Loading...
HomeMy WebLinkAboutMINUTES - 04071992 - 1.36 TO: BOARD OF SUPERVISORS AS THE BOARD OF DIRECTORS, CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: APRIL 7, 1992 SUBJECT: STATUS AND EXPENSE REPORT FOR THE FIRST AND SECOND QUARTERS (JULY - DECEMBER) OF FISCAL YEAR 1991-92, CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT. SPECIFIC REQUEST(S) OR RECOMMENDATION($) &BACKGROUND AND JUSTIFICATION I. Recommended Action: ACCEPT the Canyon Lakes G.H.A.D. Quarterly Status and Expense Report for the First and Second Quarters, Fiscal Year 1991-92. II. Financial Impact: None. III. Reasons for Recommendations and Background: During the first and second quarters the District continued investigation nd installation of various drainage systems to more properly drain some areas of sub-surface and surface water to increase soil stability. The major work efforts were on the ,maintenance and installation of horizontal drains and drainage structure repair in various slope areas. The construction cost of repairs for the first quarter ($29,036.40) are approximately 18 percent of the annual budget, and the total expenses through this quarter ($60,149.91) were approximately 20 percent of the total annual budget. Continued on Attachment: X SIGNATURE: RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON APPROVED AS RECOMMENDED V OTHER VOTE OF SUPERVISORS UNANIMOUS (ABSENT ) AYES: NOES: ° ABSENT: ABSTAIN: FL:sj t hereby certify that this Is a true and correct copy of c:BOGHAD7.T4 an action taken and entered on the minutes of the 3oard of Supervisors on the date shown. Orig. Div: Public Works (E/S) :ATTESTED: APR 7 1992 ' -� PHIL BATCHELOR,Clerk of the Board Cc: of Supervisors and County Administrator By Deputy a Canyon Lakes April 7, 1992 Page Two ° The construction costs for the first two quarters ($44,791.43) are approximately 28 percent of the annual budget, and the total expenses through the second quarter ($98,411.98) were approximately 33 percent of the total annual budget. IV. Consequences of Negative Action: None. CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT REPAIR & IMPROVEMENT PROJECTS 1991-1992 FISCAL YEAR ESTIMATED BUDGET ACTUAL EXPENSES PROJECT JUL '91-JUN'92 JUL '91 - SEP '91 1. Revegetation (6 selected areas) $ 30,000 $ 4,400.54 2. Corrective Grading 23,000 0 3. Horizontal Drain Maintenance 3,000 6,980.15 4. Repair & Maintenance of B-58 Drainage Ditch System 12,000 0 5. Inspection & Maintenance of Existing repairs 8,000 0 6. Repair & Maintenance of HOA Structures 33,000 939.22 7. Inspection and maintenance of subdrains 12,000 120.00 8. Additional Horizontal Drains 15,000 12,640.00 9. Miscellaneous 22,000 3,956.49 TOTAL $158,000 $29,036.40 CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT EXPENSE SUMMARY 1991-1992 FISCAL YEAR A. PROJECT INCOME FY '91-'92 1. Balance (Reserve) brought forward $477,500 2. Annual Income via Assessments: 265,000 743 Single Family Detached 469 Townhouses 2,576 Condominiums/ Rentals 100,000 square feet Commercial 3. Estimated Interest Earnings 22,000 TOTAL ESTIMATED FUNDS: $764,000 ESTIMATED BUDGET ACTUAL EXPENSES B. PROJECTED EXPENSES (FY 1991-1992) JUL '91-SEP 191 1. General Manager $ 20,000. $ 1,875.00 2. Engineering Geologist and Geologist Assistant 55,000. 9,114.00 3. Support Services (i.e., office space, office equipment, office staff and vehicles) 0.* 0. 4. a) Repair, maintenance and improvements (as per approved Repair, Maintenance and Improvement Program.) 158,000. 29,036.40 b) Construction Administration 25,000. 6,366.75 5. Legal, accounting and insurance 5,000. 0. 6. Professional Soils and Geotechnical Consulting 15,000. 8,757.76 7. County staff services 7,000. 0. 8. Assessment documents preparation 10,000 5,000.00 Total Expenses: $295,000 $60,149.91 Reserve: 469,000. Total Costs: $764,000. *Included in line items 1, 2, and 4(b). CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT REPAIR & IMPROVEMENT PROJECTS 1991-1992 FISCAL YEAR ESTIMATED BUDGET ACTUAL EXPENSES PROJECT JUL '91-JUN'92 JUL '91 - DEC '91 1. Revegetation (6 selected areas) $ 30,000 $11,437.23 2. Corrective Grading 23,000 780.00 3. Horizontal Drain Maintenance 3,000 10,000.00 4. Repair & Maintenance of B-58 Drainage Ditch System 12,000 0 5. Inspection & Maintenance of Existing repairs 8,000 0 6. Repair & Maintenance of HOA Structures 33,000 939.22 7. Inspection and maintenance of subdrains 12,000 120.00 8. Additional Horizontal Drains 15,000 12,640.00 9. Miscellaneous 22,000 8,874.98 TOTAL $1589000 $449791.43 CANYON LAKES GEOLOGIC HAZARD ABATEMENT DISTRICT EXPENSE SUMMARY 1991-1992 FISCAL YEAR A. PROJECT INCOME FY '91-'92 1. Balance (Reserve) brought forward $477,500 2. Annual Income via Assessments: 265,000 743 Single Family Detached 469 Townhouses 2,576 Condominiums/ Rentals 100,000 square feet Commercial 3. Estimated Interest Earnings 22,000 TOTAL ESTIMATED FUNDS: $764,000 ESTIMATED BUDGET ACTUAL EXPENSES B. PROJECTED EXPENSES (FY 1991-1992) JUL '91-DEC 191 1. General Manager $ 20,000. $ 4,000.00 2. Engineering Geologist and Geologist Assistant 55,000. 20,751.00 3. Support Services (i.e., office space, office equipment, office staff and vehicles) 0.* 0. 4. a) Repair, maintenance and improvements (as per approved Repair, Maintenance and Improvement Program.) 158,000. 44,791.43 b) Construction Administration 25,000. 12,461.75 5. Legal, accounting and insurance 5,000. 0. 6. Professional Soils and Geotechnical Consulting 15,000. 11,407.76 7. County staff services 7,000. 0. 8. Assessment documents preparation 10,000 5,000.00 Total Expenses: $295,000 $98,411.94 Reserve: 469,000. Total Costs: $764,000. *Included in line items 1, 2, and 4(b).