Loading...
HomeMy WebLinkAboutMINUTES - 03151994 - 2.3 ` ~+ TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, CHIIF ENGINEER DATE: March 1, 1994 SUBJECT: Approve Drainage Area 10 - Line "G" Improvements Project, on Rutherford Creek in the Danville Area. Project No. 7554-6D8482-92, CP # 94-4. Specific Request(s) or Recommendations) & Background & Justification I. RECOMMENDED ACTION: APPROVE Project, and FIND, on the basis of the initial study and all comments received, that there is no substantial evidence that the project will have a significant effect on the environment, ADOPT the Negative Declaration in compliance with the California Environmental Quality Act, and DIRECT the Chief Engineer to begin right of way acquisition and to prepare contract plans and specifications for construction. DIRECT the Chief Engineer to arrange for payment of the $25.00 handling fee to the County Clerk. DIRECT the Chief Engineer to arrange for the $1,250.00 Fish and Game filing fee to be transferred to the County Clerk. II. FINANCIAL IMPACT: The estimated project cost is $390,000, funded by Drainage Area 10 Funds (100%). Continued on Attachment: X SIGNATURE: _ RECOMMENDATION OF COUNTY ADMINISTRATOR _ RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON March 15, 1994 APPROVED AS RECOMMENDED X OTHER The Board on March 8, 1994 had this item before it and deleted it from consideration at that time. The matter was placed on the March 15, 1994 agenda and was passed unanimously. VOTE OF SUPERVISORS X UNANIMOUS (ABSENT ) AYES: NOES: ABSENT: ABSTAIN: JY:jlg c\BO:bol 5bA2 I hereby certify that this Ise trueand correctcopyof an action taken and entered on the minutes of the Board of supervisors on the date shown. Orig. Div: Public Works (Design Division) ATTESTE0: Nag�.h 15a 1994 Contact: Bill Fernandez, (313-2294) PHIL BATCHELOR Clerk of the Board cc: County Administrator of supervisors and dLnty Administrator Attn: E. Kuevor Auditor-Controller By. ,Deputy PW Accounting Construction Community Development Approve Drainage Area 10 - Line "G" Improvements Project, on Rutherford Creek in the Danville Area March 1, 1994 Page 2 III. REASONS FOR RECOMMENDATION/BACKGROUND: The project includes replacing existing 48" culverts crossing Danville Boulevard with a single 96" pipe. It is needed to increase the efficiency of the Rutherford Creek crossing which will minimize local flooding of roadways and property in the project vicinity. The project has been determined to be in compliance with the General Plan. A Negative Declaration of environmental significance pertaining to this project was published January 14, 1994 with no protest, and the Board has considered the negative declaration together with all comments received during the public review period. IV. CONSEQUENCES OF NEGATIVE ACTION: Delay in approving the project will result in a delay of design and construction and may jeopardize funding.