HomeMy WebLinkAboutMINUTES - 06081993 - 1.5 TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: June 8, 1993
SUBJECT: Approve Plans and Specifications and Advertise for bids for the 1993 Byron Highway
Overlay Project
Project No. 0662-6134209-92, CP # 92 - 58.
Specific Request(s) or Recommendations) & Background & Justification
I. RECOMMENDED ACTION:
APPROVE the Plans and Specifications for the Project and
ADVERTISE for bids to be received on Tuesday, July 6, 1993, at 2:00 p.m.
DIRECT the Clerk of the Board to publish the Notice to Contractors in accordance with Section
20392 of the Public Contract Code, and
II. FINANCIAL IMPACT:
The estimated contract cost of the project is $467,000, funded by Federal Transportation
Improvement Program (72%) and Measure C - Half Cent Sales Tax (28%).
III. REASONS FOR RECOMMENDATION/BACKGROUND:
The project is needed to preserve the integrity of Byron Highway and keep it in a serviceable
condition.
The Public Works Director has filed with the Board of Supervisors the Plans and Specifications
for the project.
Continued on Attachment: X SIGNATURE: AA4tt7a
ZU
_ RECOMMENDATION OF COUNTY ADMINISTRATOR
_ RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON JUN 8 1993 APPROVED AS RECOMMENDED OTHER
VOTE OF SUPERVISORS
4— UNANIMOUS (ABSENT )
AYES: NOES:
ABSENT: ABSTAIN:
JBM:jlg
c\BO:b011.6 t hereby certify that this is a true and correct copy of
an action taken and entered on the minutes of the
Orig. Div: Public Works (Design Division) Board of Supervisors on the date shown.
Contact: Brian Morrow, (313-2236) ATTESTED: JUN R 1993 s ,
cc: County Administrator PHIL BATCHELOR,Clerk of the Board
Attn: E. Kuevor of Supervisors and County Administrator
Auditor-Controller
PW Accounting e � ,
Construction BY ,. s%a st — — -Puty
Community Development
Approve Plans and Specifications and Advertise for bids for the 1993 Byron Highway Overlay Project
June 8, 1993
Page 2
The general prevailing rates of`wages, which shall be the minimum rates paid on this project, have been
filed with the Clerk of the Board and copies will be made available to any interested party upon request.
The Board reviewed and approved the project on September 8, 1992, and determined the project to
be exempt from the California Environmental Quality Act as a Class 1 C Categorical Exemption. A
Notice of Exemption was filed'!with the County Clerk on September 14, 1992.
IV. CONSEQUENCES OF NEGATIVE ACTION:
If the project is not approved for advertising, it will not be constructed.