HomeMy WebLinkAboutMINUTES - 06021992 - 1.28 i 1 TO: BOARD OF SUPERVISORS, AS 'THE GOVERNING BODY OF THE CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT FROM: J. MICHAEL WALFORD, CHIEF ENGINEER DATE: June 2, 1992 SUBJECT: Approve Addendum No. 1 for the West Antioch Creek Interim Flood Control Project Project No.: 7579-6D8538-91 SPECIFIC REQUEST(S) OR RECOMMENDATIONS) &BACKGROUND AND JUSTIFICATION I. Recommended Action: APPROVE prior issuance of Addendum No. 1 for the West Antioch Creek Interim Flood Control Project. II. Financial Impact: The revised estimated contract cost is $1,552,000, funded by Drainage Area 55 (100%). III. Reasons for Recommendations and Background: On April 28, 1992 the Board of Supervisors approved plans and specifications for this project. This addendum is required for the following reasons: eSome of the quantities shown on the plans, in the Proposal and in the Notice to Contractors have been revised. *The special provisions have been modified to require epoxy-coated reinforcing steel across the construction joints in the concrete channel and wingwalls as recommended by the California Department of Transportation Materials Lab for concrete construction in a marine environment. *Pay clauses for filter fabric and for temporary gates were added to the special provisions to ensure these items of work are adequately covered. Continued on Attachment: SIGNATURE: _Av/eaatt�� _ RECOMMENDATION OF COUNTY ADMINISTRATOR _ RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON JUN 2 1992 ' APPROVED AS RECOMMENDED v1 OTHER VOTE F SUPERVISORS UNANIMOUS (ABSENT 1 AYES: NOES: ABSENT: ABSTAIN: 1 hereby certify that this IS a true and correct copy 3f an action taken and entered on the minutes of the JRB:DR:jlg Board of Supery rs The date shown. c\BO:boi.t6 N 1992 ATTESTED: , �.�.. PHIL BATCHELOR,Clerk of the Board Orig. Div: Public Works (Design Division) of Supervisors and County Administrator cc: County Admin: E. Kuevor Auditor-Controller By ��' ' ` tir Deputy PW Accounting Construction Approve Addendum No. 1 for the West Antioch Creek Interim Flood Control Project June 2, 1992 Page 2 •The special provision for concrete structures was modified to ensure adequate compressive strength for the concrete channel and wingwalls is required. eThe Typical Sections and Details sheets of the plans were revised for clarity. IV. Consequences of Negative Action: Failure to correct the plans, special provisions, Notice to Contractors and Proposal may cause confusion to bidders, resulting in higher bid prices.