Loading...
HomeMy WebLinkAboutMINUTES - 03151994 - 1.14 TO: BOARD OF SUPERVISORS, AS BOARD OF DIRECTORS, BLACKHAWK GEOLOGIC HAZARD ABATEMENT DISTRICT FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: MARCH 15, 1994 SUBJECT: STATUS AND EXPENSE REPORT FOR THROUGH THE SECOND QUARTER OF THE FISCAL YEAR 1993-94, BLACKHAWK GEOLOGIC HAZARD ABATEMENT DISTRICT SPECIFIC REQUEST(S)OR RECOMMENDATION(S)&BACKGROUND AND JUSTIFICATION I. Recommended Action: ACCEPT the Blackhawk G.H.A.D. Quarterly Status and Expense Report for the Second Quarter Fiscal Year 1993-94. II. Financiallmpact: None III. Reasons for Recommendations and Background: During the first part of the second quarter our main projects continued to be the construction of stormwater runoff control devices,retaining walls and storm drainage maintenance. This construction was required during this quarter in order to prepare for the possibility of a heavy rainfall again this winter. In addition, we also experienced significant expenses in our continuing geologic investigations of several properties which have experienced building subsidence, in our attempt to determine the causes of the subsidence. This work has now concluded the major expenses in preparation for this winter. These expenses $268,410.62 for all construction work through the second quarter of are approximately 86% of our annual construction budget. During this winter we will continue to sharply reduce our construction expenses (except for emergency projects), so that most of the remaining 14% of our construction budget can be available to us this spring. IV. Consequences of Neaative Action: None Continued on Attachment: SIGNATURE _RECOMMENDATION OF COUNTY ADMINISTRAIrOR _RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON MAR 15 1994 APPROVED AS RECOMMENDED V OTHER VOTE OF SUPERVISORS UNANIMOUS (ABSENT ) AYES: NOES: ABSENT: ABSTAIN: E:fp h:Mghad15.t3 I hereby ccrtiy that this is a true and correct copy of an action taken and ontered on the minutes of the Contact:Skip Epperty,313-2253 Board of Supgr�rtSRpfgeshown. ATTESTED: P'1pAFI(( 11 �t Orig. Div: Public Works (E/S) PHIL BATCHELOR, Clerk of the Board cc: Auditor/Controller of Supervisors and County Administrator County Counsel PW-Accounting By. Ln ��� Deputy Richard Nystrom 500 Ygnacio Valley Road#425 Walnut Creek, CA 94596 BLACKHAWK GEOLOGIC HAZARD ABATEMENT DISTRICT REPAIR AND IMPROVEMENT PROJECTS 1993-1994 FISCAL YEAR - Second Quarter Est. Budget Actual Cost % Budget Category (FY'93-'94) (Jul.-Dec.) consumed Slope Stabilization 1. Corrective Grading 80,000.00 27,240.70 2. Revegetation 70,000.00 16,377.10 3. Retaining or Pin Walls 20,000.00 35,079.62 Surface Drainage Improvements 4. Maint. B-58 Drain Syst. 25,000.00 7,682.00 5. Const. B-58 Drain. Syst 15,000.00 35,558.29 6. Storm Drain Maintenance 5,000.00 28,652.33 7. Grading ditches/swales 15,000.00 1,702.96 8. Erosion/Runoff Cont Devices 20,000.00 73,411.85 Subsurface Drainage 9. Subdrain Insp. and Maint. 10,000.00 3,464.01 10. Horiz. Drain Insp. and Maint. 7,000.00 9,612.19 11. Drilling Horiz. Drains 10,000.00 0.00 Repair of Existing Improvements 12. Insp. and Repair of Drain Struct. 24,500.00 16,036.08 13. Other Construction Projects 10.000.00 13.593.49 TOTAL $ 311,500.00 $ 268,410.62 86% 5 1 ' V♦ BLACKHAWK GEOLOGIC HAZARD ABATEMENT DISTRICT FINANCIAL REPORT FY '93-'94 February 15, 1994 BUDGET ACTUAL EXPENSES A. SAVINGS ACCOUNT JUL '93 - JUN '94 JUL '93 - DEC '93 1. Gen. Reserve in GHAD Fund (Savings Acct) B. PROJECTED INCOME 1. Annual Revenue Via CSA M-23 $675,000.** 2. Estimated Interest Earnings 51,000. TOTAL INCOME: 726,000. C. PROJECTED EXPENSES 1. General Manager 36,000. $15,000. 2. Engineering Geologist and Assistant Geologist 115,000. 49,005. 3. Support services (e.g. office space, office equipment, office staff vehicles) 0* 0 4. a) Repair, maintenance and improvements (as per approved Repair, Maintenance and Improvement Program) 311,500. 268,410.62 b) Construction Administration 65,000. 30,607.50 5. Legal, accounting and insurance 5,000. 1,486.00 6. Professional Soils & Geotechnical Consulting 75,000. 55,854.99 7. Professional Civil Engineering and Environmental Consulting 24,000. 19,499.94 8. County staff services 10,000. 0 TOTAL EXPENSES: $641,500. $439,864.05 9. Reserve 84,500. TOTAL BUDGET: $726,000. * Included in items 1, 2, and 4(b). **Income reduction resulting from cuts in State budget and from$125,000 allocation to"Blackhawk Rd.Park"fund. W:\DATA\WP51\NANCY\BLAKEAYIK\FINR.PT.94