Loading...
HomeMy WebLinkAboutMINUTES - 03081994 - 1.57 1.56 through 1.57 - THE -BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA Adopted this Order on March 8, 1994, by the following vote: AYES: Supervisors Smith, Bishop, Torlakson and Powers NOES: None ABSENT: Supervisor McPeak ABSTAIN: None SUBJECT: Correspondence Item No. 1.56 LETTER dated February 19, 1994 , from Lance Dow, Vice Chair, Citizens United, 2232 Concord Drive, Pittsburg 94565, expressing concern relative to the excavation of earth from the Keller Canyon Landfill West Buffer Zone and the possible utilization of this material for development. ***REFERRED TO COMMUNITY DEVELOPMENT DIRECTOR 1/1.57 LETTER dated February 23 , 1994, from Glen Williams, Chair, Keller Canyon Landfill Local Advisory Committee, advising of its desire to continue to meet through ' December 1994, pending the completion of the Property Valuation Study. ***REFERRED TO COMMUNITY DEVELOPMENT DIRECTOR IT IS BY THE BOARD ORDERED that the recommendations . as referenced (***) are approved. i nerL l'i'y i:U7Ci'i) ,i:...:iiv,,.,.., u.•�i.0 JUi .;:,.::Ui�y G . cc: Correspondents an action taken and entered on tho minutes of the County Administrator Board ofSupervisorsothe�{�toshQwn., ATTESTED: Iy1 Y Community Development PHIL BATCHELOR,Clerk of the Board of Supervisors andpounty Admin! trator BY \ PUty Community Contra Harvey E. Bragdon Director of Community Development Development Costa Department County County Administration Building 651 Pine Street 4th Floor, North Wing Martinez, California 945530095 Phone: (415) 445-5841 , z February 23, 1994 �. ,.oma ST'9 'Cd VU RECEIVED Supervisor Tom Powers, Chair Contra Costa County 1419 Board of Supervisors 94 651 Pine Street CLERK BOARD OF SUPERVISORS Room 106 CONTRA COSTA CO. Martinez, CA 94553 Dear Supervisor Powers, The Keller Canyon Landfill Local Advisory Committee (LAC) voted to recommend to the County Board of Supervisors that this LAC continue to meet every other month through the 1994 calendar year at our meeting on November 10, 1993. The Keller Canyon Landfill Land Use Permit (2020-89) Condition of Approval 11.2 called for the formation of this LAC. This Condition of Approval also states that this LAC shall hold meetings "at least quarterly through the first two years of operation". As of May 1994 the landfill will have been operating for two years. Condition of Approval 11.2 in its entirety reads: "Local Advisory Committee. The Community Development Department shall organize, and the Landfill developer shall participate in a local advisory committee, consisting of elected representatives of local residents and neighborhood associations, to comment and advise on the development of the landfill and its operations. The Board of Supervisors may sanction the Local Advisory Committee as an official County committee. The committee shall be established as soon as reasonably possible after the Board of Supervisors' approval of this Land Use Permit, if such approval is forthcoming. Meetings shall be initiated following the approval of a Land Use Permit and shall be held at least quarterly through the first two years of landfill operation. Subsequently, meetings may be held annually, but with the provision for meetings on call by the chair or the written request of 3 or more members. The County Health Services Department shall be notified at least 10 days in advance of all meetings. Subjects for consideration at meetings will include, but shall not be limited to safety and emergency procedures, landfill fill-related traffic problems, screening of visual impacts and problems of litter, odor, and noise control. Meeting agenda also may include discussion of reports on the landfill, construction, operation and maintenance. The Landfill operator shall provide reasonable access to the landfill arranged through the Community Development Department. A surcharge on the tipping fee may be used to fund the advisory group's operations." a Supervisor Tom Powers, Chair February 23, 1994 Page 2 However, one of the significant studies related to Keller Canyon Landfill, the Property Valuation Study, will not be completed by the two-year anniversary date for landfill operations. The estimated time frame for completion of this study is late Summer or early Fall of 1994. This Committee feels it is important that they continue to meet until the results of this Property Valuation Study are made available and presented to this Committee. If you have any questions please feel free to call me at (415) 445-5841 or Deidra Dingman of the CCC Community Development Department which is staff to the LAC at (510) 646-4198. Sincerely, Glen Williams, Chair Keller Canyon Landfill Local Advisory Committee cc: Charles A. Zahn, Community Development Department Keller Canyon Landfill Local Advisory Committee Members DDC LACLIFE.LTR