HomeMy WebLinkAboutMINUTES - 02091993 - H.6 SE Z
Contra
TO: BOARD OF SUPERVISORS n;'�/'f roSta
FROM: HARVEY E. BRAGDON Cou1t
DIRECTOR OF COMMUNITY DEVELOPMENT °
DATE: February 9, 1993
SUBJECT: Hearing on Rezoning Application #2951-RZ and companion applications
#3010-91 and Subdivision 7657 to rezone 59± acres of land from Planned
Unit Development (P-1) for 145 lots with a park and detention basin to
Planned Unit Development (P-1) for 220 lots and a park and detention
basin. . subject property is located south of Laurel Road, Mast of Brown
Road and north of Carpenter Road, , in the Oakley area. Application
filed by Bellecci 6 Associates and Camray Development 6 Construction.
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) BACKGROUND AND JUSTIFICATION
RECOMMENDATIONS
1. Accept the environmental documentation prepared for this
project as being adequate.
2. Approve Rezoning Application #2951-RZ, Development Plan 3010--
91
010-91 and Subdivision 7657 as recommended by the East County
Regional Planning Commission with two additional conditions
shown in the background section and previously required by the
Board for developments.
3. Adopt the East County Regional Planning Commission's findings
as set for in Resolution #79-1992 as the determination for
these actions.
4. Introduce the ordinance giving effect to the aforesaid
rezoning, waive reading and set forth date for adoption of
same.
FISCAL IMPACT
None
BACKGROUND/REASONS FOR RECOMMENDATION
This item was heard by the 'East County Regional Planning Commission
on November 16, 1992, at which time the Commission recommended
approval of the rezoning request, final development plan and
subdivision. The rezoning conforms to the General Plan.
This project is a result of the change in designation of the site
from Single Family Residential, Low Density-Interim Agriculture to
Single Family Residential Medium Density of the 1990 County General
Plan. Since the project is a request to increase the original
approval of 145 lots to 220 lots a Traffic Impact Study was
required per Measure C (1988) . The report was done for this
project as well as five (5) other pending residential developments
of more than 100 lots in the Oakley area. The Traffic Impact
Report was submitted in June 1992. The report was reviewed by
staff and found acceptable. The Developer agrees with the
mitigation measures listed in the traffic report and to do their
fair share of improvements except for the improvement of the rather
distant Vasco Road-Marsh Creek Road intersection and the State
Route A-Lone Tree intersection which is in the City of Brentwood by
Prior agreement with the County is the responsibility of the City
of Brentwood. On this basis a Negative Declaration of
Environmental Significance was posted.
On November 16, 1992, the East County Regional Planning Commission,
after taking testimony, recommended that the Board of Supervisors
approve this project for 220 lots with a 3. 0 acre park and a 4. 1
acre detention basin area subject to the Conditions of Approval
(Exhibit A) and findings attached.
Staff also recommends that the following conditions be added to the
Conditions of Approval: i
23. Pursuant to Government Code Section 6647.9, the applicant
(including the subdivide or any agent thereof) shall defend,
indemnify, and hold harmless the Contra Costa County Community
Development Department and its agents, officers, and employees
from any claim, action, or proceeding against the Department
(the County) or its agents, officers, or employees to attack,
set aside, void, or annul, the Department's approval
concerning this subdivision (for SUB 7657 and D.P. 3010-91)
map application, which action is brought within the time
period provided for in Section 66499.37. The County will
promptly notify the subdivider of any such claim, action, or
proceeding and cooperate fully in the defense.
23. The garage area of each residence shall be wired for electric
car recharging subject to the review and approval of the
Zoning Administrator subject to adoption of final Board
policy.
CONTINUED ON ATTACHMENT: B YES SIGNATURE
.4
RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMM ON 0111PARD COMMITTEE
APPROVE OTHER
SIGNATURE(S) :
ACTION OF BOARD ON February 9 . 1993 APPROVED AS RECOMMENDED X_ OTHER
This is the time heretofore noticed by the Clerk of the Board of
Supervisors for hearing on the recommendation of the East County
Regional Planning Commission on the request by Bellecci and Associates
(applicants) and Camray Development and Construction (owners) for
approval to rezone 59 acres of land from Planned Unit District (P-1)
for 145 lots and single family residences, a 3 acre park and a 4. 1
acre detention basin to Planned Unit District (P-1) for 220 lots and
single family residences, a 3 acre park and a 4. 1 acre detention basin
( 2951-RZ) ; for approval of a final development plan (County File
#3010-91) to construct 220 single family homes; and for approval of a
vesting tentative map to divide 59 acres into 220 single family lots
with a 3 acre park area and a 4.1 acre detention basin (Subdivision
7657) in the Oakley area.
Dennis Barry, Community Development Department, presented the
staff report on the proposed project and described the site location.
Mr. Barry commented on the East County Regional Planning Commission' s
recommendation for approval and the staff recommendation for approval
with the addition of two conditions on indemnification and electric
car recharging.
Mitch Avalon, Public Works Department, presented revised wording
for Condition 22V on page 11 of the conditions.
Mr. Barry concurred with the revised condition and commented on
an inaccuracy in the findings map.
The public hearing was opened and the following person appeared
to speak:
Frank Bellecci, Bellecci and Associates, applicant, expressed
agreement with the conditions of approval.
Supervisor Bishop requested clarification in -the increase in the
number of units requested and traffic mitigation. !
1 .
Mr. Bellecci commented on the history of the request and the
comprehensive traffic report that had been done.
The public hearing was closed.
Supervisor Torlakson moved approval of the request.
IT IS BY THE BOARD ORDERED that recommendations 1, 2 with amended
conditions (Exhibit A attached) , 3 , and 4 are APPROVED; and Ordinance
No. 93-18 is INTRODUCED, reading waived, and February 23 , 1992 is set
for adoption of same.
VOTE OF SUPERVISORS
I HEREBY CERTIFY THAT .THIS IS A
X UNANIMOUS (ABSENT TRUE AND CORRECT COPY OF AN
AYES: NOES: ACTION TAKEN AND ENTERED ON THE
ABSENT: ABSTAIN: ' MINUTES OF THE BOARD OF
SUPERVISORS ON THE DATE SHOWN.
Contact: Art Beresford 646-2031 ATTESTED February 9 , 1993
be: Community Development Department PHIL BATCHELOR, CLERK OF
Bellecci & Associates THE BOARD OF SUPERVISORS
Public Works: Attn: Mitch AvalonCO Y a ADMINISTRATOR
Camray Development & Construction
Oakley Fire Protection Dist. BY , DEPUTY
AB:df County Counsel
Assessor
1
I
I
I
I
I
I
I
(
RESOLUTION NO. 79 - 1992
RESOLUTION OF THE EAST COUNTY REGIONAL PLANNING COMMISSION OF THE
COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA, INCORPORATING FINDINGS
AND RECOMMENDATIONS-ON THE REQUESTED CHANGE BY BELLECCI &
ASSOCIATES (APPLICANT) - CAMRAY DEVELOPMENT i CONSTRUCTION (OWNER) ,
(2951-RZ, 3010-91 i Subdivision 7657) , IN THE ORDINANCE CODE
SECTION PERTAINING TO THE PRECISE ZONING FOR THE OAKLEY AREA OF
SAID COUNTY.
WHEREAS, a request by Bellecci & Associates (Applicant) -
Camray Development & Construction (Owner) (2951-RZ) to rezone land ,
in the Oakley area from Planned Unit District for 145 lots (P-1) to
Planned Unit District for 220 lots (P-1) , along with Final
Development Plan 3010-91 and Subdivision 7657, was received on
April 25, 1991; and
WHEREAS, in connection with applicant's requests, an Initial
Study of Environmental Significance was prepared by the Community
Development Department which determined that the requested
entitlements would not have any significant adverse environmental
impacts; and.
WHEREAS, for purposes of compliance with provisions of the
California Environmental Quality Act and State and County CEQA
guidelines, a Negative Declaration of Environmental Significance.
was prepared, posted and circulated; and
WHEREAS, after. notice was-lawfully given, a public hearing was
scheduled, before the East County Regional Planning Commission on
Monday, November 16, 1992; whereat all persons interested might
appear -and be heard; and
WHEREAS, on Monday, Monday, November 16,' 1992, the East County
Regional_Planning Commission having fully reviewed, considered and
evaluated all the testimony and evidence submitted in this matter;
and
NOW, THEREFORE, BE IT RESOLVED that East County Regional
Planning Commission recommends to the Board of Supervisors of the
County of Contra Costa, State of California, that the rezoning
request of Bellecci & Associates (Applicant) and Camray Development
& Construction (Owner) (2951-RZ) be approved for change from
Planned Unit District for 145 lots (P-1) to Planned Unit District
for 220 lots (P-1) , along with Final Development Plan 3010-91 and
Subdivision 7657, and that this zoning change be made as indicated
on the findings map entitled: Page H-24 & H-25 of the County's 1978
Zoning Map.
BE IT FURTHER RESOLVED that the reasons for this
recommendation are as follows:
1. The project is consistent with the County General Plan.
Page Two RESOLUTION NO. 79 - 1992
2. The project will provide needed entry level housing for
the area.
3. The applicant's have indicated that they intend to
commence construction within two and one-half years of the
effective date of final project approval.
4. The project will constitute a residential environment of
sustained desirability and stability, and will be in harmony with
the character of the nearby community.
BE IT FURTHER RESOLVED that the Secretary of the East County
Regional Planning Commission shall respectively sign and attest the
certified copy of this resolution and deliver the same to the Board
of Supervisors all in accordance with the Planning Laws of the
State of California.
The instructions by the East County Regional Planning
Commission to prepare this resolution were given by motion of the
East County Regional Planning Commission on Monday, November 16,
1992, by the following vote:
AYES: Commissioners - Planchon, Hanson, Hern, Maybee,
Sobalvarro, Wetzel
NOES: Commissioners - None
ABSENT: Commissioners - Andrieu
ABSTAIN: Commissioners - None
I, Chair of the East County Regional Planning Commission of
the County of Contra Costa, State of California, hereby certify
that the foregoing was duly called and held in accordance with the
law on Monday, January 11, 1993, and this resolution was duly and
regularly passed and adopted by the following vote of the
Commission:
AYES: Commissioners - Wetzel, Hanson, Andrieu, Maybee,
Planchon, Sobalvarro, Hern
NOES: Commissioners - None
ABSENT: Commissioners - None
ABSTAIN: Commissioners - None
Page Three RESOLUTION NO. 79 - 1992
Chair of the East County Regional
Planning Commission, County of Contra
Costa, State of California
ATTEST:
ASecretary the East County Regional
mission, County of Contra
Costa, State of California
AB/df
2951-RZ.res
_ i
Findings Map
CONTRA COSTA CANAL
UR L RD
11
a!
' I
4
is
�2
1 I
P•1
Rezone FromP- LTO _ '� 1� - _Area
i, EASZt-VJ r- '7 aL. ,Chairman of the East County
Regional Planning Commission,Contra Costa County,State of California,
do hereby certify that this is a true and correct copy of ' $ �
wA-ie
indicating thereon the decision of the East County Regional Planning
Commission in the matter oft-�-F�
Chairman of the East unty Regional
Planning Commission,State of California
ATTE
eRegional
e ry o e East County
Ming Cam ission,State of California
j
CONDITIONS OF APPROVAL FOR FINAL DEVELOPMENT PLAN 3010-91 AND SUBDIVISION
7657 - AS APPROVED BY THE BOARD OF SUPERVISORS ON FEBRUARY 9. 1993
i
1. This approval is based upon the exhibits received by the Community Development
Department listed'as follows:
A. Exhibit A-Final development plan and tentative subdivision map dated received
April 25, 1991 for 220 lots and single family residences, a 3 acre park area and
a 4.1 acre drainage basin area all within a 59 t acre site together with a
preliminary grading plan for this site on the same sheet.
B. Exhibit B- Revised plan dateO received November 9, 1992 showing relocation
of park area and reorienting of "C" and "D" Courts.
2. The approval of Final Development Pian 3010-91 shall run concurrently with a time
limits of SUB 7657. Approval is for a three year period which may be extended for an
additional three year period with request prior to this approval lapsing. Development
may be done in phases subject to the review and approval of the Zoning Administrator.
3. Any revision of internal circulation plan and lot layouts shall be subjectte�the review
and approval of the Zoning Administrator. The 3 acre parcel for the site for the park
shall be moved to the northeast corner of the site and combined with the 1.67 acre
park land from SUB 7630 and the drainage basin generally as shown on the revised
plan submitted November 9, 1992. ,
4. The guide for development and use provision shall be the single family residential
district R-10:
A. Setback for residential units shall be varied between 20 and 25 feet. Frontyard
setbacks may be reduced to 15 feet for covered porches. Sideyard minimum
shall be 5 feet with a total aggregate sideyard of 15 feet. For covered porches,
sideyard minimum shall be 5 feet with a total aggregate sideyard of 10 feet.
- Lots that front on cul-de-sacs or corners may have sideyard minimums of 5 feet
with an aggregate of 10 feet. Lots that front on cul-de-sacs or corners may
have sideyard minimums of 5 feet with an aggregate of 10 feet. Covered
porches in these situations may have sideyard minimum of 5 feet with an
aggregate sideyard of 10 feet. Rearyards for residences shall be a minimum of
15 feet. The R-10 zoning district shall be used as a guide for heights and/or lot
coverage and use of any detached sheds or garages on the site or any other
uses of the site.
_ I
5. Should archaeological materials be uncovered during grading,trenching or other on-site
excavation(s), earthwork within 30 yards of these materials shall be stopped until a
professional archaeologist who is certified by the Society for California Archaeology
(SCA) and/or the Society of Professional Archaeology (SOPA) has had an opportunity
to evaluate the significance of the find and suggest appropriate mitigation(s), if deemed
necessary.
i
2.
6. Sewage disposal serving the property concern in this application shall be provided by
the Ironhouse Sanitary District. Prior to recording the final map a will serve Qter from
the Ironhouse Sanitary'District shall be submitted.
7. Water supply serving the property concern with this development shall be by the
Oakley Water District. Prior to recording the final map a will service letter from the
Oakley Water District shall be submitted. _.
8. Street name shall be acceptable to the Community Development Department and to
the Oakley Fire Protection District,Proposed street names shall be submitted to the
Graphic Section of the Community Development Department at least 30.days prior to
recording the final map.
9. At least 30 days prior to recording the final map for this site,the applicant shall submit
a landscape plan conforming to the County's Water Conservation policies and to the
Oakley Landscape Guidelines.
A. Native, drought tolerant plants shall be used whenever feasible.
B. Landscaping along all streets, setbacks and each frontyards shall conform to
the County Landscape Guidelines. A typical frontyard landscaping plan shall be
submitted for the review and approval of the Zoning Administrator and shall be
implemented prior to occupancy of the various residences on the site.
C. Submit a street tree planting plan. A minimum of two 15-gallon street trees for
each lot shall be planted accept the corner lots shall have at least four street
trees.
D. Fencing design and location shall be shown on the plans. A suitable masonry
wall shall be erected along the site's residential frontage on Laurel Road. This.
wall design shall be subject to the review and approval of the Zoning Adminis-
trator. The sound wall shall conform to acoustical requirements to lower noise
levels from Laurel Road. The Laurel Road frontage of the site can be mounted
to reduce overall heights of the sound wall. The masonry wall design shall be
reviewed and OMAC and their comments submitted to the Zoning Administrator
prior to the Zoning Administrator's review and approval of the wall plan.
E. A landscape and wall/fence plan shall be submitted to the site's frontage along
Carpenter Road. The landscaping and suitable wall/fence shall be constructed
and installed prior to the issuance of building permits on phase of the project
fronting on Carpenter Road.
F. All landscaping shall be maintained by the applicant until occupancy, or in the
case of common areas and street frontage areas until annexation into a
landscape and lighting-district. The applicant will be requried to annex when j
the district is formed. Future homeowners shall be notified by deed notice of
the fact that the site is within a landscape and lighting district and/or park
district.
. . f
3.
G. The westerly and easterly sides of the project that do not front upon streets
shall be fenced with a suitable 6-foot tall solid wood fence with cement
' palisters or. other measures designed to hold the fence-up in the sandy soil.
The portion of the property that is located in the area of the proposed detention
basin shall be fenced with a suitable 6-foot tall cyclone fence or some other
fence acceptable to the County Flood Control District. This fencing shall be
installed prior to the issuance of building permits on this development. The
park area shall be sloped to-drain toward the detention basin and shall at a
minimum be planted with annual grasses and California wildflower mix. The
Laurel Road frontage of theopark shall be suitability fenced and, if acceptable,
mounded.
H. Grading plan shall include an erosion protection on all slopes of five feet or
more in height and a gradient steeper 10:1. Protection shall be equal to or
better than hydroseeding with mulch. Hydroseeding shall be recommended by
a certified landscape architect. If agreeable to the neighboring property
owners, the fill slope shall be moved to the property line behind the lots that
front along proposed "N" Street. .•� -- - ---
10. The owner of the property shall participate in the provision of funding to maintain and
augment police services by voting to approve a special tax for the parcels created by
this subdivision approval. The tax shall be the per parcel annual amount (with
appropriate future CPI adjustment),then established at the time of voting by the Board
of Supervisors. The election to provide for the tax shall be completed prior to the filing
of the final map. The property owner shall be responsible for paying the cost of
holding the election, payable at the time that the election is requested by the owner.
11. The following statement shall be recorded at the County Recorder's Office for each
parcel to notify future owners of the parcels that they own property in an agricultural
area:
"This document shall serve as notification that you have
purchased land in an agricultural area where you may regularly
find farm equipment using local roads; farm equipment causing
dust; crop dusting and spraying occurring regularly; burning
associated with agricultural activities;noise associated with farm
equipment and aerial crop dusting and .certain animals and flies
may exist on surrounding properties. This statement is, again,
notification that this is part of the agricultural way of life in the
open space areas of Contra Costa County and you should be
fully aware of this at the time of purchase."
12. Provide for child care facility and in conformance with Chapter 82-22, "Child Care
Facilities", of the County Code. This shall be accomplished prior to recording the final
map for this project.
13. Prior to the issuance of building permits, the.I applicant shall submit a detailed
transportation demand management (TDM) plan for review and approval of the Zoning
4.
Administrator (unless otherwise requried by a TDM Ordinance). The approved TDM
plan 6hall be operative prior to final inspection by the Building Inspection Department
of residences within this site.
14. Comply with the following construction, noise, dust and litter control requirements:
A. Noise generating construction activities, including such things as power
generators, shall be limited to the hours of 7:30 A.M. to 5:00 P.M., Monday
through Friday, and shall be prohibited on State and Federal holidays. The
restrictions on allowed working days may be modified on prior written approval
by the Zoning Administrator.
B. The project sponsor shall require their contractors and subcontractors to fit all
internal combustion engines with mufflers which are in good condition and shall
locate stationary noise-generating equipment such as air compressors and
concrete pumpers as far away from existing residences as possible.
C. At least one week prior to commencement of grading;-the applicant shall post
the site and mail to the owners of property within 300 feet of the exterior
boundary of the project site notice that construction work will commence. The
notice shall include a list of contact persons with name, title, phone number
and area of responsibility. The person responsible for maintaining the list shall
be included. The list shall be kept current at all times and shall consist of
persons with authority to indicate and implement corrective action in their area
of responsibility. The names of the individual responsible for noise and litter
control shall be expressly identified in the notice. The notice shall be reissued
with each phase of major grading activity.
A copy of the notice shall be concurrently transmitted to the community
Development Department. The notice shall be accompanied by a list of the
names and addresses of the property owners noticed, and a map identifying the
area noticed.
D. A dust and litter control program shall be submitted for the review and approval
of the Zoning Administrator. Any violation of the approved program or
applicable ordinances shall require an immediate work stoppage. Construction
work shall not be allowed to resume until, if necessary, an appropriate
construction bond has been posted.
j
E. The applicant shall make a good-faith effort to avoid interference with existing
neighborhood traffic flows. Prior to issuance of building permits,the proposed
roads serving this development shall be constructed to provide access to each
lot. This shall include provision.for an on-site area in which to park earth
moving equipment.
15. Where a lot/parcel is located within 300 feet of a high voltage electric transmission
line, the applicant shall record the following notice:
5.
"The subject property is located near a high voltage electric
transmission line. Purchasers should be aware that there is
ongoing research on possible potential adverse health effects
caused by the exposure to a .magnetic field generated by high
voltage lines. Although much more research is needed before
the question of whether magnetic fields actually cause adverse
health effects can be resolved, the basis for such an hypothesis
is established. At this time no risk assessment has been made."
When a Final Subdivision Public Report issued by the California Department of Real
Estate is required, the applicant shall also request that the Department of Real Estate
insert the above note in the report.
16. In the event that this project, SUB 7657 and D.P. 3010-91, is restricted by declaration
of covenants, conditions and restrictions (CC & Rs), they must be received prior to
approval of the final map. These CC & Rs shall meet applicable regulations of the
California State Real Estate Commission and provide for architectural maintenance
community to administer and enforce them (the applicant v4U be.requimd-to deposit
with said committee funds to be used for enforcement of the CC & Rs).
17. At least 45 days prior to recording a Final Map, issuance of a grading permit , or
installation of improvements or utilities, submit a preliminary geology, soil, and
foundation report meeting the requirements of Subdivision Ordinance Section 94-4.420
for review and approval of the Zoning Administrator. Improvement, grading, and
building plans shall carry out the recommendations of the approved report.
18. Record a statement to run with deeds to the property acknowledging the approved
soils report by title,author (firm), and date,calling attention to approved recommenda-
tions, and noting that the report is available from the seller.
19. Comply with the requirements of the Contra Costa Water District in regards to the
irrigation lateral that crosses the site. Prior to recording the final map for this
development or issuance of grading permits, the applicant shall submit a letter from
the Water District indicating that an agreement has been reached in this area.
20. Prior to recording the final map for this site, the 1.67 acre property within the J.
Patrick Land Development to the west of the site shall be transferred to this site. A
revised tentative map submitted for the review and approval of the Zoning Administra-
tor. The 3 acre park area together with 1.67 acre park dedicated, by the J. Patrick
Land Development (SUB 7630)shall be moved to the area to the west of the proposed
4.1 acre detention basin along Laurel Road.
i
21. Prior to recording the final map for this subdivision or any phase of this subdivision,
the applicant shall submit will serve letters from the Oakley School District and the
Liberty Union High School District. i
i
I
' t
6.
22. The following requirements pertaining to drainage, road, and utility improvements will
.required the review and approval of the Public Works Department:
A. In accordance with Section 92-2.006 of the County Ordinance Code, this
subdivision shall conform to the provisions of the County Subdivision Ordinance
(Title 9). Any exceptions therefrom must be specifically listed in this
conditional approval statement. Conformance with the Ordinance includes the
following requirements:
1) Constructing road improvements along the frontage of Laurel Road,
Brown Road and Carpenter Road, including the detention basin site on
the corner of Laurel Road and Brown Road.
Construct road improvements as shown on the Vesting Tentative Map
with the following modifications and additions:
The sidewalk along Laurel Road shall be six feet wide.
The sidewalk along Carpenter Road shall be six feet six inches
(width measures from curb face).
The improvements shall also include landscaping and irrigation
along Laurel Road as well as all necessary longitudinal and
transverse drainage and conforms along all three roads.
All pavement shall be a minimum of 28 feet in width.
The Laurel Road improvements (33-feet wide pavement and one-half
width landscaped median) shall be constructed on the north side of the
right of way and the southerly half of the right of way shall be graded,
drained and landscaped (with drought tolerant native ground cover) all
to ultimate line and grade. Construction of frontage (on the south side
only) improvements including but not limited to a soundwall border
landscaping with automatic irrigation system, six foot meandering
sidewalk,street lights,drainage improvements and curb and gutter. The
Laurel Road improvements shall include landscaping and irrigation of the
median and parkway areas. In lieu of construction of the median island,
complete with surface treatment (landscaping, etc.), the applicant can
contribute an equivalent contribution to a Road Improvement Fee Trust
(819200-0800), to be used to construct these improvements at a later
time. The curb and gutter shall be installed 15 feet from the right of
way line. All improvements shall be subject to the review of the Public
Works Department, Road Engineering Division, and the review and
approval of the Zoning Administrator. All Laurel Road improvement shall
be designed for 55 mph, all Carpenter Road improvements shall be
designed to 45 mph and all Brown Road improvements shall be designed
to 40 mph.
I
i
i
1
7.
Of the 33 feet wide pavement on the north side of Laurel Road, the
developer is responsible for 20 feet and the AOB 13 feet. 1 ubdivisions
6971 and 7489 have beencondiUoned to construct improvements along
their frontages -on the north side of Laurel Road. If the frontage
improvements of these two subdivisions have been completed or
bonded prior to the filing of the final map for this subdivision, the
applicant shall construct their share of improvements (20 feet of
pavement and half median) at another location along Laurel Road
(subject to the review and approval of the Public Works Department, or
contribute an equivalent contribution to Road Improvement Fee Trust
(819200-0800) to construct other improvements to Laurel Road. The
contribution shall include 10 percent for design engineering and 12.5
percent for construction engineering.
The above contribution amounts may be determined using the current
unit construction bond costs in the Engineering Services Division. The
cost estimate for landscaping shall be based on the industry standard for
work on similar roads.
2) Installing street light and annexing the property to County Service Area
L-100 for maintenance of the street lights. The final number and
location of the lights shall be determined by the County Traffic Engineer.
3) Undergrounding of all utility distribution facilities, including the existing,
utilities along the Laurel Road, Brown Road and Carpenter Road
frontages..
4) Conveying all storm waters entering or originating within the subject
property, without diversion and within an adequate drainage facility, to
a natural watercourse having definable bed and banks or to an existing
adequate storm drainage facility which conveys the storm waters to a
natural watercourse.
In order to satisfy the "collect and convey" requirement the developer
should be requried to construct a portion of Line A, a portion of Line A-
1, all of Line A-2, and outlet structure of the Drainage Area 30A plan.
Also, the proposed storm drain shown on the vesting tentative map
running along the south side of Laurel Road should drain into the basin.
Designing and constructing storm drainage facilities required by the
Ordinance in compliance with specifications outlined in Division 914 of
the Ordinance and in compliance with design standards of the Public
Works Department.
Installing, within a dedicated drainage easement, any portion of the
drainage system which conveys run-off from public streets.
i
. . i
8.
5) Submitting improvement plans prepared by a registered civil engineer,
payment of review and inspection fees, and security for allimprove-
ments requried by the Ordinance-Code-or the conditions of approval for
this subdivision. These plans shall include any necessary traffic signage
and striping plans for review by the County Traffic Engineer.
6) Submitting a Final Map prepared by a registered civil engineer or
licensed land surveyor.
B. Convey to the County, by Otf er of Dedication, additional right of way on Laurel
Road as required for the planned future width of 110 feet and observe a
building setback from the widened Laurel Road right of way as described in
condition.of approval 22.P.
C. Convey to the County, by Offer of Dedication, additional right of way on
Carpenter Road as requried for the planned future width of 60 feet. Convey
to the County, by Offer of Dedication, additional right of way on Brown Road
as requried for the planned future half width of 40 feet.
D. This project lies within the 60db noise contour of the County General Plan.
Construct a masonry soundwall along Laurel Road (excluding the detention
basin area) subject to the review and approval of the Zoning Administrator.
E. Relinquish abutter's rights of access along Laurel Road, Brown Road and
Carpenter Road with the exception of the one entrance road along each
frontage.
F. Construct the on-site road system to County public road standards and convey
to the County, by Offer of Dedication, the corresponding right of way. The
minimum road width for partial roads will be 28 feet. On all public roads with
longitudinal slopes fess.than five percent, all public pedestrian access ways
shall be designed in accordance with Title 24 (Handicap Access). This shall
include all driveway depressions as well as handicap ramps.
G. "A" Street between Laurel Road and "E" and "D" Court shall be a minimum 48
foot road within a 68 foot right of way to provide for a 20 foot in bound lane
and a 28 foot out bound lane. "A" Street between "E" and "D" Court and "B"
Street shall be a minimum 40 foot roadway within a 60 foot right of way.
H. The applicant shall construct necessary pavement widening, signing and
i
striping to provide for left turn channelization from Laurel Road into this project, i
all at its ultimate location.
I. Prevent storm drainage, originating on the property and conveyed in a
concentrated manner, from draining across the sidewalks and driveways.
J. Submit a sketch plan to the Public Works Department, Road Engineering
Division, for review showing all public road improvements prior to starting work
9.
on tlhe improvement plans. The sketch alignment plan shall be to scale and
show proposed and future curb lines, lane striping' details and lighting.. The
sketch alignment plan shall also include adequate information to show that
adequate sight distance has been provided.
K. Install permanent landscaping and automatic irrigation facilities within. the
parkway and median areas, and install interim landscaping features within the
future road areas, if any. All work shall be done. in accordance with the
guidelines and standards of the County. Funding of, and maintenance of, the
new plantings shall be guarVteed by the developer until the expiration of the
plant establishment period and, until funds are available through a landscaping
district. Bonding for landscaping shall be based on the industry standard for
work on similar roads.
L. Apply to the Public Works Department for annexation to the County Landscap-
ing District AD 1979-3 (LL-2) for the future maintenance of landscaping and
irrigation facilities in median islands, parkways and other areas ("open space"
is specifically excluded). New owners shall be notified,by deed notification that
the subject property is within a lighting and landscaping district.
M. Submit landscaping plans to the Public Works Department and pay the plan
review and field inspection fees. All landscaping and irrigation facilities shall
be maintained by the applicant until funds become available for their mainte-
nance by the County after final inspection if cleared.
N. Furnish proof to the Public Works Department, Engineering Services Division,
of the acquisition of all necessary rights of entry and/or easements for the
construction of off-site, temporary or permanent, road and drainage improve-
ments.
O. Provide deed notification and signing to inform prospective property owners
that "F". "B", "M", and "J" Streets may be extended in the future.
P. Extend frontage improvements along the full Laurel Road frontage of this
property and extending to Brown Avenue without a break. The improvements
shall include the off-site area noted on the Vesting Tentative Map as Detention
Basin. The Laurel Road improvements shall include landscaping and irrigation
of the median and parkway areas. The full 110-foot right of way shall be taken
from this side of the Contra Costa Canal right of way. In the vicinity of the
Contra Costa Canal right of way the applicant shall observe an additional 16-
foot structure setback. An additional 8-foot structure setback shall be observed
where additional right of way may be obtained from the property to the north.
Q. Extend frontage improvements along the Brown Avenue frontage of this
property along the area noted as detention basin and park. Brown Avenue shall
include a graded, separated 10-foot equestrian/pedestrian trail along the east
side of the road (subject to the review and approval of the Zoning Administra-
v
10.
tor). They applicant shall dedicate a 40-foot half width for the future 70-foot
right of way (30-foot on the east side).
R. Carpenter Road shall be reconstructed due to inadequate alignment. The
improvements shall be subject to the review of the Public Works Department,
Road Engineering Division, and the review and approval of the Zoning
Administrator. The Carpenter Road improvements shall extend across the area
designated as park site. -
S. Apply. to the Public Works, Department for annexation of the property to
Drainage Area 300 for the maintenance and operation of the drainage area
facilities.
T. Certain road or drainage area improvements required may be eligible for credit
or reimbursement against Area of Benefit or drainage area fees, such as
required pavement width in excess of 20 feet, and drainage area lines. The
developer shall contact the Public Works Department, Road Engineering
Division, for road improvements, or-the Flood Control-Bistrict for-dninage area
improvements, to determine the extent of any credit or reimbursement for
which the applicant might be eligible. Prior to constructing any public
improvements, or filing of the final map, the applicant shall execute a
credit/reimbursement agreement with the County. No credit or reimbursement
will be made for any improvements installed prior to execution of the cre-
dit/reimbursement agreement.
U. Prior to filing the final map, contribute this developments fair share towards the
improvements in the Oakley area that are identified on page 13 in the June 19,
1992 Traffic Impact Study by DKS Associates as needing additional mitigation.
The applicants share of these improvements shall be based on the number of
approved units in this development divided by the anticipated number
of approved units within the Oakley/N. Brentwood AOB boundary between now
and the year 2000. This condition of approval will be satisfied if the Oakley/N.
Brentwood AOB is updated to include the improvements referenced above.
V. Contribute one half of the cost to construct improvements along Empire Avenue
from the northerly property line of Subdivision 7630 north to Laurel Road.
These improvements shall consist of paving Empire Avenue to a minimum of
28-foot width at the ultimate line and grade.
Subdivision 7630 has also been conditioned to construct these road improve-
ments. Any Area of Benefit credit/reimbursement for this work would be split
equally between this project and Subdivision 7630.
i
Prior to filing the final map for phase two, contribute one half of the completed
improvement costs on this portion of Empire Avenue incurred by the developer
of Subdivision 7630. If these improvements on Empire Avenue have not been
completed by the developer of 7630 prior to the filing of the map for the
I
11.
second phase of subdivision 7657, then the applicant shall submit a cash
deposit equal to one half of the engineer's estimate for the work.
ADVISORY NOTES
A. The applicant/owner shall be aware of these reviewing requirements prior to requesting
the recording of the final map and/or requesting building and grading permits.
B. Applicant shall comply with the Park Dedication Fee Ordinance.
C. Comply with the requirements of the lronhouse Sanitary District,-including annexation
to that district.
D. Comply with the requirements of the Oakley Water District, including annexation to
that district.
E. Comply with the requirements of the Oakley Fire Protection District as outlined in their
letter dated June 3, 1991 . ._
F. Comply with the requirements of the Building Inspection Department. This may
include the submittal of.additional soils data regarding the foundation designs of the
various residences within this site.
G. The project lies within the 100-year flood boundary as designated on the Federal
Emergency Agency Flood Rate Maps. The applicant should be aware of the
requirements of the Federal Flood Insurance Program and the County Flood Plain
Management Ordinance (Ordinance No. 87-65) as they pertain to future construction
of any structures on this property.
H. The applicant is advised that the tax of the police services district is currently set by
the Board of Supervisors at $200 per parcel annually (with appropriate future
Consumer Price Index (CPI) adjustments). The annual fee is subject to modification
by the Board of Supervisors in the future. The current fee for holding the election is
$800 and is also subject to modifications in the future. The applicable tax and fee
amounts shall be those established by the Board of Supervisors at the time of voting.
I. The applicant will be required to comply with the drainage fee requirements for
Drainage Area 30A as adopted by the Board of Supervisors.
Certain improvements required by the Conditions of Approval for this development or
the County Subdivision Ordinance Code may be eligible for credit or reimbursement
against said fee. The developer should contact the Public Works Department to
personally determine the extent of any credit or reimbursement for which he might be
eligible.
J. The applicant will be requried to comply with the requirements of the
Bridge/Thoroughfare Fee Ordinance for the Oakley Area of Benefit as adopted by the
Board of Supervisors.
12.
Certain improvements required by the Conditions of approval for this development or
the county Subdivision Ordinance Code may be eligible for credit or reimbursement
against said fee. The developer should contact the Public Works Department to
personally determine the extent of any credit or reimbursement for which he might be
eligible.
K. This project is subject to the development fees in effect under County Ordinance as
of May 25, 1991, the date of the vesting tentative map application was accepted as
complete by the Community Development Department. These fees are in addition to
any other development fees which may be specified in the conditions of approval.
AB/aa
SUBX/7657C.AB
11/10/92
11/1 6/92-EC(a)
12/14/92
2/23/93 (c)
i
REZONING APPLICATION #2951-RZ
FINAL DEVELOPMENT PLAN 3010-1
SUBDIVISION 7657
P-1 TO P-1
BELLECCI & ASSOCIATES (Applicants)
CAMRAY DEVELOPMENT & CONSTRUCTION (Owners)
OAKLEY AREA
A REQUEST TO REZONE 59± ACRES OF LAND FROM P-1 FROM 145 LOTS
TO P-1 FOR 220 LOTS.
BOARD OF SUPERVISORS
CONTRA COSTA COUNTY
FEBRUARY 9, 1993 - 2:00 P.M.
i
Contra
TO: BOARD OF SUPERVISORSCosta
County
FROM: HARVEY E. BRAGDON
DIRECTOR OF COMMUNITY DEVELOPMENT ''
DATE: February 9, 1993
sra•co'urrCxFJ-
SUBJECT: Hearing on Rezoning Applicati6n'$2951-1VZ and-companion applications'
,#3010-91 and Subdivision 7657 to rezone 59t acres of land from Planned
Unit.Development (P-1.) for 145 lots with a park and detention basin to
Planned Unit Development (P-1) for 220 lots and-a park and detention
basin. Subject property is located south of Laurel Road, west of Brown
Road and north of Carpenter Road, in the dakley area. Application
filed by Bellecci & Associates and Camray Development i Construction.
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) & BACKGROUND AND JUSTIFICATION
RECOMMENDATIONS
1. Accept the environmental documentation prepared for this
project as being adequate..
2. Approve Rezoning Application ,12951-RZ, Development Plan 3010-
91 and Subdivision 7657 as recommended by the East County
Regional Planning Commission with two additional conditions
shown in the background section and previously required by the
Board for developments.
3. Adopt the East County.Regional Planning Commission's findings
as set for in Resolution 179-1992 as the determination for
these actions.
4. Introduce the ordinance giving effect to the aforesaid
rezoning, waive reading and set forth date for adoption of
same. .
FISCAL IMPACT
None
CONTINUED ON ATTACHMENT: R YES SIGNATURE
RECOMMENDATION OF COUNTY ADMINISTRATOR — RECO ON O ARD COMMITTEE
APPROVE OTHER
SIGNATURE(S) :
ACTION OF BOARD ON APPROVED AS RECOMMENDED OTHER
VOTE OF SIVPERVISORS
I HEREBY CERTIFY THAT .THIS IS A
_ UNANIMOUS (ABSENT TRUE AND CORRECT COPY OF AN
AYES: NOES: ACTION TAKEN AND ENTERED ON THE
ABSENT: ABSTAIN: MINUTES OF THE BOARD OF
SUPERVISORS ON THE DATE SHOWN.
Contact: Art Beresford 646-2031 ATTESTED
cc: Community Development Department PHIL BATCHELOR, CLERK OF
Bellecci & Associates THE BOARD OF SUPERVISORS
Public Works: Attn: Mitch Avalon AND COUNTY ADMINISTRATOR
Camray Development & Construction
AB:df BY , DEPUTY
Page Two
BACKGROUND/REASONS FOR RECOMMENDATION
This item was heard by the East County Regional Planning Commission
on November 16, 1992, at which time the Commission recommended - .--.------------ - '
approval of the rezoning request; -final development plan and
subdivision. The rezoning. conforms to the General Plan.
This project is a. result .of the change in designation of the site
from Single Family-Residential, Low Density-Interim Agriculture to
Single Family Residential Medium Density of the 1990 County General
Plan. Since the project is a request to increase the original °
approval of 145 lots to 220 lots a Traffic Impact Study was
required per Measure C (1988) . The report was. done for this'
project as well as five (5) other pending residential developments
of more than 100 lots in the Oakley. area. The Traffic Impact
Report was submitted in June 1992. The report was reviewed by
staff and found acceptable. The Developer agrees with the
mitigation measures listed in the traffic report and to do their
fair share of improvements except for the improvement of the rather
distant Vasco Road-Marsh Creek Road intersection and the State
Route 4-Lone Tree intersection which is in the City of•Brentwood by
prior agreement with the County is the responsibility of the City
of Brentwood. On this basis a Negative Declaration of
Environmental Significance was posted.
On November 16, 1992, the East County Regional Planning Commission,
after taking testimony, recommended that the Board of Supervisors
approve this project for 220 lots. with a 3.0 acre park and a 4.1
acre detention basin area subject to the Conditions of Approval
(Exhibit A) and findings attached.
Staff also recommends that the following conditions be added to the .
Conditions of Approval:
23. Pursuant to Government Code Section 6647.9, the applicant
(including the subdivide or any agent thereof) shall defend,
indemnify, and hold.harmless the Contra Costa County Community
Development Department and its agents, officers, and employees
from any claim, action, or proceeding against the Department
(the County) or its agents, officers, or employees to attack,
.set aside, void, or annul, the Department's approval
concerning this subdivision (for SUB 7657 and D.P. 3010-91)
map application, which action is brought within the time -
period, provided for in Section 66499.37. The County will
promptly notify the subdivider. of any such claim, action, or
proceeding and cooperate fully in the defense.
23. The garage area of each residence shall ,be wired for electric
car recharging subject to the review and approval of the
zoning Administrator subject to adoption of, final Board
policy.
RESOLUTION NO. 79 - 1992
RESOLUTION OF THE EAST COUNTY REGIONAL PLANNING COMMISSION OF THE
COUNTY OF CONTRA COSTA, STATE OF CALIFORNIA, INCORPORATING FINDINGS
AND RECOMMENDATIONS ON- - THE-.. REQUESTED - CHANGE BY BELLECCI &
ASSOCI-ATES (APPLICANT) - CAMRAY DEVELOPMENT &CONSTRUCTION (OWNER) ,
(2951-RZ, 3010-91 & Subdivision 7657) , IN THE ORDINANCE CODE
SECTION PERTAINING TO THE PRECISE ZONING FOR THE OAKLEY AREA OF
SAID COUNTY.
WHEREAS, a request by Bellecci & Associates . (Applicant) -
Camray Development & Construction (Owner) (2951-RZ) to rezone land
in the Oakley area from Planned Unit District for 145 lots (P-1) to
Planned Unit District for 220 lots (P-1) , along with Final
Development Plan 3010-91 and Subdivision 7657, was received on
April 25, 1991; and
WHEREAS, in connection with applicant's requests, an Initial
Study of Environmental Significance was prepared by the Community
Development Department which determined that the requested
entitlements would not have any significant adverse environmental
impacts; and
WHEREAS, for purposes of compliance with provisions of the
California Environmental Quality Act and State and County CEQA
guidelines, a Negative Declaration of Environmental Significance
was prepared, posted and circulated; and
WHEREAS, after notice was lawfully given, a public hearing was
scheduled before the East County Regional planning Commission on
Monday, November 16, 1992; whereat all persons interested might
appear and be heard; and
WHEREAS, on Monday, Monday, November 16, 1992, the East County
Regional Planning Commission having fully reviewed, considered and
evaluated all the testimony and evidence submitted in this matter;
and
NOW, THEREFORE, BE IT RESOLVED that East County Regional
Planning Commission recommends to the. Board of Supervisors of the
County of Contra Costa, State of California, that the rezoning
request of Bellecci & Associates (Applicant) and Camray Development
& Construction (Owner) (2951-RZ) be approved for change from
Planned Unit District for 145 lots (P-1) to. Planned Unit District
for 220 lots (P-1) , along with Final Development Plan 3010-91 and
Subdivision 7657, and that this zoning change be made as indicated
on the findings map entitled: Page H-24 & H-25 of the County's 1978 .
Zoning Map.
BE IT FURTHER RESOLVED that the reasons for this
recommendation are as follows:
1. The project is consistent with the County General Plan.
r
n
Page Two RESOLUTION NO. 79 - 1992
2. The project will provide needed entry level_housing for
the area.
3. The applicant's have indicated that they intend to
commence construction within two and one-half years of the
effective date of final project approval.
4. The project will constitute a residential environment of
sustained desirability and stability, and will be in harmony with
the character of the nearby community.
BE IT FURTHER RESOLVED that the Secretary of the East County
Regional Planning Commission shall respectively sign and attest the
certified copy of this resolution and deliver the same to the Board
of Supervisors all in accordance with the Planning Laws of the
State of California.
The instructions by the East County Regional Planning
Commission to prepare this resolution were given by motion of the
East County Regional Planning Commission on Monday, November 16,
1992, by the following vote:
AYES: Commissioners - Planchon, Hanson, .Hern, Maybee,
Sobalvarro, Wetzel
NOES: Commissioners - None
ABSENT: Commissioners - Andrieu
ABSTAIN: Commissioners - None
I, .Chair of the East County Regional Planning Commission of
the County of Contra Costa, State of California, hereby certify
that the foregoing was duly called and held in accordance with the
law on Monday, January 11, 1993, and this resolution was duly and
regularly passed and adopted by the following vote of the .
Commission:
AYES: Commissioners - Wetzel, Hanson, Andrieu, Maybee,
Planchon, Sobalvarro, Hern
NOES: Commissioners - None
ABSENT: Commissioners - None
ABSTAIN: Commissioners - None
l
Page Three RESOLUTION NO. 79 - 1992
Chair of the East County Regional
Planning Commission, County of Contra
Costa, State of California
ATTEST:
/ec etary of a East County Regional
Planning Commission, County of Contra
Costa, State of California
AB/df
2951-RZ.res -
r
•
Findings Map.. ._._ ._.. _
g CONTRA COSTA CANAL
UR RD
s s.. #
�I
�!
:::P.:` :. i
•�'
j -
-= 1
-.- - !
P•1
.........:
>:::.
..........::::;::::::
_i
Rezone FromR- Tooau_r� `• - Area
1, 'E.AQx.W a i 2E l__. -,Chairman of the East County
Regional Planning Commission,Contra Costa County,State of California,
do hereby certify that this is a true and correct copy of_2SGe .,
14-7r 44 � -5.pi --b"'F Ca I ASM.Ir IX-6'
indicating thereon the decision of the East County Regional Planning
Commission in the matter of ' 5c A-E<-Q `
Chairman of the East aunty Regional
Planning Commission,State of California
ATTES ;
Sec tryof th ast County Regional
PIAMInlycommiss n,State of California
dub. n c�5
;asf si:y
034-080-Q26 035-050-004 035-040-018
019,020,021,022,023
RICKY & MARSHA HUELSTER UNITED STATES OF AMERICA PETERSEN-HARRIS DEV CO
3840 BROWN RD 450 GOLDEN GATE AVE 961 GARCIA AVE #G
OAKLEY, CA 94561 SAN FRANCISCO, CA 94102 PITTSBURG, CA 94565
035-050-017 035-581-016 035-581-018
EARL JONES & MYRNA PHILLIPS RONNIE & DEBRA OTT GEORGE & CHERYL GINILD
4100 BROWN RD 400 WOODMONT PL 420 WOODMONT PL
OAKLEY, CA 94561 OAKLEY, CA 94561 OAKLEY, CA 94561
035-650-001 035-650-002 035-650-003
TILFORD & EVELYN ASHLOCK LORENZO&ELIZABETH RODRIGUEZ JOHNNY & DORIS GOODNER
81 MANDEVILLE CT 91 MANDEVILLE CT 101 MANDEVILLE CT
OAKLEY, CA 94561 OAKLEY, CA 94561 OAKLEY, CA 94561
035-650-004 035-701-001 035-701-002
005,014,015,016
MARK & DONNA SMITH CASTLEWOOD EQUITIES MARK & KATHLEEN ARROYO
100 MANDEVILLE CT 1538 LARKSPUR CT 1505 THISTLE CT
OAKLEY, CA 94561 OAKLEY, CA 94561 OAKLEY, CA 94561
035-701-003 035-701-004 035-701-006
FRANK & TAMI RODGERS RICHARD & VICKIE CALLISTER JACK & VICKI KISH
1509 THISTLE CT 1513 THISTLE CT 1521 THISTLE CT
OAKLEY, CA 94561 OAKLEY, CA 94561 OAKLEY, CA 94561
035-701-007 035-701-008 035-701-009
TIMOTHY CHAVEZ ERIC & BARBARA STELZRIEDE DAN CLAN
1525 THISTLE CT 1529 THISTLE CT 1528 THISTLE CT
OAKLEY, CA 94561 OAKLEY, CA 94561 OAKLEY, CA 94561
-- 035-701-010 - 035-701-011 035-701-013
MURRAY & JOSEPHINE DANIELS FRANCIS & PAULA MCNALLY BRUCE & DONNA BAKER
1524 THISTLE CT 1520 THISTLE CT 1512 THISTLE CT
OAKLEY, CA 94561 OAKLEY,. CA 94561 OAKLEY, CA 94561
035-650-005 035-650-006 035-691-001
REX & MITZI BASTON MAURICE LAFLEUR STEVEN KAVANAUGH
90 MANDEVILLE CT 80 MANDEVILLE CT. 4174 SEQUOLk DR
OAKLEY, CA 94561 OAKLEY, CA 94561 OAKLEY, CA 945.61
035-691-002 035-691-003 035-691-004
JEFFERY & LAURA BODSON JOHN & MARILYN NOVO NORMAN & WANDA MYERS
4170 SEQUOIA DR 4166 SEQUOIA DR 4162 SEQOUTA DR
OAKLEY, CA 94561 OAKLEY, CA 94561 OAKLEY, CA 94561
035-691-005 035-691-006 035-691-007
GARY FRANKLIN. RICHARD & DIANE ABDELNOUR ROY & KELLY SCHULER
4158 SEQUOIA DR 4154 SEQUOIA DR 4150 SEQUOIA DR
OAKLEY, CA 94561 OAKLEY, CA 94561 OAKLEY, CA 94561
035-450-008 035-650-010 035-650-011
TIMOTHY & VICKI JOHNASEN I THOMAS & BETH JACKSON FRANCES MC GUIRE
61 ISOLA CT 70 ISOLA CT. 640 VIACASITAS
OAKLEY, CA 94561 OAKLEYI CA 94561 GREENBRAE, CA '94904
035-650-012 034-010-003 034-010-004
FRANK FAVALORA ANTHONY & JEANNE DEAN MANUEL & MARY CAMBRA
50 ISOLA CT RT. 1 BOX 180 1931 LAUREL RD.
OAKLEY, CA 94561 OAKLEY; CA 94561 OAKLEY, CA 94561
034-010-010 034-010-013 034-010-015
FAKHRY, ANN, CHRISTIANE &
OSVAMA KAWAR ROY &ERICA PANTLE STAN .PLANCHON
1350 TREAT BLVD #280 3920 EMPIRE AVE RT 1 BX 176
WALNUT CREEK, CA 94596 OAKLEYs. CA .94561 OAKLEY, CA 94561
034-010-016 034=020-001 034-020-002
C\O MIKE MCGRATH
MIDAN DEV: INC. GEORGE_ &.LULA SCHURZ W06DHILL DEVELOPMENT COMPANY
7510 SHORELINE DR #A1 14507 BRAMBLEWOOD DR P.O. BOX 1541
STOCKTON CA 95209 HOUSTONI TX 77079 PLEASANTON, CA 94566
034-020-005 034=020-007 034-020-008
FAKHRY ANN, OSVAMA &
CHRISTIANE KAWAR PAUL & JULIA SANDOVAL DOROTHY MAATZ, TRE
1350 TREAT BLVD #280 P,O6 BOX 1239 1520 CARPENTER RD
WALNUT CREEK, CA 84596 OAKLEYI 'CA 94561 OAKLEYj CA 94561
034-020=009 034=020=010. 034=030-003
WOODHILL DEV. CO. EMI.LE & NEI,LIE MC KINNEY RAYMOND & BEVERLY NOVARINA
P.O. BOX 1541 . .3530 EMPIRE. AVE 1629 CARPENTER RD.
PLEASANTONi CA 94566 OAKLgY; CA 94561 OAKLEY; CA 94561
034-030-004 034=030=005. 034-030=006
JAMES SCELSf
MANUEL & NORMA GONSALVES t/0,18HERY' k ftkkINS LONG TRUST
361 SANDY LNi 1076 APPLE M RT. 1 BOX 169
OAKLEY, -CA 94561 CONCORD; CA 94.518 OAKLEY; CA 94561
034-030-001 034=030-008 . 034-040-001
JAMES SCELSI
LEO, MARIA & PAUL MASTER 6/0 SHERYN PERKINS RONALD NUNN
40 HIGHLAND AVE. 1076 APPLE CT; RT. 1 BOX 200
SAN FRANCISCO] CA 94110 CONCORD; CA 94518 BRENTWOOD, CA 94513
034-040-003 034-040-010 034-060-001
CUTI CORPORATION bENNIS GACA CLYDE &CLYDE HOPKINS
P.O. BOX 5 5139 PORT CHICAGO HWY 1400 VINTAGE DR
OAKLEY, CA 94561 CONCORb; CA 94520 bAKLEY, CA 94561
034-060-005 034-070-011 034-070-018
DUARTE CORPORATION JOE TERRANOVA
C/O JOSEPH & KAY DUARTE JOHN CAFFEYi TRE PEGGY JONES
1241 CARPENTER RD 1476 CARPENTER RD. 267 PARKWAY
OAKLEY, CA 94561 OAKLEYi CA 94561 LEWISTON, ID 85310
034-070-019 _034-070-021 034-070-072 5�
JAMES & DELORES KEHN GLENN & KAREN ECHOLS JORDAN JOHNSON cc((D q q
RT. 1 BOX 186 3630 BROWN RD. 1459 KAY AVE
,0"l FY GA 94s81 nitt.Cy eA OA"f .sv•,e.i ...s..+.r �
035-691-008 035=691=009 035-691-010
JOSEPH,CARMEL&ANTONIA SMITH RICHARD &:DEBRA NG f DOUG & IRENE KERCHER
4146 SEQUOIA DR 4142 SEQUOIA DR 4138 SEQUOIA DR
OAKLEY, CA 94561 OAKLEY, CA 94561 OAKLEY, CA 94561
034-070-060 034-070-061 034-070-062
RICHARD & CAROL RIOS RICHARD & CAROL RIOS RICHARD & JANE FLORENDO
35 KAY CT. - - -35 KAY"CT. 47 KAY AVE. -
OAKLEY, CA 94561 OAKLEY, CA 94561 OAKLEYi CA 94561
034-080-002 034-080-003 034-080-005
LEONARD & MARY BLOODWORTH MAKLE- & JUANITA 90SENSTI9L CYNTHIA GATES
RT. 1 BOX 187 3890 HOLMES RD: 3901 HOLMES RD
OAKLEY, CA 94561 OAKLEY, CA 94561 OAKLEY, CA 94561
034-080-006 034-080-025 034-080-027
RICHARD & ANNA'CUNNINGHAM FRED & ANN ENGELHARDT DAVID & JUDITH TRAVERS
RT. 1 BOX 187A HOLMES RD. 3780 BROWN RD: 3900 BROWN RD.
OAKLEY, CA 94561 OAKLEYt CA 94561 OAKLEYt CA 94561
034-080=028 034-080-036 034-080-037
RONALD JARSHAW RAYMOND & VALERIE BAYLEY FRED REIS
RT. 1 BOX A-187 41 GREENSBORO WAY 3801 HOLMES DR.
OAKLEY, CA 94561 ANTIOCHt CA 94509 OAKLEY, CA 94561
034-080-038 034-080-039 035-040-010
DAVID CONTRERAS ANNETTE CHARRETTE KIM MCBRIDE & ANTHONY WALKER
3770 HOLMES RD 3760 HOLMES RD 1580 LAUREL RD
OAKLEYt CA 94561 OAKLEY, CA 94561 OAKLEYj CA 94561
035-040-011 035-050-007 035-050-008
CHURCH OF LATTER-DAY SAINTS
TIMOTHY & DENISE MOFFETT NARCISO & MARIA FERREIRA c/o LDS CHURCH' TAX ADMIN.
1600 LAUREL RD 4080 BROWN RD. 50 E. NORTH TEMPLE 22nd
OAKLEY, CA 94561 -- OAKLEYt CA 94561 SALT LAKE CITY, UT 84150
035-050-009 035-581-017 035-592-008
CHURCH OF LATTER=DAY.SAINTS
c/o LDS CHURCH TAX ADMIN: DAVID BLACKBURN ELISE WALKER
50 E. NORTH TEMPLE 22nd 410 WOODMONT PLACE 4210 SEQUIOA DR.
SALT LAKE CITY] OT 84150 OAKLEY; CA 94561 OAKLEYt CA 94561
035-592-009 035_592.=010 035-592-011
DAVIDt SUSAN; AUSTIN &
WILLIAM & FLORA CRAFT LEONARD & KAREN. RASMUSSEN , PHYLLIS BOWERS
4206 SEQUOIA DR 2990 ALMOND WOOD PL 4198 SEQUOIA DR
OAKLEY, CA 94561 OAKLEY, CA 94561 OAKLEYt CA 94561 j
035-592-012 035=592-013 . 035-592-014
ROGER & CHARLEEN RYBICKI DAVID & GERTRUDE SWANN RALPH & ROSEMARY COSTA
4194 SEQUOIA DR 4190 SEQUOIA DR 2464 VIA DE LOS MILAGROS
OAKLEY, CA 94561 OAKLEY, CA 94561 PLEASANTON, CA 94566
035-592-015' 035-592-016 035-650-007
.RAY PARKER
LAVERN GHIRARDELLI ROBERT & MARY WARD PHILLIP & MARY GEE (Ciwoi q
4182 SEQUOIA DR 4178 SEQUOIA DR 51 ISOLA CT
o*AtJXq rA oANt1`f /siRK 7►t Gtr qAf. X I r.,aw 4.eAadgg/
0.l!)--:)!TZ-UE1 i 03o-7U1-UI2
DAVID & FUMIKO SANDERS RAY LUCCHESI J. PATRICK LAND CO.
4214 SEQUOIA DR 1516 THISTLE CT 7901 STONERIDGE DR. #403
OAKLEY, CA 94561 OAKLEY, CA 94561 PLEASANTON, CA 94566
CAMRAY
7919 FOLSOM BLVD #150._. _
SACRAMENTO, CA 95826
Cq 0(4
EXHIBIT
CONDITIONS OF APPROVAL FOR REZONING 2951-RZ - AS APPROVED BY THE EAST
COUNTY REGIONAL PLANNING COMMISSION ON NOVEMBER 16, 1992
1 . This approval is based upon the following exhibits received by the Community
Development Department and listed-as follows:_
A. Exhibit A Final development plan and vesting tentative map dated received
April 25, 1991 for 220 lots and single family residences together with a 3 acre
park area and a 4.1 drainage basin area on a 59:t acre site together with a
preliminary grading plan for the site on the same sheet.
B. Exhibit B - Revised plan dated received November 9, 1992 showing relocation
of park area and reorientating of "C" and "D" Courts.
2. Sewage disposal serving the property concerned with this application shall be provided
by the Ironhouse Sanitary District.
3. Water supply serving the property concerned with this application shall be provided by
the Oakley Water District.
4. Comply with the requirements of the Oakley Fire Protection District including a
provision for water supply and fire hydrants.as determined by the District.
5. The total number of lots for this development shall not exceed 220.
6. With this approval, the previously.approved P-1 district (2721-RZ, D.P. 3028-87, and
SUB 6845) are null and void.
7. The approval of this rezoning shall run with and be concurrent with the length of
approval for the accompanying final development map and tentative subdivision map.
AB/aa -
SUBX/7657C.AB
11/2/9,2
EXHIBIT "A"
CONDITIONS OF APPROVAL FOR FINAL DEVELOPMENT PLAN 3010-91 AND SUBDIVISION
7657 - AS APPROVED BY THE EAST COUNTY REGIONAL PLANNING COMMISSION ON
NOVEMBER 16, 1992
1 . This approval is based upon the exhibits received by the Community Development
Department listed as follows:
A. Exhibit A-Final development plan and tentative subdivision map dated received
April 25, 1991 for 220 lots and single family residences, a 3 acre park area and
a 4.1 acre drainage basin area all within a 59:t acre site together with a
preliminary grading plan for this site on the same sheet.
B. Exhibit B - Revised plan dated received November 9, 1992 showing relocation
of park area and reorienting of "C" and "D" Courts.
2. The approval of Final Development Plan 3010-91 shall run concurrently with a time
limits of SUB 7657. Approval is for a three year period which may be extended for an
additional three year period with request prior to this approval lapsing. Development
may be done in phases subject to the review and approval of the Zoning Administrator.
3. Any revision of internal circulation plan and lot layouts shall be subject to the review
and approval of the Zoning Administrator. The 3 acre parcel for the site for the park
shall be moved to the northeast corner of the site and combined with the 1.67 acre
park land from SUB 7630 and the drainage basin generally as shown on the revised :... .
plan submitted November 9, 1992.
4. The guide for development and use provision shall be the single family residential
district R-10:
A. Setback for residential units shall be varied between 20 and 25 feet. Frontyard
setbacks may be reduced to 15 feet for covered porches. Sideyard minimum .
shall be 5 feet with a total aggregate sideyard of 15 feet. For covered porches,
sideyard minimum shall be-5 feet with a total aggregate sideyard of 10 feet.
Lots that front on cul-de-sacs or corners may have sideyard minimums of 5 feet
with an aggregate of 10 feet. Lots that front on cul-de-sacs or corners may
have sideyard minimums of 5 feet with an aggregate of 10 feet. Covered
porches in these situations may have sideyard minimum of 5 feet with an
aggregate sideyard of 10 feet. Rearyards for residences shall be a minimum of
15 feet. The R-10 zoning district shall be used as a guide for heights and/or lot
coverage and use of any detached sheds or garages on the site or any other
uses of the site.
5. Should archaeological materials be uncovered during grading,trenching or other on-site
excavation(s), earthwork within 30 yards of these materials shall be stopped until a
professional archaeologist who is certified by the Society for California Archaeology
(SCA) and/or the Society of Professional Archaeology (SOPA) has had an opportunity
to evaluate the significance of the find and suggest appropriate mitigation(s), if deemed
necessary.
.
2.
6. Sewage disposal serving the property concern in this application shall be provided by
the Ironhouse Sanitary District. Prior to recording the final map a will serve letter from
the Ironhouse Sanitary District shall be submitted.
7. Water supply serving the property concern with this development shall be by the
Oakley Water District. Prior to recording the final map a will service letter from the
Oakley Water.District shall be submitted.
8. Street name shall be acceptable to the Community Development Department and to
the Oakley Fire Protection District. Proposed street names shall be submitted to the
Graphic Section of the Community Development Department at least 30 days prior to
recording the final map.
9. At least 30 days prior to recording the final map for this site, the applicant shall submit
a landscape plan conforming to the County's Water Conservation policies and to the
Oakley Landscape Guidelines.
A. Native, drought tolerant plants shall be used whenever feasible.
s.
B. Landscaping along all streets, setbacks and each frontyards shall conform to
the County Landscape Guidelines. A typical frontyard landscaping plan shall be
submitted for the review and approval of the'Zoning Administrator and shall be
implemented prior to occupancy of the various residences on the site.
C. Submit a street tree planting plan. A minimum of two 15-gallon street trees for
each lot shall be planted accept the corner lots shall have at least four street
trees.
D. Fencing design and location shall be shown on the plans. A suitable masonry
wall shall be erected along the site's residential frontage on Laurel Road. This
wall design shall be subject to the review and approval of the Zoning Adminis-
trator. The sound wall shall conform to acoustical requirements to lower noise
levels from Laurel Road. The Laurel Road frontage of the site can be mounted
to reduce overall heights of the sound wall. The masonry wall design shall be
reviewed and OMAC and their comments submitted to the Zoning Administrator
prior to the Zoning Administrator's review and approval of the wall plan.
E. A landscape and wall/fence plan shall be submitted to the site's frontage along
Carpenter Road. The landscaping and suitable wall/fence shall be constructed
and installed prior to the issuance of building permits on phase of the project
fronting on Carpenter Road.
i
r
I
I
i
f
3.
F. All landscaping shall be maintained by the applicant until occupancy, or in the
case of common areas and street frontage areas until annexation into a
landscape and lighting district. The.applicant will be requried to annex when
the district is formed. Future homeowners shall be notified by deed notice of
the fact that the site is within a landscape and lighting district and/or park
district.
G. The westerly and easterly sides of the project that do not front upon streets
shall be fenced with a suitable 6-foot tall solid wood fence with cement
palisters or other measures designed to hold the fence up in the sandy soil.
The portion.of the property that is located in the area of the proposed detention
basin shall be fenced with a suitable 6-foot tall cyclone fence or some other
fence acceptable to the County Flood Control District. This fencing shall be
installed prior to the issuance of building permits on this development. The
park area shall be sloped to drain toward the detention basin and shall at a
minimum be planted with annual grasses and California wildflower mix. The
Laurel Road frontage of the park shall be suitability fenced and, if acceptable,
mounded.
H. Grading plan shall include an erosion protection on all slopes of five feet or
more in height and a gradient steeper 10:1. Protection shall be equal to or
better than hydroseeding with mulch. Hydroseeding shall be recommended by
a certified landscape architect. If agreeable to the neighboring property
owners, the fill slope shall be moved to the property line behind the lots that
front along proposed "N" Street.
10. The owner of the property shall participate in the provision of funding to maintain and
augment police services(by voting to approve a special tax for the parcels created by
.this--subdivision approval. The tax shall be the perparcel annual amount (with
appropriate future CPI adjustment), then established at the time of voting by the Board
of Supervisors. The election to provide for the tax shall be completed prior to the filing
of the final map. The property owner shall be responsible for paying the cost of
holding the election, payable at the time that the election is requested by the owner.
11. The following statement shall be recorded at the County Recorder's Office for each
parcel to notify future owners of the parcels that they own property in an agricultural
area:
"This document shall serve as notification that you have
purchased land in an agricultural area where you may regularly
find farm equipment using local roads; farm equipment causing.
dust; crop dusting and spraying occurring regularly; burning
associated with agricultural activities; noise associated with farm
equipment and aerial crop dusting and certain animals and flies
4.
may exist on surrounding properties. This statement is,again, notification that
this is part of the agricultural way of life in the open space areas of Contra
Costa County and you should be fully aware of this at the time of purchase."
12. Provide for child care facility and in conformance with Chapter 82-22, "Child Care
Facilities", of the County Code. This shall be accomplished prior to recording the final
map for this project.
13: Prior to the issuance of building permits, the applicant shall submit a detailed
transportation demand management (TDM) plan for review and approval of the Zoning
Administrator (unless otherwise requried by a TDM Ordinance). The approved TDM
plan shall be operative prior to final inspection by the Building Inspection Department
of residences within this site.
14. Comply with the following construction, noise, dust and litter control requirements:
A. Noise generating construction activities, including such things as power
generators, shall be limited to the hours of 7:30 A.M. to 5:00 P.M., Monday
through Friday, and shall be prohibited on State and Federal holidays. The
restrictions on allowed working days may be modified on prior written approval
by the Zoning Administrator.
B. The project sponsor shall require their contractors and subcontractors to fit all
internal combustion engines with mufflers which are in good condition and shall
locate stationary noise-generating equipment such as air compressors and
concrete pumpers as far away from existing residences as possible.
C. At least one week prior to commencement of grading, the applicant shall post
- the site and mail to-the owners of property within 300 feet of the exterior
boundary of the project site notice that construction work will commence. The
notice shall include a list of contact persons with name, title, phone number
and area of responsibility. The person responsible for maintaining the list shall
be included. The list shall be kept current at all times and shall consist of
persons with authority to indicate and implement corrective action in their area
of responsibility. The names of the individual responsible for noise and litter
control shall be expressly identified in the notice. The notice shall .be reissued
with each phase of major grading activity.
A copy of the notice shall be concurrently transmitted to the community
Development Department. The notice shall be accompanied by a list of the
names and addresses of the property owners noticed, and a map identifying the
area noticed.
I
I
5.
D. A dust and litter control program shall be submitted for the review.and approval
of the Zoning Administrator. Any violation 'of the approved program or
applicable ordinances shall require an immediate work stoppage. Construction
work shall not be allowed to resume until, if necessary, an appropriate
construction bond has been posted.
E. The applicant shall make a good-faith effort to avoid interference with existing
neighborhood traffic flows. Prior to issuance of building permits, the proposed
roads serving this development shall be constructed to provide access to each
lot. This shall include provision for an on-site area in which to park earth
moving equipment.
15. Where a lot/parcel is located within 300 feet of a high voltage electric transmission
line, the applicant shall record the following notice:
"The subject property is located near a high voltage electric
transmission line. Purchasers should be aware that there is
ongoing research on possible potential adverse health effects
caused by the exposure to a magnetic field generated by high
voltage lines. Although much more research is needed before
the question of whether magnetic fields actually cause adverse
health effects can be resolved, the basis for such an hypothesis
is established. At this time no risk assessment has been made."
When a Final Subdivision Public Report issued by the California Department of Real
Estate-is required, the applicant shall also request that the Department of Real Estate
insert the above note in the report.
16. In the event that this project, SUB 7657 and D.P. 3010-91 , is restricted by declaration
of. covenants, conditions and restrictions (CC & Rs), they must be received prior to
approval of the final map. These CC & Rs shall meet applicable regulations of the
California State Real Estate Commission and provide for architectural maintenance
community to administer and enforce them (the applicant will be required to deposit
with said committee funds to be used for enforcement of the CC & Rs).
17. At least 45 days prior to recording a Final Map, issuance of a grading permit , or
installation of improvements or utilities, submit a preliminary geology, soil,- and
foundation report meeting the'requirements of Subdivision Ordinance Section 94-4.420
for review and approval of the Zoning Administrator. Improvement, grading, and-
building plans shall carry out the recommendations of the approved report.
18. Record a statement to run with deeds to the property acknowledging the approved
soils report by title, author (firm),and date,calling attention to approved recommenda-
tions, and noting that the report is available from the seller.
6.
19. Comply with the requirements ofthe Contra Costa Water District in regards to the
irrigation lateral that crosses the site. Prior to recording the final map for this
development or issuance of grading permits, the applicant shall submit a letter from
the Water District indicating that an agreement has been reached in this area.
20. Prior to recording the final map for this site, the 1.67 acre property within the J.
Patrick Land Development to the west of the site shall be transferred to this site. A
revised tentative map submitted for the review and approval of the Zoning Administra-
tor. The 3 acre park area together with 1.67 acre park dedicated by the J. Patrick
Land Development (SUB 7630) shall be moved to the area to the west of the proposed
4.1 acre detention basin along Laurel Road.
21. Prior to recording the final map for this subdivision or any phase of this subdivision,
the applicant shall submit will serve letters from the Oakley School District and the
Liberty Union High School District.
22. The following requirements pertaining to drainage, road, and utility improvements will
required the review and approval of the Public Works Department:
A. In accordance with Section 92-2.006 of the County Ordinance Code, this
subdivision shall conform to the provisions of the County Subdivision Ordinance
(Title 9). Any exceptions therefrom must be specifically listed in this
conditional approval statement. Conformance with the Ordinance includes the
following requirements:
1) Constructing road improvements along the frontage of Laurel Road,
Brown Road and Carpenter Road, including the detention basin site on
the corner of Laurel Road and Brown Road.
Construct road improvements as shown or) the Vesting Tentative Map
with the. following modifications and additions:
The sidewalk along Laurel Road shall be six feet wide.
The sidewalk along Carpenter Road shall be six feet six inches. .
(width measures from curb face).
The improvements shall also include landscaping and irrigation
along Laurel Road as well as all necessary longitudinal and
transverse drainage and conforms along all three roads.
All pavement shall be a minimum of 28 feet in width.
7.
The Laurel Road improvements (33-feet wide pavement and one-half
width landscaped median) shall be constructed on the north side of the
right of way and the southerly half of the right of way shall be graded,
drained and landscaped (with drought tolerant native ground cover) all
to ultimate line and grade. Construction of frontage (on the south side
only) 'improvements' including but not limited to a soundwall border
landscaping with automatic irrigation system, six foot meandering
sidewalk,street lights, drainage improvements and curb and gutter.The
Laurel Road improvements shall include landscaping and irrigation of the
median and parkway areas. In lieu of construction of the median island,
complete with surface treatment (landscaping, etc.), the applicant can
contribute an equivalent contribution to a Road Improvement Fee Trust
(819200-0800), to be used to construct these improvements at a later
time. The curb and gutter shall be installed 15 feet from the right of
way line. All improvements shall be subject to.the review of the Public
Works Department, Road Engineering Division, and the review and
approval of the Zoning Administrator. All Laurel Road improvement shall
be designed for 55 mph, all Carpenter Road improvements shall be
designed to 45 mph and-all Brown Road improvements shall be designed
to 40 mph.
Of the 33 feet wide pavement on the north side of Laurel Road, the
developer is responsible for 20 feet and the AOB 13 feet. Subdivisions
6971 and 7489 have been conditioned to construct improvements along
their frontages on the north side of Laurel Road. If the frontage
improvements of these two subdivisions have been completed or
bonded prior to the filing of the final map for this subdivision; the
applicant shall construct their share of improvements (20 feet of
pavement and half. mediad) at another location along Laurel Road
(subject to the review and approval of the Public Works Department, or
contribute an equivalent contribution to Road Improvement Fee Trust
(819200-0800) to construct other improvements to Laurel Road. The
contribution shall include 10 percent for design-engineering and 12.5
percent for construction engineering.
The above contribution amounts maybe determined using the current
unit construction bond costs in the Engineering Services Division. The
_cost estimate for landscaping shall be based on the industry standard for
work on similar roads.
2) Installing street light and annexing the property to County Service Area
L-100 for maintenance of the street lights. The final number and
location of the lights shall be determined by the County Traffic Engineer.
8.
3) Undergrounding of all utility distribution facilities, including the existing
utilities along the Laurel Road, Brown Road and Carpenter Road
frontages.
4) Conveying all storm waters entering or originating within the subject
property, without diversion and within an adequate drainage facility, to
a natural watercourse having definable bed and banks or to an existing
adequate storm drainage facility which conveys the storm waters to a
natural watercourse.
In order to satisfy the "collect and convey" requirement the developer
should be requried to construct a portion of Line A, a portion of Line A-
1, all of Line A-2, and outlet structure of the Drainage Area 30A plan.
Also, the proposed storm drain shown on the vesting tentative map
running along the south side of Laurel Road should drain into the basin.
Designing and constructing storm drainage facilities required by the
Ordinance in compliance with specifications outlined in Division 914 of
the Ordinance and in compliance with design standards •of the Public
Works Department.
Installing, within a dedicated drainage easement, any portion of the,
drainage system which conveys run-off from public streets.
5) Submitting improvement plans prepared by a registered civil engineer,
payment of review and inspection fees, and security for all improve-
ments requried by the.Ordinance Code or the conditions of approval for
this subdivision. These plans shall include any necessary traffic signage
and striping plans for review by.the County Traffic Engineer.
6) Submitting a Final Map prepared by a registered civil engineer or
licensed land surveyor.
B. Convey to the County, by Offer of Dedication, additional right of way on Laurel Road
as required for the planned future width of 110 feet and observe a building setback
from the widened Laurel Road right of way as described in condition of approval 22.P.
C. Convey to the County, by Offer of Dedication, additional right of way on
Carpenter Road as requried for the planned future width of 60 feet. Convey
to the County, by Offer of Dedication, additional right of way on Brown Road
as requried for the planned future half width of 40 feet.
I
I
i
I
9.
D. This project lies within-the 60db noise contour of the County General Plan.
Construct,a masonry soundwall along Laurel Road (excluding the detention
basin area) subject to the review and approval of the Zoning Administrator.
E. Relinquish abutter's rights of access along Laurel Road, Brown Road and
Carpenter Road with the exception of the one entrance road along each
frontage.
F. Construct the on-site road system to County public road standards and convey
to the County, by Offer of Dedication, the corresponding right of way. The
minimum road width for partial roads will be 28 feet. On all public roads with
longitudinal slopes less than five percent, all public pedestrian access ways
shall be designed in accordance with Title 24 (Handicap Access). This shall
include all driveway depressions as well as handicap ramps.
G. "A" Street between Laurel Road and "E." and "D" Court shall be a minimum 48
foot road within a 68 foot right of way to provide for a 20 foot in bound lane
and a 28 foot out bound lane. "A" Street between "E" and "D" Court and "B"
Street shall be a minimum 40 foot roadway within a 60 foot right of way.
H. The applicant shall construct necessary pavement widening, signing and
striping to provide for left turn channelization from Laurel Road into this project,
all at its ultimate location.
I. Prevent storm drainage, originating on "the property and conveyed. in a
concentrated manner, from draining across the sidewalks and driveways.
J. Submit a sketch plan to the Public Works Department, Road Engineering
Division, for review showing all public road improvements prior to starting work
on the improvement plans. The sketch alignment plan shall be to scale and
show proposed and future curb lines, lane striping details and lighting. The
sketch alignment plan shall also include adequate information to show that
adequate sight distance has been provided.
K. Install permanent landscaping and automatic irrigation facilities within the
parkway and median areas, and install interim landscaping features within the
future road areas, if any. All work shall. be done in accordance with the
guidelines and standards of the County. Funding of, and maintenance of, the
new plantings shall be guaranteed by the developer until the expiration of the
plant establishment period and, until funds are available through a landscaping
district. Bonding for landscaping shall be based on the industry standard for
work on similar roads.
10.
L. Apply to the Public Works Department for annexation to the County Landscap-
ing District AD 1979-3 (LL-2) for the future maintenance of landscaping and
irrigation facilities in median islands, parkways and other areas ("open space"
is specifically excluded). New owners shall be notified by deed notification that
the subject property is within a lighting and landscaping district.
M. Submit landscaping plans to the Public Works Department and pay the plan
review and field inspection fees. All landscaping and irrigation facilities shall
be maintained by the applicant until funds become available for their mainte-
nance by.the County after final inspection if cleared.
N. Furnish proof to the Public Works Department, Engineering Services- Division,
of the acquisition of all necessary rights of entry and/or easements for the
construction of off-site, temporary or permanent, road and drainage .improve-
ments.
O. Provide deed notification and signing to inform prospective property owners
that "F". "B", "M", and "J" Streets may be extended in the future.
P. Extend frontage improvements along the full Laurel Road frontage of this
property and extending to Brown Avenue without a break. The improvements
shall include,the off-site area noted on the Vesting Tentative Map as Detention
Basin. The Laurel Road improvements shall include landscaping and irrigation
of the median and parkway areas. The full 1 10-foot right of way shall be taken
from this side of the Contra Costa Canal right of way. In the vicinity of the
Contra Costa Canal right of way the applicant shall observe an additional 16-
foot structure setback. An additional 8-foot structure setback shall be observed
where additional right of way may be obtained from the property to the north.
Q. Extend frontage improvements along the Brown Avenue frontage of this
property along the area noted as detention basin and park. Brown Avenue shall
include a graded, separated 10-foot equestrian/pedestrian trail along the east
side of the road (subject to the review and approval of the Zoning Administra-
tor). The applicant shall dedicate a 40-foot half width for the future 70-foot
right of way (30-foot on the east side).
R. Carpenter Road shall be reconstructed due to inadequate alignment. The
improvements shall be subject to the review of the Public Works Department,
Road Engineering Division, and the review and approval of the Zoning
Administrator. The Carpenter Road improvements shall extend across the area
designated as park site.
S. Apply to the Public Works Department for annexation of the property to
Drainage Area 300 for the maintenance and operation of the drainage area
facilities.
i
T. Certain road or drainage area improvements required may be eligible for credit
or reimbursement against Area of Benefit or drainage area fees, such as
required pavement width in excess of 20 feet, and drainage area lines. The
developer shall contact the Public Works Department, Road Engineering
Division, for road improvements, or the Flood Control District for drainage area
improvements, to determine the extent of any credit or reimbursement for
which the applicant might be eligible. Prior to constructing any public
improvements, or filing of the final map, the applicant shall execute a
credit/reimbursement agreement with the County. No credit or reimbursement
will be made for any improvements installed prior to execution of the cre-
dit/reimbursement agreement.
U. Prior to filing the final map, contribute this developments fair share towards the
improvements in the Oakley area that are identified on page 13 in the June 19,
1992 Traffic Impact Study by DKS Associates as needing additional mitigation.
The applicants share of these improvements shall be based on the number of
approved units in this development divided by the anticipated number
of approved units within the Oakley/N. Brentwood AOB boundary between now
and the year 2000. This condition of approval will be satisfied if the Oakley/N.
Brentwood AOB is updated to include the improvements referenced above.
V. Construct improvements along Empire Avenue from the northerly property line
of Subdivision 7630 north of Laurel Road. These improvements shall consist
of paving Empire Avenue to a minimum of 28-foot width at ultimate line and
grade.. Provide paved access to all properties to the point of driveway conform
or ten feet, whichever is greater. Provide access to the southern part of the
Planchon parcel from Empire Avenue that is designed -to accommodate the
property owners agricultural equipment. The design shall be subject to review
of the Public Works Department and review and approval of the Zoning
Administrator. The property owner shall have the opportunity to review the
design and shall be notified of the time and place of the review by the Zoning
Administrator. All access and driveway conforms shall be wherever feasible,
at a maximum grade of 10% and shall provide for adequate drainage.
Subdivision 7630 has also been conditioned to construct these road improve-
ments. The applicant should contact the developer of Subdivision 7630 to
enter into a reimbursement agreement for this work. Any Area of Benefit cred-
it/reimbursement for this work would be split equally between this project and
Subdivision 7630. All bids for this work shall be reviewed and approved by the
Public Works Department prior to award. At least three beds are required.
12.
ADVISORY NOTES
A. The applicant/owner shall be aware of these reviewing requirements prior to requesting
the recording of the final map and/or requesting building and grading permits.
B. Applicant shall comply with the Park Dedication Fee Ordinance.
C. Comply with the requirements of the Ironhouse Sanitary District, including annexation
to that district.
D. Comply with the requirements of the Oakley Water District, including annexation to
that district.
E. Comply with the requirements of the Oakley Fire Protection District as outlined in their
letter dated June 3, 1991 .
F. Comply with the requirements of the Building Inspection Department.. This may
include the submittal of additional soils data regarding the foundation designs of the
various residences within this site.
G.. The project lies within the 100-year flood boundary as designated on the Federal
Emergency Agency Flood Rate Maps. The applicant should be aware of the
requirements of, the Federal Flood Insurance Program and the County Flood Plain
Management Ordinance (Ordinance No. 87-65) as they pertain to future construction
of any structures on this property.
H. The applicant is advised that the tax of the police services district is currently set by
the Board of Supervisors at $200 per parcel annually (with appropriate future
Consumer Price Index {CPI} adjustments►. The annual fee is subject to modification
by the Board of Supervisors in the future. The current fee for holding the election is
$.800 and is also subject to modifications in the future. The applicable tax and fee
amounts shall be those established by the Board of Supervisors at the time of voting.
I. The applicant will be required to comply with the drainage fee requirements for
Drainage Area 30A as adopted by the Board of Supervisors.
Certain improvements required by the Conditions of Approval for this development or
the County Subdivision Ordinance Code may be eligible for credit or reimbursement
against said fee. The developer should contact the Public Works Department to
personally determine the extent of any credit or reimbursement for which he might be
eligible.
J. The applicant will be requried to comply with the requirements of the
Bridge/Thoroughfare Fee Ordinance for the Oakley Area of Benefit as adopted by the
Board of Supervisors.
13.
Certain improvements requ'ried by the Conditions of approval for this development or
the county Subdivision Ordinance Code may be eligible for credit or reimbursement
against said fee. The developer should contact the Public Works Department to
personally determine the extent of any credit or reimbursement for which he might be
eligible.
K. This project is subject to the development fees in effect under County Ordinance as
of May 25, 1991, the date of the vesting tentative map application was accepted as
complete by the Community Development Department. These fees are in addition to
any other development fees which may be specified in the conditions of approval.
AB/aa
SUBX/7657C.AB
11/10/92
11/16/92-EC(a)
12/14/92
Agenda Item 1 2 4 3
Community Development Contra Costa County
EAST COUNTY REGIONAL PLANNING COMMISSION
MONDAY, NOVEMBER 16, 1992 - 7:00 P.M.
1. INTRODUCTION
BELLECCI &ASS.00IATES (Applicant) -CAMRAY DEVELOPMENT &CONSTRUCTION
(Owner), County File #2951-RZ: The applicant requests approval to rezone 59 acres
from Planned Unit District (P-1) for 145 lots and single family residences,a 3 acre park
and a 4.1 acre detention basin to Planned Unit District (P-1) for 220 lots and single
family*residences, a 3 acre park and a 4.1. acre detention basin.
BELLECCI &ASSOCIATES (Applicant) -CAMRAY DEVELOPMENT &CONSTRUCTION
(Owner), County File #3010-91: The applicant requests approval of a final develop-
ment plan to construct 220 single family residences.
SUBDIVISION 7657 (Applicant: Bellecci &Associates) (Owner: Camrav Development
Construction): The applicant requests approval of a vesting tentative map to divide 59
acres into 220 single family lots with .a 3 acre park area and a 4.1 acre detention
basin.
Subject property for the above referenced projects consists of five descriptive parcels
with frontage on Laurel Road, Brown Road and Carpenter Road, in the Oakley area.
The site fronts for 1,087 feet on the south side of Laurel Road, approximately 870 feet
east of Empire Avenue, for approximately 638 feet on the west side of Brown Road,
just south of Laurel Road, and for 585 feet on the north side of Carpenter Road, 1,320
feet east of Empire Avenue. Site contains 59 acres of land more or less (P-1) (ZA: H-
24,.H-25, J-24, J-25) (CT 30201 (Parcel #034-010-006; -007, -017, -018 and 034-
020-006)
11 RECOMMENDATION
Staff recommends that the East County Regional. Planning Commission adopt a
resolution that.recommends that the Board of Supervisors approve 2951-RZ, D.P.
3010-91, and SUB 7657, subject to attached conditions of approval.
111. GENERAL INFORMATION
A. General Plan: The site is designated Single Family Residential-Medium Density
on the 1991 General Plan. The development conforms to the General Plan
designation for the density for the site of 3 to 5 du/net acre. This density for
the project is 4.9 du/net acre. Land to the south of the site across Carpenter
Road is designated as Single Family Residential-Low Density. Lands to the east
and west of the site is designated Single Family Residential-Medium Density.
Land to the north of the site is designated Single Family Residential-High
2
Density, except for the land surrounding the Contra Costa Canal which is
designated as Public-Semi-Public. There are approved subdivisions both to the
east and west of the site"and to the north of the site. The site and surrounding
properties all have previous approvals under -the previous General Plan
designation of Single Family Residential-Low Density. Most properties have had
applications refiled for subdivisions with.a density in conformance with Single
Family Residential-Medium Density.
B. Zoning: The site is presently zoned P-1 for 145 lots.. The proposed zoning is
a request to continue the P-1 zoning district but amended to allow for 220 lots.
C. CEQA Status: A Negative Declaration of Environmental Significance was
posted for this project. A traffic impact study was prepared for the project
along with several other large (over 100 units) projects in the Oakley area. The
developer is generally agreeable to meeting the mitigation measures . as
recommended in the traffic impact study.
D. Soil: The soil on the site is Delhi-sand, a Class 3 soil. The soil is not
considered primary agricultural land according to the Contra Costa County Soils .
Atlas.
E. Previous Approvals: As mentioned above,there is presently an approval on the
site for 145 lots. This development was approved by the Board of Supervisors
on November 27, 1990. The file numbers for the previous approval was SUB
6845, 2721-RZ and D.P. 3028-87. That development also envisioned a 3 acre
park site as well as a detention basin of approximately 4.1 acres.
There are other previous applications on the site as follows:
1) MS 66-81: Which was a request to subdivide Parcel A of MS 163-77
of approximately 18.9 acres into two parcels of 13.9 acres and 5 acres.
This application was withdrawn by the applicant.
2) MS 163-77: A request to subdivide 30 acres into 3 lots. Parcel A is
part of the current subdivision; the other two lots are along Carpenter
Road. and are 5 acres each. Parcel Map for this subdivision was
recorded.
3). MS 250-72: A request to subdivide 17.4 acres into 4 parcels. The
application was denied due to creation of residential intrusion south of
Laurel. The decision was appealed and approved, but the map was
never recorded. The parcel involved in that subdivision was #034-010-
007.
� r
3
E. Other Regulatory Concerns: The site is not within a fault hazard zone. Part of
the site near Laurel Road is within the 60 dBA noise contour. It is not within _
2,000 feet of any known tiazardous waste site. A small area of the site is
within the 100-year flood zone due to the terrain on the site which is rolling
sand hills. The mitigation measures for these would be, first a noise impact
study to determine what type of wall or walls should be placed along Laurel
Road and secondly, a requirement that the small area of the site within the 100
year flood zone that zone which is rather simple to do in this case.
IV. ROAD AND DRAINAGE CONSIDERATION
The attached conditions of approval based on the April, 1991 tentative map, include
road and drainage requirements. The applicant should be fully aware of 'the County
Subdivision Ordinance Code requirements as they pertain to this development.
If it is determined that parking should be allowed along Carpenter Road (for park
access) the applicant shall be required to construct parking bays, along the Carpenter
Road frontage.
The Flood Control District purchased the detention basin site from the developer in the
spring of 1991. The purchase price was for a fully improved parcel including frontage
improvements. The following conditions of approval, therefore, require the developer
to construct full improvements along the frontage of the basin on Laurel Road and
Brown Road.
Measure "C"
This subdivision contains over 100 lots and, therefore, generates more than 100 peak
hour trips. Implementation 4-C of the County General Plan requires a traffic impact
analysis for any project which generates more than 100 peak hour trips. The traffic
impact analysis analyzes the surrounding road system and determines the levels- of
service of the intersections in accordance with Measure C (1988). In compliance with
Measure C,the General Plan includes traffic,level of service standards for intersections
in the,County that are keyed to land use types. These levels of service range from C
in rural areas, to Din suburban areas and E in central business districts. The Growth
Management element of the County's General Plan states that development cannot
occur if the traffic level of service standards are exceeded, unless the intersection is
subject to a finding of special circumstances, or the road is a .route of regional
significance, or there is a'funding mechanisms which will provide the infrastructure
- improvements needed to bring the level of service into compliance.
In the case of this development, a traffic report was done analyzing the level of service
of the nearby intersections under existing conditions and under future conditions (year
2000). The traffic report analyzed 21 intersections. All but four of these intersections
will be in compliance in the year 2000, assuming improvements programmed in the
County's Capital Road Improvement Program (GRIP) are constructed. Ten of the 21
intersections will need improvements, all but four of which are funded by the Area of
4
Benefit and programmed in the CRIP. The intersections that will not be in compliance
and the mitigation measures outlined in the traffic study needed to bring them into _
compliance, are as follows:
A. SR160/SR4
Northbound.approach off-ramp requires double right turn lanes.
B. Neroly Road/SR4
Eastbound approach requires separate right turn lane.
C. Empire Avenue/Lone Tree Way
Install a traffic signal.
D. Vasco Road/Marsh Creek Road
Install traffic signal.
The traffic report identified one other mitigation measure, which was the signalization
of the intersection of SR 4 and Lone Tree Way. However, this intersection has been
proposed for a finding of special circumstances in the General Plan and is now located
in the City of Brentwood.
As a result, in order to allow this project to move forward one of.two things must
occur: (1) the Area of Benefit would have to be revised to include funding for these
four projects, and these four projects would have to be added to the CRIP; or (2) this
project would have to contribute its fair share of the cost to construct the four
unfunded projects, in proportion to the number of units anticipated to be improved
between now and the year 2000.
The Planning Commission should consider recommending to the Board of Supervisors
to revise the Area of Benefit to include the above four unfunded projects and to include
those projects in the County's Capital Road Improvement program. - -
V. AGENCY COMMENTS
A. Oakley Municipal Advisory Council: To date no written response has been
received. The OMAC was reinformed of this project with a subsequent letter
on September 15, 1992.
B. City of Brentwood: Need traffic study indicating impacts on Long Tree Way
intersections, O'Hara and Empire intersections. The area within the City of
Brentwood limits plan notes that property to the south of the site south of
Carpenter Road is indicated as one acre minimum lots. A transition from the
6,000 square foot lots to the 1 acre lots as needed.
C. Archaeological Inventory: There is a low possibility of archaeological sites.
Further study for archaeological resources is not recommended.
5
D. Health Services Department, Environmental Health Division: The Division has
no comments on this application.
E. Contra Costa Water District: Please be advised-the U.S. Bureau of Reclamation
has an easement for a lateral 7.1, a 24 inch H-50 pipe within the proposed
subdivision. The District operates and maintains this facility and requests that
the subdivision be designed so that the relocation of the lateral 7.1 will not be
necessary.
All engineering plans and design within the U.S. Bureau of Reclamation
easement will be reviewed and approved by the Contra Costa Water District
and the U. S. Bureau of Reclamation.
F. Building Inspection Department:
1) A grading permit will be required for the earth work necessary to
develop all parcels in this subdivision.
2) Submit four copies of plans showing the existing contours, the extent
of proposed grading, drainage improvements, and general site develop-'
ment.
3) Plans accompanying the application for building permit shall show the
existing contours, the extent of proposed grading and drainage
improvements and be reviewed by the Grading Section prior to issuance.
4) Prior to issuance of building and/or grading permits in the above
subdivision, a preliminary soils investigation report prepared by a
licensed soils engineer will be required. It shall report on the ability of
the site to support the improvements -anticipated, and shall include
recommended foundation design to achieve maximum stability of the
proposed structures.
.5) A licensed soils engineer may be required to control grading operations
and to report on the ability of the site to support the improvements
anticipated.
6) Typical cross-sections of the proposed access road improvement shall
be shown on the above plans.
G. Oakley Fire Protection District: See attached letter.
H. Liberty Union High School District: See attached letter.
i
6
VI. SITE DESCRIPTION/PROPOSED PROJECT
The site is a rolling sand hills country in the'southerlyportion of"the Oakley-area. The
site fronts upon Laurel Road and Carpenter Road, and extends between the two roads.
The site is also located to the west of Brown Road. The surrounding area is a mix of
residual, rural ranchette, and agricultural uses. Several of the larger parcels have
subdivisions approved for them. Development has occurred to the north the site
across Laurel Road and is on-going to the northeast and northwest of the site. The
project as envisioned is a 220 unit development, all single family residential in nature.
There is to be a 4.1 acre detention basin located at the corner of Brown Road and
Laurel Road. There is also a proposed park area of approximately 3 acres shown on
the tentative map north of Carpenter Road. The layout of the subdivision is regular
and is designed to coordinate locations of streets with other subdivisions to the east
and to the west of the site. There have been, as noted above, previous approvals on
the site for 145 units. This subdivision is to bring the number of lots on the site to a
total of 220.
VII. STAFF ANALYSIS/DISCUSSION
The proposed use of the site is appropriate according to the General Plan for the area.
The site is designated Single Family Residential-Medium Density and .the proposed
development for 220 units is near the maximum density allowed for that.designation.
Proposed density for the project is 4.9 dwelling units per net acre. The Single Family
Residential-Medium Density designation allows 3 to 5 dwelling units per net acre.
The site plan as mentioned above, is regular in nature and staff is generally in favor of
the proposal. Staff does recommend one major change and several minor changes in
the site layout.
First of all, staff recommends that the proposed park site of 3 acres be moved to the
area to the west of the proposed detention basin. This park site of 3 acres along with
the 1.67 acre park area set aside by the neighboring subdivision, SUB 7630, along
with the detention basin would create a park area of approximately 9 t acres along the
south side of Laurel Road. As far as staff knows, the applicants on both of these
projects are agreeable and hopefully means of transferring land from the J. Patrick
Land subdivision, SUB 7630,to this site can be developed. The applicant has recently
submitted a plan showing the revised pads and lot layout.
The other minor changes staff would recommend on the layout of the site is that the
proposed cul-de-sacs called "C" Court and "D" Court rather than accessing off of the
main entrance street, which is "A" Street, have entrance off of proposed "B" Street.
7
Overall staff is in agreement with the general layout of the site. It is very typical of
many subdivisions -occurring in this area of Oakley. Staff would recommend that a
revised tentative map showing the-additional and revised layout'be submitted prior to
recording the Final Map for this site for the review and approval of the Zoning
Administrator. The revised tentative map would, of course, show the park area in a
manner acceptable to staff and layout design, and would also show the additional lots
which would be located off of "B" Street and north of Carpenter Road.
Because of the large size of the development, staff recommends that if the applicant
and the landscape and lighting district are agreeable, a small (5 - 10,000 sq. ft.) tot
lot playarea be constructed at the southwest corner of the proposed park.
The proposal, as mentioned above,is in compliance with the General Plan for the area.
Staff agrees with the comments of the Contra Costa Water District in regards to the
lateral that crosses the site. This is similar concern -and the conditions for this
development are the same as those for SUB 7630, which has a similar situation.
Staff recommend that the wall along the Laurel Road frontage of the site be properly
done subject to the review and approval of the Zoning.Administrator. This is true as
for any type of wall that runs along the projected frontage on Carpenter Road.
There is one major concern in regards to environmental issues. The project is over 100
units in size and as such requires the preparation of a traffic study per Measure C.
This traffic study was done and reviewed by the Transportation Planning staff of the
Public Works Department as well as the County Community Development Department.
The applicant has indicated that they are agreeable to most of the mitigation measures
spelled out in that report which was done for this site as well as other proposed large
subdivisions in the Oakley area. On that basis, the negative declaration for the project
was posted. The development will be required to meet the mitigation measures as
proposed by the traffic impact study.
Specifically, the applicant has agreed to do their fair share in regards to improving
State Route 160 and State Route 4 northbound approach double right turn lane, the
improvement of the State Route 4 and Neroly Road intersection, the east bound
approach to provide for a right turn lane,to improve the intersection of Lone Tree Way
and State Route 4 that would be the signalize it. To improvement Empire Road, Lone
Tree Way to help signalize that intersection and to improve Vasco Road/Marsh'Creek
Road to help signalize that. The only objection the applicant has is to be and requried
to improve the Vasco Road/Marsh Creek Road intersection as it is.very distant from
the Oakley area.
VIII. FINDINGS
Staff recommends that the following findings be adopted as the reasons for approving
this project. The findings are listed as follows:
I
8
A. The applicant intends to start construction within two and one-half years from
the effective date of this zoning change and plan approval.
B. The proposed planned unit development is consistent with the County General
Plan.
C. The residential development will constitute a residential environment of
sustained desirability and stability, it will be in harmony with the character of
the surrounding neighborhood and community.
D. The development will provide needed net income housing for the Oakley area.
IX. CONCLUSION
Based upon the above staff report, and the fact that the General Plan designates the
site area as Single Family Residential-Medium Density, and the fact that this
development is in conformance with the General Plan, staff recommends that the
Planning Commission recommend that the Board of Supervisors approve SUB 7657
together with its companion applications, 2951-RZ and D.P. 3010-91, subject to the
attached conditions of approval.
AB/aa
SUBIX/7657.A�
11/10/92
CONDITIONS OF APPROVAL FOR REZONING 2951-RZ
1. This approval is based upon the following exhibits received by. the Community
Development Department and listed as follows:
A. Exhibit A - Final development plan and vesting tentative map dated received
April 25, 1991 for 220 lots and single family residences together with a 3 acre
park area and a 4.1 drainage basin area on a 59:1-- acre site together with a
preliminary grading plan for the site on the same sheet.
B. Exhibit B - Revised plan dated received November 9, 1992 showing relocation
of park area and reorientating of "C" and "D" Courts.
2. Sewage disposal serving the property concerned with this application shall be provided
by the Ironhouse Sanitary District.
3. Water supply serving the property concerned with this application shall be provided by
the Oakley Water District.
4. Comply with the requirements of the Oakley Fire Protection District including a
provision for water supply and fire hydrants as determined by the District.
5. The total number of lots for this development shall not exceed 220.
6. With this approval, the previously approved P-1 district (2721-RZ, D.P. 3028-87, and
SUB 6845) are null and void.
7. The approval of this rezoning shall run with and be concurrent with the length of
approval for the accompanying final development map and tentative subdivision map.
AB/aa
- SUBIX/7657C.AB
11/2/92
OAKLE T �
FIRE PROTECTION DISTRICT
P �
P. O.Box 207 p'
Oakley, California 94561
Business Phone (415)625-2119
June 3 1991 - ____ �0
r.
Contra Costa County
Community Development Department
651 Pine Street, North Wing - 4th Floor
Martinez, CA 94553
ATTN: Art Beresford
SUBJECT: Subdivision 7657 [30.10-91]
Laurel Wood II
S116300PD00
Laurel Road
Oakley, CA
Dear Mr. Beresford:
We have reviewed the Development Plan, dated May 17, 1991, for
the subject project. The application is to allow 220 single
family homes with park on 59 acres.
This project is subject to fire and life safety requirements of
the Uniform Fire Code, as adopted by Contra Costa County
Ordinance 89-71,. and applicable provisions of the *California
State Fire Marshal's regulations. If this project is approved,
we request that the following be included as Conditions of
Approval:
SPECIFIC CONDITIONS:
1. The developer shall provide an adequate and reliable
water supply for fire protection with a minimum fire flow
of 1,500 GPM. Required fire flow-shall be delivered from
not. more than two (2) hydrants flowing simultaneously
. while maintaining 20 pounds residual pressure in the
main. [10.301(c) UFC]
STANDARD' CONDITIONS:
2. The developer shall provide access roadways with
all-weather driving surfaces of not less than 20 feet of
unobstructed width, and not less than 13'- 611 of vertical
clearance, to within 150 feet of all portions of the
exterior walls of every building. Access roads shall not
exceed 20% grade, shall- have a minimum outside turning
radius of 42 feet, and must be capable of supporting the
imposed loads of fire apparatus (20 tons) .
[10.207 (a) UFC]
3. Dead-end fire department access roads in excess of 150
feet long shall be provided with approved provisions for
the turning- around of fire department apparatus.
(10.207 (a) UFC]
AT C C
C.C.Co. Com. Dev. Dept.
AB6-3
June 3 , 1991
Page 2
4: Access' roads_--and`.hydrants shall be installed and in
_ . : service .prior to combustible construction.
[10.301(e) UFC]
5. Access roads meeting the following requirements shall be
provided prior to beginning any combustible construction;
a. . Access roads shall be those roads which are shown
on improvement plans approved by the Contra Costa
County Public Works Department.
b.. - Surface shall be roadbase capable of supporting
fire apparatus (2 0 tons) .
c: Curb & Gutter shall be installed.
d. Roads shall front the structure they provide-
access
rovideaccess to.
e. The .roads -shall be directly accessible from an
approved public street.
6. The developer shall provide illuminated addressing
..located:on all buildings in such a manner as to be
.plainly visible and.-legible from the street or road
fronting the property. [10.208 UFC]
. 7. Where open space is to be maintained for public or
private use, the developer shall provide access into
_these.:_areas :from public ways. These access ways shall be
a minimum 16-foot width to accommodate fire department
equipment. ,
All .open space.s,: when left in their natural state,. shall
meet the Fire District's weed abatement standards.
[10.207 (m) & 88.104 UFC]
8. The developer shall be required to contribute Fire
Facility,_Fees to mitigate operational costs associated
with increased service demands throughout the Fire
District:. Fire Facility ,Fees are._currently set at the
rate of $4.80.00 per individual residential dwelling unit.
The.developer . shall: pay all -required Fire_Facility. Fees
prior .to the. :issuance. of .any building.permit: .
9. The..developer .shall . submit- two (2). ..sets ..of Improvement
Plans-_to .the-Fire District , for._review and comment prior
to construction. . . (2.20.6 UFC]
The conditions-.specified above are intended to ensure that the
project is in::general.: compliance with applicable fire codes and
regulations 'enforced by-the Oakley Fire Protection District.
Review of subsequent plan submittals, required above, may result
in additional requirements.
C.C.Co. Com. Dev. .Dept.
AB6-3
June 3, 1991
Page 3
Projects beginning construction more than one (1) year from
approval may also be subject to additional requirements. It is
requested that a copy of the Conditions of Approval for this
project be forwarded to our office when complied and adopted by
your agency.
If you have any questions regarding this review, please contact
the undersigned at (415) 757-1303 between the hours of 8:00 -
9:00 a.m. and 4:00 - 5:00 p.m. (Monday through Friday) .
Sincerely,
JOE TOVAR
Fire Chief
By:_
BILL BAN ITZ
Fire Inspecto
JT:BB:ap
cc: . Bellecci & Associates
Camray Development
C.C.Co. Building Dept.
File S116300PD00
Land Plannzn g-- Consultants INC.
239 MAIN STREET,SUITE E ■ PLEASANTON, CA 94566, ■ (415)846-7007 ■ FAX:(415)846-5314
Date: July 3, 1991 � '^C
ele CP
Art Beresford
Community Development Department c-?
%..
651 Pine Street
Martinez, CA 94553
RE: Subdivision 7657
Dear Mr. Beresford,
The Liberty Union High School District is concerned with its ability to support additional growth
and is requesting your support in conditioning future development projects to participate in a
funding program to finance new school facilities.
The Liberty Union High School District has one high school which services the City of Brentwood
and its sphere of influence, a portion Qf the City of Antioch and its sphere of influence and the
surrounding uniricorporated communities of Oakley, Byron, Knightsen, Discovery Bay and Bethel
Island.. The existing high school is reaching capacity and the need for an additional school is
inevitable. The Impact Fees imposed on developers fall far short of the funds required to finance
new facilities resulting in a need for alternative funding methods. The District cannot depend on
State Funding Programs or voter supported Bond Issues to generate the necessary funds therefore
other measures are being taken to insure adequate facilities.
The Liberty Union High School District would like to see all new developments conditioned to
participate not only in the Impact Fee requirement but also in a Mello-Roos district or similar type
capital facilities program. Without an alternative funding program the District cannot assure that
adequate capacity will be available for future projects. .
The District would like to see the Conditions Of Approval for future developments include a
statement such as: "construction of residential units shall not commence until the Liberty Union
High School District indicates to the Planning Director that adequate school capacity for the
students generated by the project be available at the time of occupancy". This would insure the
District sufficient funding to support required capacity for the students being generated by new
development projects.
It is the District's desire to condition new developments, within the Liberty Union High School
District,in such a way to insure quality education and adequate school facilities. The District trusts
that-you will support this matter. If you have any comments or questions please do not hesitate
to Ball.
Sincerely,
,-4 .
Justine Perault
District Consultant
cc: Phil White, LUHSD
Serving Public Agencies
OAKLEY MUM,CIP AL ADVISORY COUNCIL
A COSH P.O. BOX 212 . OAKLEY CA 94561
t�- c ,
HOWARD'HOBBS :;';t'SUI'�Il i.
ENRICOCINOUINI E1r��I :aMENT pEpj
0
DENNIS NUNN
ARSENI0 ESCUDERO
SPENCER HOUGH
VICTORIA RYAN
HEIDI MAYER
October 26 , 1992 '
File # : 7657
Applicant: Bellecci & Associates
Owner: Camray Development & Construction Company
1 . Masonry fences required on major thoroughfare. (Laurel
Road.) Masonry fence to meet lighting and landscape
guide for Oakley. Request builder to coordinate design
with OMAC subcommittee.
Secondary street fences are required to have pillars
every eight feet. All side and rear fences to have
steel posts every sixteen feet.
2 . Front yard landscaping to be provided on all developments .
All plantings will be drought tolerant.
3 . All plantings will be drought tolerant plants. All areas
less than four foot width will be filled with baumite.
4 . Applicant required to move park to a location adjacent
to flood control basin. This was an agreement reached
during OMAC hearings . Fencing shall be chain link fronting
on Laurel. Further request applicant or flood control
to continue chain link fence to surround the Detention
Basin, Laurel and Brown Road.
5 . All roof material. will be fire retardant.
6 . Oak Trees - all existing Oak trees will be preserved.
7 . Twenty-five (25% ) of the lots will have side access for
RV parking. - -
8 . All subdivisions will be required to join the applicable
service districts .
9 . Signs advertising developments will not be placed in
the road right-of-way. Signs placed on private property
must have a written agreement with the property owner.
10 . Work hours will not commence before 7 :00 a.m. or exceed
I
2 -
5 :00 p.m. Monday through Fridays . Saturday hours will
be from 8 :00 a.m. through 5x00 p.m.' No work on Sundays
or holidays.
11 . Direct: Applicant to revised map to include meandering
sidewalks into main entrance to subdivision. Plus,
some type of monument to identify subdivision and -park
Park name to be identified by Park subcommittee.
�Jc G�
Land lanning Consuhants INC.
239 MAIN STREET,SUITE E ■ PLEA SANTON, CA 94566, ■ (510)846-7007 ■ FAX:(510)846-5314-
Q Of
S
1
November 13, 1992 ccs, cS►
Arthur Beresford
Project Planner
Community Development Department
Contra Costa County
651 Pine Street
4th Floor, North Wing
Martinez, CA 94553-0095
Re: Bellecci._& Associates
Cumray Development &Construction
approximately 39'acies - Oakley
Dear:Mt. Beresford:
On behalf of the Liberty Union High School District we are providing our response as to
rezoning, approval of a final development plan and approval of a vesting tentative map of the
referenced property.
The high school district serves the Brentwood Union, Oakley Union, Byron Union and
Knightsen Elementary School Districts.
The project is located in the area of Laurel Road, Brown Road and Carpenter Road in Oakley.
The development calls for 220 single family residential units. According to the district's Student
Generation Factor, the district anticipates 42 high school students from this project. The high
school that would currently serve this development is Liberty High School. Based on the 92-93
school year, the school has an enrollment of 1,885 students, which is 193 students short of
capacity.
The district is presently working on plans to construct their second high school. The school site
is located.at the corner of Neroly Road and O'Hara Avenue in Oakley. The school will have
a capacity of 2,200 students when completed. The'district anticipates opening the school in
19.95/96 pending available funds.
Serving Public Agencies
J
November 13, 1992
Page two
Arthur Beresford
The district is anticipated to experience an enrollment increase of 250-300 students per year for
at least the next five years. Based on these projections, it can be seen that the need for a second
high school is crucial for providing adequate school facilities.
In order for the district to provide adequate facilities to new students, the district collects
developer impact fees on new construction. These fees are significant, however fall short of the
required funds. The district has an application pending for state funding. Presently, the state
school funding program has more than a $6 billion backlog in application, so the likelihood of
the district to receive funds is uncertain. The district has also looked at General Obligation
Bonds. However, recent local bond'elections indicate inadequate public support for school bond
measures.
Recently, the county approved a General Plan Amendment for School Facilities. The
Amendment is designed to address the changing needs for educational facilities generated by the
growth in population. An implementation measure in the amendment reads, "Work with the
interested school districts to ensure that new development contributes, to the extend allowable
under State law, its fair and full share of the cost of additional facilities which are necessary,
irrespective of jurisdictional boundaries.
Consequently, the school district would like this project to join with other projects in providing
its fair share of school facility costs necessary to provide adequate educational facilities to the
new students.
Sincerely,
Kimberly Wood
District`Consultant
cc: Philip White - Liberty Union High School District
:rte
CL
— ls
--,• is
s /LT 1VwwV
t
Q
11 L
Ix
f
?' is .
eL i
* INN-
dd
lop
VII
s3• t
• `� 8
a
i
• F 4
1 ^T L
1, },'!' y0: ,•, �i'�� , , ^7r
�t
it'•��}l e4 t,~ /^'�r~�iisi F �'_Ni� .�ttM!t)}7�# , • —
yj
1
i•;5•;, .. R, r�dti+ni ) 'T f1wl7D(67iw 1 Q+ r a
iN i^ v
N f -
iii•-t�.,Mil. (T"fT. �.f.f ' _-_.....-._'__- --_-- rlwmw-�ow
_
.',�,f..• • � .-IC� OHO, I
f: b
t—
116 Swvl QVINUO
r-1�4.
•
117-
:. _- -_-- ___ -- ----- itS ' !!vr� x
• til"#lo' i'i��'tiGT�'•+ u �.- r + - 1 '�-` �`
-7K
7 f ��`�►. ..'-; '/`Y ',�y, x".c ,,t}J "vas. -.
A p s
A.
kali arnia EnirortmentalQualityAct
f
NOTICE OF
Completion of Environmental Impact Report Negative Declaration of Environmental Significance
>::`CONTRA COSTA COUNTY COMMUNITY DEVELOPMENT 'DEPARTMENT
651'PINE STREET NORTH WING-4TH FLOOR MARTINEZ,CALIFORNIA 94553-0095
2031 Art Beresford
Telephone:` (415) 646- Contact Person
r .
Project Description and Location:
EELLECCI & ASSOCIATES (Applicant) - CAMRAY DEVELOPMENT & CONSTRUCTION
(Owner), County Fie #2951-RZ: The applicant requests approval to rezone 59 acres from
:` anned Unit-District (P-1) for 145 lots and single family residences, a 3 acre park and a 4.1
acre detention basin to Planned Unit District (P-1) for 220 lots and single family residences, a
3'acrepark and a 4.1 acre detention basin.
ELLECCI & ASSOCIATES (Applicant) - CAMRAY DEVELOPMENT & CONSTRUCTION
<= (Owner), County File #3010-9i:. The applicant requests approval of a final development plan
construct 220 single family residences.
SUBDIVISION 7657 .(Applicant: .Bellecci & Associates) (Owner: Camray Development &
- Construction: The applicant requests approval of a vesting tentative map to divide 59.acres
into 220.single family lots with a.3 acre park area and a 4.1 acre detention basin..
Subject property,for the above referenced projects consists of five descriptive parcels with
frontage:on Laurel Road,_Brown Road and Carpenter Road, In the Oakley area. The site fronts
for:1 Q07:feet on the south side of Laurel Road,approximately 870 feet east of Empire avenue,
#or approximate{y,.638 feet on the west side of Brown Road,just'south of Laurel Road,and for
:1.585 feet on the,north side of Carpenter Road, 1.320 feet east of Empire avenue. Site contains
U9 acres of land_more or.less. (P-1.) (ZA: H-24,H-25,J-244-25) (CT 3020) (Parcel#034-010-
:r:';406,=007,-017,-018 and 034-020-006)
THIS IS,A NOTICE OF STAFF'S DETERMINATION OF THE ENVIRONMENTAL IMPACT OF THE
ABOVE PROJECT. YOU.WILL BE FURTHER NOTIFIED OF THE PROJECT'S HEARING DATE
AT E E YOU CAN COMMEl T ON THt� D ER�1lIINITtt !AND T�E 1 ROJECT IF YQl��NISH.
nvironmental Impact eport or u i Ica ion or egative ec aratlon Is oval a e
,for:review at the address below: <
Contra Costa.County Community Development Department j
4th Floor, North Wing, Administration Building
V 651 Pine Street
Martinez, California
Review'Period for Environmental Impact Report or Negative Declaration:
thru
By
AP 9 R 12/89 rnry1M11-1Y%1