TO: BOARD OF SUPERVISORS AS THE GOVERNING BODY OF THE CONTRA COSTA
COUNTY FLOOD CONTROL AND WATER CONSERVATION:DISTRICT
FROM: J. MICHAEL WA, LFORD, CHIEF ENGINEER
DATE: April 28, 1992
SUBJECT: Approving Plans and Specifications and Advertise for bids for the West Antioch Creek
Interim Flood Control Project.
Project No. 75719-6D8538-91.
Specific Request(s) or Recommendations) & Background & Justification
I. RECOMMENDED ACTION:
�I
APPROVE the Plans and Specifications for the Project and
ADVERTISE for bids to be received on Thursday, May 21, 1992, at 2:00 p.m.
DIRECT the Clerk of the Board to publish the Notice to Contractors in accordance with Section
21191 of the Public Contract Code, and
II. FINANCIAL IMPACT:
The estimated contract cost of the project is $1,300,000, funded by Drainage Area 55 (100%).
III. REASONS FOR RECOMMENDATION/BACKGROUND:
The project is the first phase of needed improvements to West Antioch Creek. Improvements
must be constructed, downstream of 10th Street prior to improving the upstream reaches.
Construction of this phase facilitates the City of Antioch's Fourth Street widening project which
will fill in part of the existing creek.
The Chief Engineer has filed with the Board of Supervisors the Plans and Specifications for the
project. OF
l'
Continued on Attachment: x SIGNATURE:
_ RECOMMENDATION OF COUNTY ADMINISTRATOR
RECOMMENDATION OF BOARD COMMITTEE
APPROVE _OTHER
SIGNATURE(S):
j,
ACTION OF BOARD ON APR 2 8 1992 APPROVED AS RECOMMENDED OTHER
Il
I
VOTE OF SUPERVISORS
✓ UNANIMOUS (ABSENT
AYES: NOES:
ABSENT: ABSTAIN:
JRB:BN:jlg
c\BO:bo28b.t4 l hereby certify that this is a true and correct copy Y
an action taken and entered on the minutes of the
Orig. Div: Public Works (Design Division) Board of Supervisors on the date shown.
cc: County Administrator ATTESTED: APR 2.8 1992 , Q�
Attn: E. Kuevor PHIL BATCHELOR,Clerk of the Board
0 of Supervisors and my Administrator
Auditor-Controller
PW Accounting By
Construction I!
Community Development
Approving Plans and Specifications and Advertise for bids for the West Antioch Creek Interim Flood
Control Project
April 28, 1992
Page 2
The general prevailing rates of wages, which shall be the minimum rates paid on this project, have been
filed with the Clerk of the Board and copies will be made available to any interested parry upon request.
The Board reviewed and approved the project on April 23, 1985 and certified that the Final
Environmental Impact Report for the project was completed in compliance with the California
Environmental Quality Act, that the Final EIR was presented to the Board and the Board reviewed and
considered the information contained in it, and found that the project will have certain environmental
effects and adopted the findings and mitigation measures expressed in Planning Commission
Resolution 18-1985 which will mitigate those effects.
IV. CONSEQUENCES OF NEGATIVE ACTION:
If the project is not approved for advertising, it will not be constructed.