HomeMy WebLinkAboutMINUTES - 06221993 - 1.5 TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: June 22, 1993
SUBJECT: Approve Plans and Specifications and Advertise for bids for the Kensington Roads
Improvement Assessment District - Slurry Seal Phase One Project.
Project No. 4500-6X5226-92, CP # 91-60.
Specific Request(s) or Recommendations) & Background & Justification
I. RECOMMENDED ACTION:
APPROVE the Plans and Specifications for the Project and
ADVERTISE for bids to be received on Tuesday, July 20, at 2:00 p.m.
DIRECT the Clerk of the Board to publish the Notice to Contractors in accordance with Section
20392 of the Public Contract Code.
II. FINANCIAL IMPACT:
The estimated contract cost of the project is$25,400,funded by Kensington Roads Improvement
Assessment District (100%).
III. REASONS FOR RECOMMENDATION/BACKGROUND:
The project consists of slurry sealing various roads in Kensington and is part of the Kensington
Roads Improvements Assessment District, A.D. 1991-1.
The project is needed to seal coat the surface of the roads identified in the Assessment District.
The Public Works Director has filed with the Board of Supervisors the Plans and Specifications
for the project.
Continued on Attachment: X SIGNATURE: /X/C,ltezl
_ RECOMMENDATION OF COUNTY ADMINISTRATOR
_ RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON JUN 2 2 1993 APPROVED AS RECOMMENDED OTHER _
VOTE OF SUPERVISORS
_ UNANIMOUS (ABSENT )
AYES: NOES:
ABSENT: ABSTAIN:
BB:jlg
c\BO:bo22.t6 I hereby certify that this is a true and correct copy 3f
an action taken and entered on the minutes of the
Orig. Div: Public Works(Design Division) Board of Superv) �1onthee daft own.
Contact: Brian Balbas, (313-2243) ATTESTED: IY 2 t§ '
cc: County Administrator PHIL BATCHELOR,Clerk of the Board r
Attn: E. Kuevor of Supervisors andCo my Administrator
Auditor-Controller
PW Accounting '
Construction BY .Ifleputy
Community Development
Approve Plans and Specifications and Advertise for bids for the Kensington Roads Improvement
Assessment District - Slurry Seal Phase One Project
June 22, 1993
Page 2
The general prevailing rates of wages, which shall be the minimum rates paid on this project,
have been filed with the Clerk of the Board and copies will be made available to any interested
parry upon request.
The Board reviewed and approved the project on July 16, 1992 and determined the project to
be exempt from the California Environmental Quality Act as a Class 1 c Categorical Exemption.
A Notice of Exemption was filed with the County Clerk on July 17, 1992.
IV. CONSEQUENCES OF NEGATIVE ACTION:
If the project is not approved for advertising, it will not be constructed and the terms of the
Assessment District will not be met.