Loading...
HomeMy WebLinkAboutMINUTES - 05251993 - 1.17 _ /,1 7 TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: May 25, 1993 SUBJECT: STATUS AND EXPENSE REPORT FOR THE THIRD QUARTER OF FISCAL YEAR 1992-93 (ACCUMULATIVE FOR JULY 1992 - MARCH 1993) CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION I. Recommended Action: ACCEPT the Canyon Lakes G.H.A.D. Status and Expense Report for the third quarter of Fiscal Year 1992-93. II. Financial! Impact: No County General Fund impact. Ill. Reasons for Recommendations and Background: During the third quarter, the District continued repair and maintenance of drainage structures, installation of erosion control devices, corrective grading and sub-drain maintenance. We also continued additional studies by our geologic consultants as to the causes of settlement in some areas. As to the status of our budget, the construction costs for the first three quarters ($104,263.54) are approximately 63 percent of our annual budget, and our total expenses through this year ($196,366.56) were approximately 64 percent of our total annual budget. IV. Consequences of Negative Action: None. 1 Continued on Attachment: SIGNATURE: C ' _ RECOMMENDATION OF COUNTY ADMINISTRATOR _ RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON MAY 2 5 1993 APPROVED AS RECOMMENDED V OTHER — VOT. OF SUPERVISORS t� UNANIMOUS (ABSENT ) AYES: NO ABSE ABS CC:sj i hereby certify that this is a true and correct copy of c:BOCanLake.t5 an action taken and entered on the minutes of the Board of Supe p�the;��;own. Contact:Skip Epperly,313-2253 ATTESTED: 2 5 1 7 Orig. DIV: Public Works (Admin.) PHIL BATCHELOR,Clerk of the Board cc: Auditor-Controller of supervisors and Coun Administrator County Counsel - Richard Nystrom By ,,Deputy Canyon Lakes GHAD Public Works Accounting ♦4 CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT FINANCIAL REPORT 1992-1993 FISCAL YEAR ESTIMATED BUDGET ACTUAL COSTS A. PROJECT INCOME JUL '92 - JUN '93 JUL '92 - MARCH '93 1. Balance (Reserve) brought forward $515,000. 2. Annual Income via Assessments: 275,000. 743 Single Family Detached 469 Townhouses 2,576 Condominiums/ Rentals 100,000 square feet Commercial 3. Estimated Interest Earnings 20,000. TOTAL ESTIMATED FUNDS: $810,000. B. PROJECTED EXPENSES L General Manager $ 21,000. 6,000.00 2. Engineering Geologist and Geologist Assistant 57,000. 41,042.00 3. Support Services (i.e., office space, office equipment, office staff and vehicles) 0. 0. 4. a) Repair, maintenance and improvements (as per approved Repair, Maintenance and Improvement Program.) 165,000. 104,263.54 b) Construction Administration 26,000. 19,058.27 5. Legal, accounting and insurance 5,000. 0.00 6. Professional Soils and Geotechnical Consulting 15,000. 24,877.75 7. County staff services 7,000. 0.00 8. Assessment documents preparation 10,000. 1,125.00 Total Expenses: $306,000. $196,366.56 Reserve: 504,000. Total Costs: $810,000. W ADATAMPS 1 W ANMCANYOA'LK\FIN3RD.RPT " CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT REPAIR AND IMPROVEMENT PROJECTS 1992-1993 FISCAL YEAR Est. Budget Actual Cost Category (FY'92-'93) (Jul.-Mar.) ----------------------------------------- Slope Stabilization 1. Corrective Grading $ 23,000.00 4,002.04 2. Revegetation 30,000.00 12,266.81 3. Retaining or Pin Walls 10,000.00 0.00 Surface Drainage Improvements 4. Maint. B-58 Drain Syst. 12,000.00 7,020.00 5. Const. B-58 Drain. Syst. 8,000.00 0.00 6. Storm Drain Maintenance 5,000.00 19,954.18 7. Grading ditches/swales 10,000.00 0.00 8. Erosion/Runoff Cont. Devices 10,000.00 14,356.69 Subsurface Drainage 9. Subdrain Insp. and Maint. 7,000.00 2,520.00 10. Horiz. Drain Insp. and Maint. 3,000.00 2,628.00 11. Drilling Horiz. Drains 15,000.00 0.00 Repair of Existing Improvements 12. Insp. and Repair of Drain Struct. 20,000.00 28,573.17 13. Other Construction Projects 12.000.00 12.942.65 TOTAL $ 165,000.00 $ 104,263.54 CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT FINANCIAL REPORT 1992-1993 FISCAL YEAR ESTIMATED BUDGET ACTUAL COSTS A. PROJECT INCOME JUL '92 - JUN '93 JUL '92 - MARCH '93 1. Balance (Reserve) brought forward $515,000. 2. Annual Income via Assessments: 275,000. 743 Single Family Detached 469 Townhouses 2,576 Condominiums/ Rentals 100,000 square feet Commercial 3. Estimated Interest Earnings 20,000. TOTAL ESTIMATED FUNDS: $810,000. B. PROJECTED EXPENSES 1. General Manager $ 21,000. 6,000.00 2. Engineering Geologist and Geologist Assistant 57,000. 41,042.00 3. Support Services (i.e., office space, office equipment, office staff and vehicles) 0. 0. 4. a) Repair, maintenance and improvements (as per approved Repair, Maintenance and Improvement Program.) 165,000. 104,263.54 b) Construction Administration 26,000. 19,058.27 5. Legal, accounting and insurance 5,000. 0.00 6. Professional Soils and Geotechnical Consulting 15,000. 24,877.75 7. County staff services 7,000. 0.00 8. Assessment documents preparation 10.000. 1,125.00 Total Expenses: $306,000. $196,366.56 Reserve: 504,000. Total Costs: $810,000. W 1DATAAh'PS I WANCY\CANY0'r1 K\FLN3RD RPT ' CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT I , REPAIR AND IMPROVEMENT PROJECTS 1992-1993 FISCAL YEAR Est. Budget Actual Cost Category (FY'92-'93) (Jul.-Mar.) ----------------------------------------- Slope Stabilization 1. Corrective Grading $ 23,000.00 4,002.04 2. Revegetation 30,000.00 12,266.81 3. Retaining or Pin Walls 10,000.00 0.00 Surface Drainage Improvements 4. Maint. B-58 Drain Syst. 12,000.00 7,020.00 5. Const. B-58 Drain. Syst. 8,000.00 0.00 6. Storm Drain Maintenance 5,000.00 19,954.18 7. Grading ditches/swales 10,000.00 0.00 8. Erosion/Runoff Cont. Devices 10,000.00 14,356.69 Subsurface Drainage 9. Subdrain Insp. and Maint. 7,000.00 2,520.00 10. Horiz. Drain Insp. and Maint. 3,000.00 2,628.00 11. Drilling Horiz. Drains 15,000.00 0.00 Repair of Existing Improvements 12. Insp. and Repair of Drain Struct. 20,000.00 28,573.17 13. Other Construction Projects 12.000.00 12.942.65 TOTAL $ 165,000.00 $ 104,263.54