SUBJECT: CORRESPONDENCE
1.94 LETTER dated February 16, 1994, from State Senator -Daniel E.
Boatwright, 1001 Galaxy Way, Suite 210, Concord 94520, in
response to Board letter, advising of the introduction of
legislation SB 1433 (Kopp) that would impose a two cents per
gallon surcharge in taxes on vehicle fuel to fund the repair and
seismic safety retrofit of bridges.
***REFERRED TO TRANSPORTATION COMMITTEE AND COUNTY ADMINISTRATOR
11.95 LETTER dated February 17, 1994, from A. Krygsman, Port Director,
Port of Stockton, P.O. Box 2089, Stockton 945201, in reference
to the dredging schedule for the Suisun Bay and New York Slough
channels by the U.S. Corps of Engineers, and offering the County
the use of the Port-owned Donlon Island site for disposal of the
dredged material subject to the County's execution of certain
agreements.
***REFERRED TO DIRECTOR, GROWTH MANAGEMENT AND ECONOMIC
DEVELOPMENT AGENCY
1.96 LETTER dated February 16, 1994, from Wally Wiggs, Chairman of
the Pacheco Municipal Advisory Council, 187 Freda Drive, Pacheco
94553, expressing appreciation to the Board in getting the trash
removed from Pacheco Boulevard and Aspen Drive near the creek.
***REFERRED TO COUNTY ADMINISTRATOR
IT IS BY THE BOARD ORDERED that the recommendations as referenced
(***) are approved.
cc: Corresondents
County Administrator
Transportation Committee
Growth Management and Economic Development Agency
I horeby certify that tris is a rruo ana corn wt cupy u,
an action taken and ontered on the minutes of thr,
Board of Superw�I��rs on jhe d ,e' own
ATTESTED:�d1� u
PHIL BATCHELOR,Clerk of the Board
of Supervisors a�ndpCounty Ad�'nistrator
By r I Y 1 ���.o .�
_._.Deputy
Port of Stockton
General Offices: P.O. Box 2089, Stockton, CA 95201-2089
(209) 946-0246 / FAX (209) 465-7244 / TELEX 35-9467
February 17, 1994
RECEIVED
The Honorable Tom Torlakson,
Chairman
Contra Costa County FEB8 199fl
Board of Supervisors '
CLERK BOARD OF SUPF.PNISORS�
County Administration Building _ cor]T;..a cc, s. C.0;_.
651 Pine Street, Room 106
Martinez, CA 94553-1290
RE: Scheduled Suisun Bay and New York Slough Maintenance Dredging
and Execution of Project Cooperation Agreement with the San Francisco
District, U.S. Army Corps of Engineers by County Board of Supervisors
Dear Chairman Torlakson:
I understand that the Board of Supervisors has under final consideration
before execution the companion Project Cooperation Agreement with the San
Francisco District, U.S. Army Corps of Engineers to the Modification No. 1 to the
Agreement Between the United States of America and the Stockton Port District for
Local Cooperation on the San Francisco Bay to Stockton, California Project, Avon to
Stockton (John F. Baldwin and Stockton Ship Channels) executed by the Port on
January 10, 1994 providing for the orderly assumption of local responsibility
concerning project maintenance for those project elements within the
jurisdictional boundaries of Contra Costa County and the Corps' San Francisco
District.
You are aware by the exchange of previous correspondence from the
Stockton Port District to the Board dated August 23, 1993, between the Corps
iri.: �'�,,�-•moi-�`��-��-cJ
e.L
GENERAL OFFICE: 2201 W. WASHINGTON ST., STOCKTON, SAN JOAQUIN COUNTY, CALIFORNIA
The Honorable Tom Torlakson
February 17, 1994
Page two
and the Board dated October 18, 1993, and by attached copy of correspondence
between the Corps and the Port dated February 3, 1994, that the Corps has
scheduled maintenance dredging of the Suisun Bay and New York Slough
channels for Fiscal year 1994 for summer 1994 that will require the designation,
site preparation, and required approval of a suitable dredged material disposal
site with the capacity for reception of approximately 100,000 cubic yards of
material from the New York Slough channel and possibly an additional 150,000
cubic yards from the Suisun Bay channel if for any reason the Federal site is
determined to be unsuitable for aquatic disposal. The attached correspondence
indicates that the District operations branch is working with the State
Department of Water Resources for the purpose of utilizing dredged material for
levee rehabilitation on Jersey Island. However, you will note that the proposed
schedule dictates that concurrent exploration of alternative sites would appear to
be prudent.
For this purpose the Port is prepared to offer the County the use of the
Port-owned Donlon Island site on the condition that the County has executed
either the LCA or the Interim Supplemental Agreement transmitted to the
County on December 10, 1993, providing for the interim assumption of local
sponsorship responsibilities by the County pending the execution of the LCA
with the Corps' San Francisco District, including the interim responsibility for
site preparation and approval for site use by the Corps as necessary in
connection with the scheduled maintenance dredging.
Absent either intervening action by the Board in the interim, the Board of
Commissioners of the Stockton Port District would need to convene at the latest
at-its regularly scheduled meeting on March 21, 1994, to consider taking final
action on pending Resolution No. 6636 Ordering the Formation of the John F.
Baldwin (Avon to New York Slough) and Stockton Ship Channels Maintenance
Assessment District 92-1 and for other purposes. This action will be necessary in
order to afford the Port sufficient time to discharge its local responsibilities
under the existing LCA within the necessary time frame to accommodate the
proposed maintenance dredging cycle as set forth in the attached
correspondence.
Regardless, we will continue to work cooperatively with the Board in
resolving and concluding this matter to the benefit of all parties concerned and
The Honorable Tom Torlakson
February 17, 1994
Page three
we acknowledge your considerable individual efforts and those of your staff, as
well as the manifest cooperation and comity exhibited by the other members of
the Board to date. We will endeavor to keep you informed as to any further
actions taken by the Board of Commissioners and request that you do likewise. I
remain confident that the final outcome of our mutual efforts will be successful
reflecting well on both bodies and commensurate with the considerable mutual
time and efforts expended in this regard toward a common goal.
Vertru y yours,
xa gsman
ort Director
LGM:AK/yri
Attachment
cc: Commissioners, Stockton Port District
Lawrence G. Mallon, Esq.
Michael Cheney, P.E.
BM,jin
DEPARTMENT OF THE ARMY
.J SAN FRANCISCO DISTRICT, CORPS OF ENGINEERS
-1
211 MAIN STREET
SAN FRANCISCO, CALIFORNIA 94105-1905
03 February 1994
Construction-Operations Division
SUBJECT: Suisun Bay Channel and New York Slough Dredging
Mr. Alexander Krygsman
Port Director
P.O. Box 2089
Stockton, California 95201-2089
Dear Mr. Krygsman:
This letter advises the Port of Stockton of the San Francisco
District's Fiscal Year 1994 maintenance dredging schedule for Suisun
Bay and New York Slough Channels .
At this time, we anticipate dredging an estimated 150,000 cubic
yards from the Suisun Bay Channel and 100,000 cubic yards from the
New York Slough Channel . We anticipate the material from both
channels to be primarily sandy soils . Please note that the
quantities may differ from those estimated at this time, due to
shoaling, scouring, and sedimentation caused by winter storms .
We have scheduled the disposal of the Suisun Bay Channel material
in the historical Suisun Bay Channel site. We have scheduled the New
York Slough disposal for a site provided by the local sponsor, the
Port of Stockton, per the 1982 Local Cooperation Agreement (LCA) ,
paragraph l.a. General Requirements, subparagraphs ( 1) and (2) .
Based on our historical records, we recommend that you provide
capacity to accommodate approximately 100,000 cubic yards of in-place
material. To provide the necessary assurances, the Corps requests
that you submit the following for -the Corps of Engineers review and
comments :
a. The design of the disposal area to include, but not be
limited to the weir(s) and the leeves, the design criteria, water
quality, materials testing, and analysis used to formulate the
design.
b. The holding capacity and concentration time of the disposal
area computed by a registered, licensed professional engineer.
c. A drawing which depicts the prepared disposal area. The
drawing(s) should include a plan view of the disposal area, cross
sections at 50-foot intervals showing floor elevations within the
area, before and after construction, along with inside and outside
dike slopes, weir size(s) , and location(s) .
d. A schedule showing when the disposal area preparation will be
completed.
e. Inspection of the disposal area dikes by your office to be
accompanied by a representative from our office shouldbe scheduled
to assure their integrity so that corrective measures, if any, can be
implemented prior to contract award.
f. All Corps of Engineers comments shall be considered by the
Port of Stockton prior to use of the disposal structure for disposal
of materials in this project.
We are working with -the California State Department of Water
Resources for utilizing the material from subject projects for levee
rehabilitation on Jersey Island. We will keep you informed of
-developments. However, it is adviseable and prudent to plan for a
site provided by the Port of Stockton per the LCA in the event an
alternative solution is not found and -implemented in time.
The project schedule for the Suisun Bay Channel maintenance
dredging for Fiscal Year 1994 is as follows:
Event Date Complete
Condition Survey 07 Mar 1994
Sediment Sampling 21 Mar 1994
Sediment Testing Results 09 Jun 1994
Water Board Certification 23 Jun 1994
Advertise Construction Contract 09 Jul 1994
Open Bids 10 Aug 1994
Award Construction Contract 16 Aug 1994
Issue Notice to Proceed 20 Aug 1994
Complete Construction 20 Sep 1994
The project schedule for the New York Slough maintenance
dredging for Fiscal Year 1994 is as follows :
Event Date Completed
Condition Survey 07 Mar 1994
Sediment Sampling 21 Mar 1994
. Sediment Testing Results 09 Jun 1994
Water Board Certification 23 Jun 1994
Advertise Construction Contract 14 Jun 1994
Open Bids 14 Jul 1994
Award Construction Contract 27 Jul 1994
Issue Notice to Proceed 31 Jul 1994
Complete Construction 31 Sep 1994
Please provide the requested information to this office not
later than May 7, 1994, so that we can maintain the schedule shown
above. Utilize Marc McGovern of my staff as a primary point of
contact and to answer any questions, (415) 744-3295.
Sincerely,
Zzxi
, . -Blodgett 3 '
Acting Chief, Construction-
Operations Division