HomeMy WebLinkAboutMINUTES - 03241992 - 1.55 TO: BOARD OF SUPERVISORS FROM: EAST COUNTY REGIONAL PLANNING COMMISSION DATE: MARCH 24, 1992 SUBJECT: REVIEW FUNDING OF FRONTAGE IMPROVEMENTS ALONG DETENTION BASINS IN THE OAKLEY AREA ; Drainage Area 30A Project No.: SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION I. Recommended Action: DIRECT the Engineer of the Flood Control District to revise the Drainage Area 30A Plan to include the construction of frontage improvements for the easterly detention basin on Laurel Road. II. Financiallmpact: If the Drainage Area fees don't cover the cost of the frontage improvements, then some other source of funding will have to be found, which could impact other County funds such as the Road Fund. III. Reasons for Recommendations and Background: At their first meeting in 1992, the East County Regional Planning Commission approved subdivision 7667, located on the south side of Laurel Road opposite the easterly detention basin in Drainage Area 30A, between O'Hara Avenue and Rose Avenue in the Oakley area. The Planning Commission was concerned about the funding program for the ultimate improvements along Laurel Road. It was noted that there are some segments of Laurel Road that will not be able to be funded through the development of fronting properties, such as where the canal abuts the road, where property has already been developed, and also along the frontage of the detention basin. Continued on Attachment: SIGNATURE: _ RECOMMENDATION OF COUNTY ADMINISTRATOR _ RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON MAR 2 4 1992, APPROVED AS RECOMMENDED OTHER r VOTE OF SUPERVISORS I/ UNANIMOUS (ABSENT 1 AYES: NOES: ABSENT: ABSTAIN: i hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the RMA:cI Board of Superviso r ion�he�at�ngwn. c:B024.t3 ATTESTED: MOdi� J 1 Orig. Div: Public Works (R/E) PHIL BATCHELOR,Clerk of the Board of Supervisors and County Administrator cc: Accounting 'n Flood Control1 ey y �jQ„� �a,Q�a,� Deputy Engineering Services CAO Community Development County Counsel 1 Review Funding of Frontage Improvements Along Detention Basins in the Oakley Area March 24, 1992 Page Two III. Reasons for Recommendations and Background(cont): There are two detention basins on Laurel Road; one near Brown Road and one to the east opposite Subdivision 7667. The Planning Commission was particularly concerned about funding the frontage improvements along the easterly detention basin. They recommended that the Board direct the Flood Control District to review the fee structure of Drainage Area 30A, which Subdivision 7667 drains into, and determine if there would be sufficient revenue generated to construct all of the improvements on the adopted drainage plan plus the frontage improvements along the basin on Laurel Road. If the review revealed that there would not be sufficient revenue to fund all of the drainage improvements plus the frontage improvements, then the fee should be revised to provide sufficient funds to do so. In either event, the Drainage Area should be amended to include the construction of frontage improvements along the Laurel Basin as part of the Drainage Area;Plan. The frontage improvements for the westerly basin, located on Laurel Road at Brown Avenue, were included,in the:purchase price for the basin property. The developer of the adjacent property, who was the original owner of the basin site, is required to construct the frontage improvements as a part of his development. IV. Consequences of Negative Action: There would be no study performed to determine if there was sufficient funds in the Drainage Area to construct the frontage improvements. The Drainage Area Plan would not be revised to, include the installation of frontage improvements along the detention basin.