Loading...
HomeMy WebLinkAboutMINUTES - 06221993 - 1.3 (2) /-3-6 TO: BOARD OF SUPERVISORS, AS THE GOVERNING BOARD OF CONTRA COSTA COUNTY AND CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVA- TION DISTRICT FROM: J. MICHAEL WALFORD, CHIEF ENGINEER DATE: June 22, 1993 SUBJECT: Approve Plans and Specifications and Advertise for bids for the 1993 Walnut Creek Desilting Project.; Project No. 7520-6B9316=93, CP # 92 - 21. Specific Request(s) or Recommendation(s) & Background & Justification I. RECOMMENDED ACTION: APPROVE the Plans and Specifications for the Project and ADVERTISE for bids to be received on Tuesday, July 20, 1993, at 2:00 p.m. DIRECT the Clerk of the Board to publish the Notice to Contractors in accordance with Section 21191 of the Public Contract Code, and ll. FINANCIAL IMPACT: The estimated contract cost of the project is $184,000, funded by Zone 3B Flood Control funds (100%). Ill. REASONS FOR RECOMMENDATION/BACKGROUND: The project is needed to remove accumulated sediment and restore the bottom elevations of the Walnut Creek Channel, which will reestablish the volume and flow capacities of the channel within the project limits. The Chief Engineer has filed with the Board of Supervisors the Plans and Specifications for the project. Continued on Attachment: x SIGNATURE: a(/ ' 1, RECOMMENDATION OF,COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON JUN 2 2 1993 APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS X UNANIMOUS (ABSENT) ) i hereby certify that this is a true and correct copy of an action taken and entered on the minutes of tM 3oard of Supervisors on the date shown. AYES: NOES: ATTESTED: 'N .2..-1993 ABSENT: ABSTAIN: PHIL BATCHELOR,Clerk of the Board of Supervisors and Co ty Administrator HF:kd _ c\BO:BO22.t6 Orig. Div: Public Works (Flood Control Division) By +VePutY oContact: P. Harrington,313-2270 . cc: County Administrator Attn: E. Kuevor Auditor-Controller PW Accounting Construction 1993 WALNUT CREEK DESILTING June 22, 1993 Page Two The general prevailing rates of wages, which shall be the minimum rates paid on this project, have been filed with the Clerk of the Board and copies will be made available to any,interested party upon request. The Board reviewed and approved the project on May 5, 1992, and determined the project to be exempt from the California Environmental Quality Act as a Class 4G Categorical Exemption. A Notice of Exemption was filed with the County Clerk on May 6, 1992. IV. CONSEQUENCES OF NEGATIVE ACTION: If the project is not approved for advertising, the channel's volume and flow capacities will not be reestablished.