Loading...
HomeMy WebLinkAboutMINUTES - 03161993 - 1.2 (2) A 1% 20 TO: BOARD OF SUPERVISORS/BOARD. OF DIRECTORS, CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: March 16, 1993 SUBJECT: STATUS AND EXPENSE REPORT FOR THE SECOND QUARTER OF FISCAL YEAR 1992- 93 (ACCUMULATIVE FOR JULY '92 - DEC 92), CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT. SPECIFIC REQUEST($) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION i. Recommended Action: ACCEPT the Canyon Lakes G.H.A.D. Status and Expense Report for the second quarter of Fiscal Year 1992-93. 11. Financial impact: No County General Fund impact. Ill. Reasons for Recommendations and Background: During the second quarter, the District continued repair and maintenance of drainage structures, erosion control landscaping and drainage runoff control devices. We also continued additional studies by our geologic consultants as to the causes of settlement in some areas. As to the status of our budget, the construction costs for the first two quarters ($65,153.93) are approximately 40%of our annual budget, and our total expenses through this year ($124,594.75) were approximately 41% of our total annual budget. IV. Consequences of Negative Action: None Continued on Attachment: SIGNATURE:,z, RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON y3 APPROVED AS RECOMMENDED N OTHER VOTE OF SUPERVISORS _X UNANIMOUS (ABSENT; AYES: NOES: ABSENT:- ABSTAIN: SE:si I hereby certify that this Is a true and correct copy of an action taken and entered on the minutes of the c:B01 6.t3 Board of Supervison the date shown. ATTESTED: —= ZL--1y.9 Contact: Skip Epperly -313-2253 PHIL BATC;hi7Lo R (.IIL;r-h o'-64e Board Orig. Div: Public Works (Admin) of Supervlsorsanri%:-)onty Administrator cc: County Administrator's Office Auditor/Controller By Deputy County Counsel s. A. 20 CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT FINANCIAL REPORT FY '92—'93 Estimated Budget Actual Costs A. Proiected Income (July'92-June'93) (Jul.'92-Dec.'92) 1. Balance brought fwd. $ 515,000.00 2. Annual Income via Ass'ments: 275,000.00 743 Single family Det. 469 Townhomes 2,576 Condo's/Rentals 1000,000 sf. Commercial. 3. Estimated Interest Earnings 20.000.00 TOTAL EST. FUNDS $ 810,000.00 B. Projected Expenses 1. General Manager 21,000.00 4,750.00 2. Engineering Geologist 57,000.00 24,896.00 and Assistant Geologist 3. Support services 0.00 (e.g. : office space, office equip., office staff, vehicles.) 4. Construction a. Repair, maintenance and 165,000.00 65,153.93 improvements (as per appr. repair, maintenance and improvement program) b. Construction Administration 26,000.00 12,645.27 5. Legal, accounting and insurance 5,000.00 6. Professional Soils and Geotech. 15,000.00 16,024.55 Consulting. 7. County staff services 7,000.00 00.00 8. Assessment documents prep. 10.000.00 1,125:00 TOTAL EXPENSES $ 306,000.00 124,594.75 Reserve 504,000.00 TOTAL BUDGET $ 810,000.00 CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT REPAIR AND IMPROVEMENT PROJECTS 1992-1993 FISCAL YEAR Est. Budget Actual Cost % Budget Category (FY'92=93) (Jul.-Dec.) consumed ---------------------------------------------------- Slope Stabilization 1. Corrective Grading $ 23,000.00 0.00 0 2. Revegetation 30,000.00 9,853.07 32 3. Retaining or Pin Walls 10,000.00 0.00 0 Surface Drainage Improvements 4. Maint. B-58 Drain Syst. 12,000.00 520.00 5 5. Const. B-58 Drain..Syst. 8,000.00 0.00 0 6. Storm Drain Maintenance 5,000.00 0.00 0 7. Grading ditches/swales 101000.00 0.00 0 8. Erosion/Runoff Cont. Devices 10,000.00 14,356.69 144 Subsurface Drainage 9. Subdrain Insp. and Maint. 7,000.00 2,400.00 35 10. Horiz. Drain Insp. and Maint. 3,000.00 0.00 0 11. Drilling Horiz. Drains 15,000.00 0.00 0 Repair of Existing Improvements 12. Insp. and Repair of Drain Struct. 20,000.00 28,413.17 142 13. Other Construction Projects 12.000.00 9.611.00 80 TOTAL $ 165,000.00 $ 65,153.93 40