HomeMy WebLinkAboutMINUTES - 06251991 - 1.3 TO: BOARD OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: June 25,.1991
SUBJECT: Joint Exercise of Powers Agreement, With City of Richmond - Richmond Parkway
SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION
I. Recommended Action:
APPROVE and AUTHORIZE the Chair of the Board of Supervisors to sign the Joint Exercise of
Powers Agreement with the City of Richmond for design, acquisition of right of way, Construction
and Inspection of the section of North Richmond Bypass located within the unincorporated area
of Contra Costa County.
II. Financial Impact:
There will be no impact to the County General Fund. The funding for this project has been
secured by the City of Richmond from the Contra Costa Transportation Authority (CCTA), as
identified in the Expenditure Plan for North Richmond/Interstate 80 Bypass (Route 93).
III. Reasons for Recommendations and Background:
The City of Richmond is in the process of designing, acquiring right of way and administering
the construction and inspection of the North Richmond Bypass between Interstate 80 and
Interstate 580. The project is listed in the CCTA Expenditure Plan and funds are allocated by
CCTA to undertake the design, right of way and construction.
Within the limits of the project, there is a portion of unincorporated area in North Richmond
between Gertrude Avenue, and 1400 feet east of Parr Boulevard. The City of Richmond
requests to construct the unincorporated portion of the North Richmond Bypass and widen Parr
Boulevard between North Richmond Bypass and Grant Road in conjunction with the overall
project.
Continued on Attachment: X SIGNATURE: .
_ RECOMMENDATION OF COUNTY ADMINISTRATOR
_ RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON JUN 2 5 1991 APPROVED AS RECOMMENDED X OTHER—
VOTE OF SUPERVISORS
UNANIMOUS (ABSENT 1
AYES: NOES:
ABSENT: ABSTAIN:
1 hereby certify that this Is a tme'and correct copy of
RVF:kd an action taken and entered on the minutes of the
Board of Supervisors on the date shoWL
C:B025B.t6 ATTESTED: JUN 2 5 1991
PHIL BATCHELOR,Clerk of the Board
Orig. Div: Public Works (MP) of Supendsoraand Co Administrator
cc: L. Loder, City of Richmond .
M. Williams, City of Richmond By .D4►
P. Maxwell, CCTA
R. Faraone, Major Projects
/,3
JOINT EXERCISE OF POWERS AGREEMENT
June 25, 1991
Page Two
The schedule is to design the project to .Caltrans' standards between May 1991 and May
1992. Right of way acquisition would take place between November 1991 and September
1993. Construction is scheduled between September 1992 and December 1994.
IV. Consequences of Negative Action:
Should the Board not approve this agreement, the County will be responsible for completion
of the unincorporated portion of North Richmond Bypass and local funds generated by the
City of Richmond will not be available for this portion.