HomeMy WebLinkAboutMINUTES - 04201993 - 1.3 (2) TO: BOARD OF SUPERVISORS, as the Governing Body of the Contra Costa County Flood
Control and Water Conservation District
FROM: J. MICHAEL WALFORD, CHIEF ENGINEER
DATE: April 20, 1993
SUBJECT: EASEMENT ASSIGNMENT PINOLE CREEK - PINOLE AREA
W.O. 8358
SPECIFIC REQUEST(S)OR RECOMMENDATION(S)& BACKGROUND AND JUSTIFICATION
I. Recommended Action:
A. APPROVE the Consent to Assign to Chevron Pipe Line Company, an oil pipeline
easement conveyed to Standard Oil Company of California by the District, recorded
September 13, 1971, in Book 6475, page 115.
B. AUTHORIZE the Chief Engineer to sign the Consent to Assign on behalf of the District.
II. Financiallmpact:
NONE
III. Reasons for Recommendations and Background:
The original easement requires an assignment upon succession in interest by a third party, that
being Chevron Pipe Line Company.
Continued on Attachment:_ SIGNATURE:. �j
_ RECOMMENDATION OF COUNTY ADMINISTRATOR
_ RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON APR 2-d 1993 APPROVED AS RECOMMENDED V OTHER_
1 hereby certify that this Is a true and correct copy-31
an action taken and entered on the minutes of tree
Board of Superv�p�,or�th� ��
dth_own.
ATTESTED: ��++�� t13 —
VOTE OF SUPERVISORS PHIL BATCHELOR,Clerk of the Board
of Supervisors and Co my Administrator
V/ UNANIMOUS (ABSENT ) -
AYES: NOES: By --'deputy
ABSENT: ABSTAIN:
RHF:Io
c:BO.cpin.t4
Orig. Div: Public Works (RIP)
Contact: Roger Frost (313-2223)
cc: County Administrator
Auditor-Controller (via RIP)
P. W. Accounting
Recorder (via RIP)