HomeMy WebLinkAboutMINUTES - 06221993 - 1.3 (2) /-3-6
TO: BOARD OF SUPERVISORS, AS THE GOVERNING BOARD OF CONTRA COSTA
COUNTY AND CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVA-
TION DISTRICT
FROM: J. MICHAEL WALFORD, CHIEF ENGINEER
DATE: June 22, 1993
SUBJECT: Approve Plans and Specifications and Advertise for bids for the 1993 Walnut Creek
Desilting Project.;
Project No. 7520-6B9316=93, CP # 92 - 21.
Specific Request(s) or Recommendation(s) & Background & Justification
I. RECOMMENDED ACTION:
APPROVE the Plans and Specifications for the Project and
ADVERTISE for bids to be received on Tuesday, July 20, 1993, at 2:00 p.m.
DIRECT the Clerk of the Board to publish the Notice to Contractors in accordance with Section
21191 of the Public Contract Code, and
ll. FINANCIAL IMPACT:
The estimated contract cost of the project is $184,000, funded by Zone 3B Flood Control funds
(100%).
Ill. REASONS FOR RECOMMENDATION/BACKGROUND:
The project is needed to remove accumulated sediment and restore the bottom elevations of
the Walnut Creek Channel, which will reestablish the volume and flow capacities of the channel
within the project limits.
The Chief Engineer has filed with the Board of Supervisors the Plans and Specifications for the
project.
Continued on Attachment: x SIGNATURE: a(/
' 1,
RECOMMENDATION OF,COUNTY ADMINISTRATOR
RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON JUN 2 2 1993 APPROVED AS RECOMMENDED OTHER
VOTE OF SUPERVISORS
X UNANIMOUS (ABSENT) ) i hereby certify that this is a true and correct copy of
an action taken and entered on the minutes of tM
3oard of Supervisors on the date shown.
AYES: NOES: ATTESTED: 'N .2..-1993
ABSENT: ABSTAIN: PHIL BATCHELOR,Clerk of the Board
of Supervisors and Co ty Administrator
HF:kd _
c\BO:BO22.t6
Orig. Div: Public Works (Flood Control Division) By +VePutY
oContact: P. Harrington,313-2270 .
cc: County Administrator
Attn: E. Kuevor
Auditor-Controller
PW Accounting
Construction
1993 WALNUT CREEK DESILTING
June 22, 1993
Page Two
The general prevailing rates of wages, which shall be the minimum rates paid on this project, have been
filed with the Clerk of the Board and copies will be made available to any,interested party upon request.
The Board reviewed and approved the project on May 5, 1992, and determined the project to be
exempt from the California Environmental Quality Act as a Class 4G Categorical Exemption. A Notice
of Exemption was filed with the County Clerk on May 6, 1992.
IV. CONSEQUENCES OF NEGATIVE ACTION:
If the project is not approved for advertising, the channel's volume and flow capacities will not be
reestablished.