Loading...
HomeMy WebLinkAboutMINUTES - 03151994 - 1.13 TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: March 15, 1994 SUBJECT: STATUS AND EXPENSE REPORT FOR THE SECOND QUARTER OF FISCAL YEAR 1993- 94 CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT SPECIFIC REQUEST(S)OR RECOMMENDATION(S)& BACKGROUND AND JUSTIFICATION I. Recommended Action: ACCEPT the Canyon Lakes G.H.A.D. Status and Expense Report for the second quarter of Fiscal Year 1993-94. II. Financiallmpact: No County General Fund impact. III. Reasons for Recommendations and Background: During the second quarter, the District continued with erosion control, sub-drain maintenance, installing horizontal drains and the re-vegetation of areas to re-stabilize them. As to the status of our budget, the construction costs through the second quarter ($83,971.65) are approximately 53% of our annual construction budget ($158,200), and our total expenses through this quarter ($166,391.95) were approximately 56% of our total annual budget ($299,200). IV. Consequences of Negative Action: None. Continued on Attachment: SIGNATURE: _RECOMMENDATION OF COUNTY ADMINISTRATOR _RECOMMENDATION OF BOARD COMMITTEE APPROVE _OTHER SIGNATURE(S): ACTION OF BOARD ON MAN 15 1994 APPROVED AS RECOMMENDED OTHER VOT OF SUPERVISORS V07 UNANIMOUS (ABSENT ) AYES: NOES: ABSENT: ABSTAIN SE- h:BO\Lake 15.t3 I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the of SuContact: Skip Epperly, 313-2253 Board ATTESTTED: ��PP((MPeRy Of Tin hown. Ong. Div: Public Works(Admin.) of Supe visors and Co Inty ofthe cc: Auditor-Controller County Counsel Richard Nystrom By Deputy Canyon Lakes GHAD Public Works Accounting SANDS CONST}?tJCTION INC. 5102831974 P. 02 1-1.3 CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT REPAIR AND IMPROVEMENT PROJECTS 1993-1994 FISCAL YEAR Est. Budget Actual Cost % Budget Category (FY'93=94) (Jul.- Dec.) consumed Slope Stabilization 1. Corrective Grading $ 24,000.00 18,821.56 2. Revegetation 32,000.00 26,031.48 3. Retaining or Pin Wails 11,000.00 1,083.71 Surface Drainage Improvements 4. Maint. B-58 Drain Syst, 12,600.00 314.50 5. Const. B-58 Drain. Syst. 4,000.00 0.00 6. Storm Drain Maintenance 5,000.00 0.00 7. Grading ditches/swales 5,000.00 0.00 8. Erosion/Runoff Cont. Devices 12,000.00 7,190.51 Subsurface Drainage 9. Subdrain Insp. and Maint. 3,000.00 17,964.60 10. Horiz. Drain Insp, and Maint. 3,000.00 452.50 11. Drilling Horiz. Drains 20,000.00 2,906.43 Repair of Existing Improvements 12. Insp. and Repair of Drain Struct. 20,000.00 0.00 13. Other Construction Projects §,600.0 , 9,206.16 TOTAL $ 158,200.00 $ 83,971.65 53% CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT ESTIMATED BUDGET 1993-1994 FISCAL YEAR BUDGET ACTUAL EXPENSES A. PROJECT INCOME FY '93-'94 July '93 - Dec '94 1. Balance (Reserve) brought forward $562,700. 2. Annual Income via Assessments: 283,300. 743 Single Family Detached 469 Townhouses 2,576 Condominiums/Rentals 100,000 square feet Commercial 3. Estimated Interest Earnings 17,000. TOTAL ESTIMATED FUNDS: $863,000. B. PROJECTED EXPENSES 1. General Manager 15,000. 4,000. 2. Engineering Geologist and Geologist Assistant 58,000. 35,770. 3. Support Services (i.e., office space, office equipment, office staff and vehicles) 0.* 0. 4. a) Repair, maintenance and improvements (as per approved Repair, Maintenance and Improvement Program.) 158,200. 83,971.65 b) Construction Administration 27,000. 14,310.00 5. Legal, accounting and insurance 5,000. 0. 6. Professional Soils and Geotechnical Consulting 12,000. 25,363.75 7. Professional Civic Engineering & Enviornmental Consulting 4,000. 1,101.55 8. County staff services 10,000. 0. 9. Assessment documents preparation 10,000. 1,875. Total Expenses: $299,200. $166,391.95 Reserve: 563,800. Total Costs: $863,000. *Included in line items 1, 2, and 4(b). W:\DATA\WP5IINANCY\CANYONLK\CLBUDGET.94