Loading...
HomeMy WebLinkAboutMINUTES - 06251991 - 1.6 1 . 6 BOARD OF SUPERVISORS, AS THE GOVERNING BOARD OF THE CONTRA COSTA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT Adopted this Order on June 25, 1991, by the following vote: AYES: Supervisors Fanden, Schroder, '_McPeak, Torlakson & Powers NOES: None ABSENT: None ABSTAIN: None SUBJECT: Award of Contract for the Drainage Area 30A, Line A Project in the Oakley area. Project No. 7557-6D8448-88 Engineer's Estimate: $303,807.00 Bidder Total Amount Bond Amounts Floyd Johnston Const. Co., Inc. $260,564.95 Payment: Brentwood, CA $130,282.48 Performance: $260,564.95 Joe Foster Excavating, Inc. Livermore, CA Delta Excavating, Inc. Brentwood, CA Wm. G. McCullough Const. Co., Inc. Antioch, CA A. Teichert & Son Stockton, CA The above-captioned project and the specifications therefor having been previously approved, and bids having been duly invited and received by the Chief Engineer; and H & K Grading Contractors, Inc. ("H & K"), which submitted a bid. of $246,904.25, having inadvertently failed to fill in one bid item, having timely notified the County in writing of such clerical mistake as required by law, and having requested to be relieved of its bid; and The bidder listed first above ("Floyd Johnston") having submitted.the lowest monetary bid which is $4,883.05 less than the next lowest bid; and The Board having considered written and oral presentations from District staff; and The Board having evaluated all of the documentation of the effort by Floyd Johnston to comply with the goals and requirements of the District's Minority and Women Business Enterprise Program; and . The Chief Engineer recommending that the bid listed first above is the lowest responsive and responsible bid, and this Board concurring and so finding; NOW, THEREFORE, the Board finds, determines and orders as follows: The Board RELIEVES H & K of its bid, pursuant to Public Contract Code Section 5100 and following, because of the clerical mistake described above; and AWARD OF CONTRACT FOR THE DRAINAGE AREA 30A, LINE A PROJECT IN THE OAKLEY AREA Project No. 7557-6D8448-88 The Board WAIVES certain irregularities in Floyd Johnston's bid, consisting of failure to submit a signed copy of Addendum No. 1 with the bid and failure to list the names of corporate officers and residence address, and DECLARES that said irregularities have been cured; and The Board DETERMINES that Floyd Johnston, as the lowest monetary bidder, has demonstrated a good faith effort, pursuant to Public Contract Code Section 2000 and the specifications for this project, to comply with the goals and requirements of the District's Minority and Women Business Enterprise Program, and WAIVES any irregularities in such compliance; and The Board ORDERS that the contract for the furnishing of labor and materials for said work is awarded to said first-listed bidder (Floyd Johnston) at the listed amount and at the prices submitted in said bid, and that said contractor shall present two good and sufficient surety bonds as indicated above; and that the Chief Engineer shall prepare the contract therefor; and The Board FURTHER ORDERS that after the contractor has signed the contract and returned it, together with the bonds as noted above and any required certificates of insurance or other required documents, and the Chief Engineer has reviewed and found them to be sufficient, the Chief Engineer is authorized to sign the contract for this Board; and The Board FURTHER ORDERS that in accordance with the project specifications and/or upon signature of the contract by the Chief Engineer, any bid bonds posted by the bidders are to be exonerated and any checks or cash submitted for security shall be returned; and The Board FURTHER ORDERS that the Chief Engineer is authorized to sign any escrow agreements prepared for this project to permit the substitution of securities for moneys withheld by the District to ensure performance under the contract, pursuant to Section 22300 of the Public Contract Code; and Pursuant to Public Contract Code Section 4114, the Board DELEGATES its functions under Public Contract Code Sections 4107 and 4110 to the Chief Engineer or his designee; and The Board OVERRULES the bid protests submitted by Joe Foster Excavating, Inc. and Delta Excavating, Inc.; and The Board DECLARES that, should the award of the contract to Floyd Johnston be invalidated for any reason, the Board would not in any event have awarded the contract to the second listed bidder or any other bidder, but instead would have exercised its discretion to reject all of the bids received. Nothing herein shall prevent the Board from reawarding the contract to another bidder in cases where the successful bidder establishes a mistake, refuses to sign the contract or fails to furnish required bonds or insurance (see Public Contract Code Sections 5100-5107). Orig. Dept: Public Works Department Construction Division 1 hereby ON*Md MMa N•6W'aed ooereot=PY of cc: Public Works Department an action taken and entad 011 ft m1nift of tf» Construction Division Boom ofM�dale of 0111L Accounting AnEEp�2 5 1991 -- County Counsel PHIL BATCHELOR,Clerk Of the Board Auditor-Controller of Supervieora andAdminls11" Contractor (via Construction Division) By LA ,Oepuh► -2-