PROJECT NAME:STATE ROUTE 4/WILLOW PASS GRADE PROJECT(AT EVORA ROAD)
SPECIFIG REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION
I. Recommended Action:
Accept the Public Works Director's report in response to the letter from Mr. Robert K. McCleary,
Executive Director of the Contra Costa Transportation Authority (CCTA), dated January 8, 1993.
The letter requests measures to correct impacts to Evora Road, at Willow Pass Road, as a result
of the construction of the new interchange at State Route 4 and Willow Pass Road in West
Pittsburg.
II. Financial Impact:
There will be no financial impact to the County General Fund. The cost of the construction
revisions will be funded entirely by CCTA as part of the State Route 4/Willow Pass Grade
Widening and Lowering Project.
III. Reasons for Recommendations and Background:
The State Route 4/Willow Pass Grade Widening and Lowering Project includes the construction
of a new fully accessible partial cloverleaf interchange at Willow Pass Road in West Pittsburg.
As a result of the new interchange, Willow Pass Road will be realigned, and Evora Road will have
to be realigned and regraded to conform to the new construction. The impact to Evora Road
is to raise it by twenty to thirty feet at Willow Pass Road. This directly affects property owners
which live along Evora Road and access their homes by way of Pomo Court.
Continued on Attachment: X SIGNATURE: w A.A.4%,
RECOMMENDATION OF COUNTY ADMINISTRATOR
_ RECOMMENDATION OF BOARD COMMITTEE
APPROVE _ OTHER
SIGNATURE(S):
ACTION OF BOARD ON MAY 2 5 1993 APPROVED AS RECOMMENDED_� OTHER
VOT OF SUPERVISORS
UNANIMOUS (ABSENT
AYES: NOES:
ABSENT: ABSTAIN:
I hereby certify tnat this Is a true and correct copy 01
an action taken and entered on the minutes of the
RVF:pe Board of Super yi Ap o�the,date shown.
c:Evora 25.t5 ATTESTED: ��AA �5 9933
PHIL BATCHELOR.Clerk of the Board
Orig. Div: Public Works (TE) of Supervisors and Co ty Administrator
Contact: Bob Faraone (313-2252)
cc: CCTABy 'Oeputy
(via I'/W1
BOARD REFERRAL - JANUARY 26, 1993 - ITEM 1.68
PROJECT NAME: STATE ROUTE 4/WILLOW PASS GRADE PROJECT (AT EVORA ROAD)
MAY 25, 1993
PAGE TWO
III. Reasons for Recommendations and Background: (Continued)
In order to mitigate the potential concerns of the property owners, CCTA, County and Caltrans
staff have held several meetings with the Pomo Court residents. As a result of these discussions
with the homeowners, several changes to the construction plans have been recommended by
CCTA, and reviewed and approved by County and State staff for inclusion into the current
contract.
The changes include moving Evora Road twenty feet further from the homes, installing a
combination crash barrier and noise wall, replacing landscaping, revising the Evora Road/Willow
Pass Road intersection geometrics and the proposed Evora Road grade. Property on the south
side of Evora Road was acquired to accommodate stage construction and, therefore, allows the
changes.
IV. Consequences of Negative Action:
There are no consequences of negative action.