HomeMy WebLinkAboutMINUTES - 07141992 - 2.4 TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: JULY 14, 1992
SUBJECT: Authorize Bid Advertisement for Phase One Environmental Construction at Contra Costa
County-Byron Airport under AIP Project #3-06-0008-05
SPECIFIC REQUEST(S)OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION
I. Recommended Action:
AUTHORIZE Public Works Director to advertise for bids for Phase One environmental construction
at Contra Costa County-Byron Airport. Advertising for this project will commence on July 14, 1992,
and bid opening has been scheduled for August 13, 1992.
II. Financial Impact:
Estimated cost of this portion of the project is $456,000 of which 90% will be funded by the Federal
Aviation Administration. The local share is estimated to be $45,600 which will be paid for out of the
Airport Enterprise Fund utilizing a portion of a loan from the California Department of Transportation
Division of Aeronautics which has already been received.
III. Reasons for Recommendations and Background:
A fair amount of environmental mitigation is required of this project in order to obtain the Corps of
Engineer's 404 permit. To expedite the construction, the environmental work has been broken into
two phases. The first phase consists of constructing a replacement pond at the Byron Boys' Ranch
and the wetlands construction. The second phase, which will complete environmental construction,
will be included as a part of the paving project for the new runways next spring.
Continued on Attachment: SIGNATURE.
_RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON JUL 14 APPROVED AS RECOMMENDED V OTHER
VOTE OF SUPERVISORS
UNANIMOUS (ABSENT )
AYES: NOES:
ABSENT: ABSTAIN:
I hereby certify that this Is A true and correct copy Y
an action taken and entered on the minutes of the
HEW:rs Board of Supe rs n the date shown.
c:\14.t7 ATTESTED: 14 1997
®'spa
PHIL BATCHELOR,Clerk of the Board
Orig Div: Airports of Supervisors and County Administrator
cc: County Administrator
Public Works Director By Deputy
^.- � �--—- -,deputy
Public Works Accounting
Auditor/Controller
Aviation Advisory Committee
Federal Aviation Administration
Hodges & Shutt
SUBJECT: Authorize Bid Advertisement for Phase One Environmental Construction at Contra Costa
County-Byron Airport under AIP Project #3-06-0008-05
July 14, 1992
Page 2
Construction inspection will be provided by Hodges & Shutt through a subcontract with the biological
consultant who developed the plans. Hodges & Shutt will be responsible for overall inspection and testing
and will provide in-off coordination of construction activity. Hodges & Shutt shall prepare the weekly
FAA progress reports and the monthly FAA. pay estimates. This project does not contain any airfield
construction; therefore, FAA's Advisory Circulars are not applicable. Additionally, the construction does
not affect the continued operations at the existing Byron Airport. For the most part, CALTRANS
specifications have been used for earthwork, fencing, and other minor items. The remainder of the
Specifications have been derived by the biological consultant and are tailored to fit the specific condition
in the Corps permit. All work called for in this contract are essentially earthwork in nature and there
should be an adequate number of bidders in the local area.