Loading...
HomeMy WebLinkAboutMINUTES - 04201993 - 1.28 2_� TO: BOARD OF SUPERVISORS, as the Governing Body of the Contra Costa County Flood Control and Water Conservation District FROM: J. MICHAEL WALFORD, CHIEF ENGINEER DATE: APRIL 20, 1993 SUBJECT: �BELDIN LANE WATER LINE - DRAINAGE AREA 29 H - OAKLEY AREA Project No.: 7569-6D8525 Task: ACQ Account: 3540 SPECIFIC REQUEST(S)O R RECOMMENDATION BA K R UND AND JU TIFI ATI N I. Recommended Action: A. APPROVE Full and Final Release and Indemnity Agreements and Agreements to Convert Water Service from Roy Gene Griffin and Melody Griffin, Paul D. and Debra A. Matheson, and Caroline A. Barnard. B. AUTHORIZE Chief Engineer to execute the Agreements to Convert Water Service on behalf of the District. C. AUTHORIZE the Auditor-Controller to issue checks in the amount of$5,500 made payable to each of the following: Roy Gene Griffin and Melody Griffin, Route 1 Box 2438, Oakley, CA 94561; Paul D. Matheson and Debra A. Matheson, 4900 Beldin Lane, Oakley, CA 94561; and Caroline A. Barnard, 4830 Beldin Lane, Oakley, CA 94561. The checks shall be issued upon notification by the Real Property Division that the terms and conditions of the Agreements have been met. D. Direct the Real Property Division to have above-referenced Agreements recorded in the office of the County Recorder. II. Financial Impact: Payment totalling $16,500 from Drainage Area 29H funds. III. Reasons for Recommendations and Background: Owners of three parcels on Beldin Lane have expressed concern regarding possible contamination of their wells due to groundwater seepage from an adjacent detention basin. The District has determined that the cost of completing a detailed study of the problem would exceed the cost of connecting the potentially affected properties to the Oakley Water District. Continued on Attachment: ,( SIGNATURE:____ _ RECOMMENDATION F COUNTY ADMINISTRATOR _ RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON APR 2 APPROVEDA RECOMMENDED OTHER V07-OF SUPERVISORS UNANIMOUS (ABSENT 1 AYES: NOES: ABSENT: ABSTAIN: NW:glo c:BOc20.t4 I hereby certify that this Is a true and correct copy-�f Orig. Div: Public Works (R/P) an action taken and entered on the minutes of the Contact: Nancy Wenninger (313-2227) Board of Supervisors con the date shown.2 cc: County Administrator ATTESTED: APR 0 1993 PHIL BATCHELOR,Cierh of the Beard Auditor-Controller (via R/P) of Supervisors andC unty Ar`�' ,istrator P. W. Accounting Recorder (via R/P) 3y ,Deputy Beldin Lane Water Line - Oakley Area April 20, 1993 Page Two By its order on July 19, 1988, the Board previously authorized the expenditure of funds for the connections. The above-referenced agreements provide that, upon subdivision of the subject parcels, the owners shall repay the District a portion of the cost incurred in providing water service. The owners also agree to release the District from all further obligations and claims on account of the construction or operation of the detention basin. IV. Consequences of Negative Action: A more costly study of groundwater contamination would have to be conducted.