HomeMy WebLinkAboutMINUTES - 06041991 - 1.2 TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: June 4, 1991 SUBJECT: Approving Plans and Specifications for Pleasant Hill Road Median Barrier Project No.: 0662-6112548-90, Lafayette Area. CP# 89-89 and CP# 91-37 SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION I. Recommended Action: APPROVE the Plans and Specifications for the project and ADVERTISE for bids to be received on Wednesday, July 3, 1991, at 2:00 p.m. DIRECT the Clerk of the Board to publish the Notice to Contractors in accordance with Section 20392 of the Public Contract Code, and FIND, on the basis of the initial study and all comments received, that there is no substantial evidence that the project will have a significant effect on the environment, ADOPT the Negative Declaration, and DIRECT the Director of Community Development to file a Notice of Determination with the County Clerk. DETERMINE that the turnaround portion of the project is a CEQA Class 2c Categorical Exemption, and DIRECT the Director. of Community Development to file a Notice of Exemption with the County Clerk. DIRECT the Public Works Director to arrange for payment of a$50.00 handling fee to the County Clerk for filing the Notices of Exemption and Determination. Continued on Attachment: X SIGNATURE: /X/ A09: �640&dw _ RECOMMENDATION OF COUNTY ADMINISTRATOR _ RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON JUN 4 1991 APPROVED AS RECOMMENDED X OTHER _ VOTE OF SUPERVISORS >_ UNANIMOUS (ABSENT SC,, AYES: NOES: ABSENT: ABSTAIN: BN:drg I hereby certify that this is a true and correct copy of c\BO:4.t6 an action taken and entered on the minutes of the Board of Supervisors on the date shown. Orig. Div: Public Works (Design Division) ATTESTED: JUN 4 1991 cc: GMEDA Director PHIL BATCHELOR,Clerk of the Board County Admin.: E. Kuevor of Supervisors and unty Administrator Auditor-Controller Community Development PW Accounting By —' 'Deputy Construction Road Engineering-H. Ballenger �ppr6tring Plans and Specifications for Pleasant Hill Road Median Barrier �.Z June 4, 1991 Page Two II. Financial Impact: The estimated contract cost of the project is$231,400, funded by the Federal Hazard and Safety program (78%) and local road funds (22%). III. Reasons for Recommendations and Background: The project consists of installing a concrete median barrier on Pleasant Hill Road north of Rancho View Drive to replace an existing metal beam guardrail. This will increase safety at a curve following a steep grade. To mitigate concerns from the public, a turnaround was added to the project. This turnaround was not addressed in the initial study. The project has been determined to be in compliance with the General Plan and the turnaround portion of the project is exempt from CEQA because it is a reconstruction of an existing facility involving no expansion of use per Section 15302 of CEQA guidelines. A Negative Declaration of environmental significance pertaining to this project was published November 9, 1989, with no protest, and the Board has considered the negative declaration together with all comments received during the public review period. The project has been found to.be de minimis in its effect on the environment and is exempt from the $1,250.00 Fish and Game filing fee. The Public Works Director has filed with the Board of Supervisors the Plans and Specifications for the project. The general prevailing rates of wages, which shall be the minimum rates paid on this project, have been filed with the Clerk of the Board and copies will be made available to any interested party upon request. IV. Consequences of Negative Action: If the project is not approved for advertising, it will not be constructed.