Loading...
HomeMy WebLinkAboutMINUTES - 06151993 - 1.6 TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: June 15, 1993 SUBJECT: Approve and Authorize the Chairperson to Execute Program Supplement #092 for Deck Rehabilitation and Upgrade Bridge Rails on Avon Bridge at Waterfront Road and Pacheco Slough. Project No.: 0662-6R4089 SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION I. Recommended Action: APPROVE and AUTHORIZE the Chairperson of the Board of Supervisors to execute Program Supplement #092 which provides $377,600 in Federal Bridge Replacement and Rehabilitation funds for deck rehabilitation and upgrade bridge rails on Avon Bridge at Waterfront Road and Pacheco Slough. II. Financial Impact: The supplement provides reimbursement from HBRR funds of 74% of the County's estimated cost of the project. The County must provide the remaining 26% of the funding for these items. III. Reasons for Recommendations and Background: On June 21, 1977 the Board approved the County-State Master Agreement No. 045928 for the funding of Federal aid projects. On January 24, 1990 Contra Costa County qualified for Federal funds to rehabilitate the deck and upgrade the bridge rails on Avon Bridge at Waterfront Road and Pacheco Slough. Caltrans and the Federal Highway Administration have determined that the County can be reimbursed for the 74% of the County's estimated Construction and Construction Engineering costs of the project. Continued on Attachment: X SIGNATURE: RECOMMENDATION OF COUNTY ADMINISTRATOR _ RECOMMENDATION OF BOARD COMMITTEE _APPROVE _ OTHER SIGNATURE(S): ACTION OF BOARD ON JUN 5 1993 APPROVED AS RECOMMENDED OTHER_ VOTE OF SUPERVISORS UNANIMOUS (ABSENT AYES: NOES: ABSENT: ABSTAIN: I hereby certify that this Is a true and correct copy of an action taken and entered on the minutes of the HB/BS:pe Board of Su the� 5 �Ma dAe�town. c:BO15.t6 ATTESTED: NN !. .9 a Contact: B.Schamach,313-2355 PHIL BATCHELOR,Clerk of the Board Orig. Div: Public Works (Transportation Engineering) of Supervisors and County Administrator cc: R.Gilchrist,Accounting sy ,_ [�GiiL� ��a ,deputy Approve and Authorize the Chairperson to Execute Program Supplement#092 for Deck Rehabilitation and Upgrade Bridge Rails on Avon Bridge at Waterfront Road and Pacheco Slough. June 15, 1993 Page Two III. Reasons for Recommendations and Background: (Continued) The Board reviewed and approved the project on July 31, 1990, and determined the project to be exempt from the California Environmental Quality Act as a Class 1 c Categorical Exemption. IV. Consequences of Negative Action If this program supplement is not approved, the County will have to absorb the entire cost of Construction and Construction Engineering for this project. T Date: April 19, 1993 PROGRAM SUPPLEMENT NO. 092 Location: 04-CC -0-CR to Project Number: BHLS-5928(011) LOCAL AGENCY-STATAGREEMENT E.A. Number: 04-067204 E FOR FEDERAL-AID PROJECTS NO. 04-5928 This Program Supplement is hereby incorporated into the Local Agency-State Agreement for Federal Aid which was entered into between the Local Agency and the State on 06/21/77 and is subject to all the terms and conditions thereof. This Program Supplement is adopted in accordance with Paragraph 2 of Article .II of the aforementioned Master Agreement under authority of Resolution No. , approved by the Local Agency on (See copy attached) . The Local Agency further stipulates that as a condition to payment of funds obligated to this project, it accepts and will comply with the covenants or remarks setforth on the following pages. PROJECT TERMINI: AT AVON BRIDGE ON WATERFRONT RD @ PACHECO SLOUGH. BR. NO. 28C-0006 TYPE OF WORK: DECK REHAB & UPGRADE BRIDGE RAILS LENGTH: 0.1 (MILES) PROJECT CLASSIFICATION OR PHASE(S) OF WORK [ ] Preliminary Engineering [ ] Right-of-Way [ ] [X] Construction Engineering [X] Construction Estimated Cost Federal Funds Matching Funds Local OTHER OTHER $ 509000 118 $ . 377600 $ 131400 $ 0 $ 0 $ 0 COIINTY OF CONTRA COSTA STATE OF CALIFORNIA _ 1 Department of Transportation By O /(!BC/ S ^ By Chair, Board of Supervisors DEPUTY DISTRICT DIRECTOR OF TRANSPORTATION, DISTRICT 4 Date June 15, 1993 Date Attest By I hereby Certify upon my personal knowledge that budgeted funds are available for this encumbrance: Accounting Officer �o-✓�- Date -/� - `�3 $ 377600.00 Chapter Statutes I Item Year Program 18C1 Fund Source AMOUNT 587 1992 2660-101-890 92-93 20.30.010.300 C 224060 892-F 377600.00 FOR.N4 APP .,^•VED VICTOR J. WEST At.N, Co;:nty Counse! By D.qutyadz Page 1 of 2 04-CC -0-CR DATE: 04/19/93 BHLS-5928 (011) SPECIAL COVENANTS OR REMARKS 1. All maintenance, involving the physical condition and the operation of the improvements, referred to in Article VI MAINTENANCE of the aforementioned Master Agreement will be performed by the Local Agency at regular intervals or as required for efficient operation of the completed improvements. 2. The Local Agency will advertise, award, and administer this project and will obtain the State's concurrence prior to either award or rejection of the contract. 3. The Local Agency agrees the payment of Federal funds will be limited to the amounts approved by the Federal Highway Administration in the Federal-Aid Project Agreement (PR-2)/Detail Estimate or its modification (PR-2A) or the FNM-76, and accepts any increases in Exchange Funds, State Matching funds, and\or Local Agency Funds as shown on the Finance or Bid Letter or its modification as prepared by the Division of Local Streets and Roads. 4. In executing this Program Supplemental Agreement, Local Agency hereby reaffirms the "Nondiscrimination Assurances" contained in the aforementioned Master Agreement for Federal-Aid Program. 5. Whenever the local agency uses a consultant on a cost plus basis, the local agency is required to submit a post audit report cover- ing the allowability of cost payments for each individual consul- tant or sub-contractor incurring over $25,000 on the project. The audit report must state the applicable cost principles utili- zed by the auditor in determining allowable costs as referenced in CFR 49, part 18, Subpart C - 22, Allowable Costs. Page 2 of 2