HomeMy WebLinkAboutMINUTES - 03081994 - 1.8 TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: March 8, 1994
SUBJECT: Approve Plans and Specifications and Advertise for bids for the Paso Nogal/Golf Club
Road Curve Realignment Project.
Project No. 0662-6134129-93, CP # 93-54.
Specific Request(s) or Recommendation(s) & Background & Justification
I. RECOMMENDED ACTION:
APPROVE the Plans and Specifications for the Project and
ADVERTISE for bids to be received on Tuesday, April 5, 1994, at 2:00 p.m.
DIRECT the Clerk of the Board to publish the Notice to Contractors in accordance with Section
20392-of the Public Contract Code, and
AUTHORIZE the closure of Paso Nogal and Golf Club Road to through traffic between 7:30 a.m.
and 7:00 p.m. for approximately three weeks with the exception of emergency vehicles and
local residential traffic.
II. FINANCIAL IMPACT:
The estimated contract cost of the project is$134,000, funded by Central County Area of Benefit
(100%).
III. REASONS FOR RECOMMENDATION/BACKGROUND:
The project is needed to improve the driveability of the curve.
The Public Works Director has filed with the Board of Supervisors the Plans and Specifications
for the project.
Continued on Attachment: X SIGNATURE:
_ RECOMMENDATION OF COUNTY ADMINISTRATOR
RECOMMENDATION OF BOARD COMMITTEE
APPROVE _OTHER
SIGNATURE(S):
ACTION OF BOARD ON MAR- 8 1994 APPROVED AS RECOMMENDED V OTHER
V07OF SUPERVISORS
V07
UNANIMOUS (ABSENT_. :j )
AYES: NOES:
ABSENT: ABSTAIN:
ES:jlg
c\BO:bo2.t3 i Eby cmrtify that this is a true end comectc yof
an action taken and entered on the minutes of The
Orig. Div: Public Works(Design Division) Board of Suppin thl shown.
Contact: Al Schaal (313-2234) ABED: ���/�1� O
cc: County Administrator PHIL BATCHELOR,Clerk of the Board
of Supervisors and ty Administrator
Attn: E. Kuevor
Auditor-Controller 41AA `
PW Accounting Sy .Deputy
Construction
Community Development
Approve Plans and Specifications and Advertise for bids for the Paso Nogal/Golf Club Road Curve
Realignment Project
March 8, 1994
Page 2
The general prevailing rates of wages, which shall be the minimum rates paid on this project,
have been filed with the Clerk of the Board and copies will be made available to any interested
party upon request.
The Board reviewed and approved the project on October 26, 1993 and determined the project
to be exempt from the California Environmental Quality Act as a Class 1 c Categorical Exemption.
A Notice of Exemption was filed with the County Clerk on October 28, 1993.
IV. CONSEQUENCES OF NEGATIVE ACTION:
If the project is not approved for advertising, it will not be constructed.