,900,300 will be paid for by the North Richmond Area of
Benefit ($3,767,300) and .developers as fro Cage improvements
($1,133,000) .
CONTINUED ON ATTACHMENT: .—. YES SIGNATURE:
`RECOMMENDATION OF EXECUTIVE DIRECTOR RBCDPAENDAT OF AGENCY COMMITTEE
` APPROVE OTHER
SIGNATURE(S) :
ACTION OF AGENCY ON January 11, 1994 APPROVED AS RECOMMENDED x OTHER
VOTE OF COMMISSIONERS
I HEREBY CERTIFY THAT THIS IS A
X UNANIMOUS (ASSENT ZL ) TRUE AND CORRECT COPY OF AN
AYES: NOES: ACTION TAKEN AND ENTERED ON THE
ABSENT: ABSTAIN: MINUTES OF THE REDEVELOPMENT
AGENCY ON THE DATE SHOWN.
Contact: Jim Kennedy
646-4076 ATTESTED January 11, 1994
cc: Community Development PHIL BATCHELOR
CAO AGENCY SECRETARY
County Counsel
Public Works
BL/jb/finagnr.bos By 414,Oa
DEPUTY
Exhibit A
Page 9 of 11
BACKGROUND/REASONS FOR RECOMMENDATIONS
A major redevelopment activity in the North Richmond area is to
_.improve and..upgrade. the existing infrastructure and ,circulation
patterns. The Redevelopment Agency is assisting the North Richmond
Area of Benefit (N. R. AOB) to allow the Area of Benefit fees to be
kept low to stimulate development. Redevelopment Agency
participation would lower the single family Area of Benefit rate by
$340, $1.05 lower rate for commercial, and $0.30 lower rate for
industrial development. The roadway improvements will visually
enhance the area and encourage industrial development throughout
the industrial section of the North Richmond community. The North
Richmond Municipal Advisory Council approved this program noting
that all improvement would be financed by the Agency and N. R. AOB.
r
f'
Exhibit A
Page 10 of 11
PUBI..IC WORKS DEPARTMENT
CONTRA COSTA COUNTY
DATE: December 2, 1993
TO: James Kennedy, Deputy Director, Community Development
FROM: Milton F. Kubicek, Deputy Public Works Director
SUBJECT: North Richmond Redevelopment Agency Funding
for Wildcat-San Pablo Creeks Project
Based on'our November 18, 1993 meeting regarding the Redevelopment Agenc_y's limited
funding capability, we would like to present the following alternative scenario:
1. The District will retain the surplus properties for future sale after the North
Richmond Bypass and the Corps of Engineers Project are completed;
2. The District will absorb the loss of$400,000 over an six year period by reducing
the District planning efforts and assistance.to others;
3. The Redevelopment Agency will absorb $400,000 of the funding shortfall by
executing an agreement with the District indicating the Agency's willingness to
participate;
4. The District will continue to refinance the funding shortfall and interest costs for a
period of six years;
5. The Redevelopment Agency shall bear the interest costs on its shore of the
funding shortfall being refinanced starting on January 1, 1996.
The District's revenue has been significant reduced over the past two years through the
loss of Special District Augmentation Funds, and our contribution for County Assessor,
Auditor-Controller, and Counsel costs has increased. These changes have dictated a
significant reduction in the District's program. Our absorbing a portion of the Wildcat-San
Pablo Creeks funding shortfall will require further program reductions, approximately ten
percent. This.additional Deduction in the District's program is unacceptable; however, not
meeting our commitments for the Wildcat-San Pablo Corps of Engineers Project and the
loss of approximately $5,000,000 in federal/state channel improvements is more
unacceptable. The District has never participated in the construction of capital
improvements. In the past, all local funding for capital improvements has been generated
within the watershed being served or as a grant from an outside agency, ke. County
Redevelopment, park district, city, etc. The above is a significant deviation from past
practice, and in our opinion sets a bad precedence.
Exhibit A
Page 11 of 11
J. Kennedy _
December 2, 1993
Page Two
We believe some participation by.the .Redevelopment Agency is appropriate. If the
redevelopment process is going to be successful, the redevelopment area must be flood
free, outside of the 100 year flood plain. If the Corps of Engineers Project is not finished,
the area will still be subject to flooding. This will impact the types of development that
can occur and the tax increment to be derived from those development
Finally, we want to confirm the meeting on this matter with Phil Batchelor on December
10, 1993, at 10:30 a.m. in his office.
MFK.ly
c.WCSP.t12
CC.* P. Batchelor, County Administrator
V. Alexeeff, GMEDA Director
J.M. Wa/ford, Public Works Director
z