HomeMy WebLinkAboutMINUTES - 04021991 - H.4 Contra
TO:~ '' BOARD OF SUPERVISORS ��ja H.4
FROM: Harvey E. Bragdon � "l "I
Director of Community Development "
DATE: November 1, 1990
SUBJECT: Appeal of San Ramon Valley Regional Planning Commission decision to deny
Minor Subdivision 56-89 (David B. Hop, William & Carolyn Richardson) in
the Alamo area (APN 192-120-009) .
SPECIFIC REQUEST(S) OR RECOMNENDATION(S) i BACKGROUND AND JUSTIFICATION
RECOMMENDATIONS
Deny the appeal and sustain the Planning Commission denial of MS
56-89 in accord with the Option A actions listed below.
Board Options
Option A - Sustain Planning Commission Denial Decision
1. Deny the appeal of the owners William and Carolyn Richardson.
2. Deny MS 56-89
3. Approve the findings contained in the resolution of the San
Ramon Valley Regional Planning Commission as the basis for the
Board actions.
Option B - Reverse the Planning Commission Decision
1. Accept the environmental documentation prepared for . this
project as being adequate.
2. Grant the appeal of the owners.
3 . Approve MS 56-89 for two parcels subject to the conditions
which were attached to the project in the approval by the
Zoning Administrator.
BACKGROUND/JUSTIFICATION FOR PROPOSED ACTION
The background for this project is reviewed in the August 8, 1990
staff report to the San Ramon Valley Regional Planning Commission.
The Commission reviewed an appeal of the Zoning Administrator's
approval of the application filed by neighboring residents Richard
and Jennifer Wlasenko. The Wlasenkos own the private road,
Abington Court, which the applicant is seeking to use for the
proposed building site. The Wlasenkos have objected to allowing
the applicant access rights to the road. Other possible routes to
the proposed building site would require the granting of a variance
to minimum parcel dimension requirements.
On September 5, .1990, after taking testimony, the Planning
Commission voted to grant the Wlasenkos appeal, and deny the
subdivision.
On September 12, 1990, the owners of the property, William and
Carolyn Richardson appealed the Commission's decision to the Board.
The Richardsons' appeal contains no information that was not
available to the Commission.
CONTINUED ON ATTACHMENT: YES SIGNATURE•
'00 *J
RECOMMENDATION OF COUNTY ADMINISTRATOR RECOMMENDAT OF BbAnih COMMITTEE
APPROVE OTHER
SIGNATURE(S) :
ACTION OF BOARD ON April 2, 1991 APPROVED AS RECOMMENDED X OTHER
1.
On February 26 , 1991, the Board of Supervisors continued to this
date the hearing on the appeal of Carolyn and William R. Richardson
from the decision of the San Ramon Valley Regional Planning Commission
acting as the Board of Appeals on the application for approval of a
minor subdivision (MS 56-89) by David B. Hop (applicant) and William
and Carolyn Richardson (owners) to subdivide one acre into two parcels
in the Alamo area.
Karl Wandry, Community Development Department, advised the Board
of a resolution of the problem which was the basis for the denial of
the project by the San Ramon Valley Regional Planning Commission, and
he recommended that the Board uphold the appeal and put into place the
conditions set by the Zoning Administrator and effectively give
credence to the minor subdivision.
Supervisor Schroder moved approval of the staff recommendation
and expressed his pleasure that the parties had resolved this matter.
IT IS BY THE BOARD ORDERED that the public hearing on the above
matter is CLOSED; and Option B of the recommended Board options is
APPROVED. (Conditions, Exhibit A attached)
VOTE OF SUPERVISORS
I HEREBY CERTIFY THAT THIS IS A
X UNANIMOUS (ABSENT ) TRUE AND CORRECT COPY OF AN
AYES: NOES: ACTION TAKEN AND ENTERED ON THE
ASSENT: ABSTAIN: MINUTES OF THE BOARD OF
SUPERVISORS ON THE DATE SHOWN.
cc: Community Development Dept. ATTESTED April 2, 1991
David B. Hop v PHIL BATCHELOR, CLERK OF
William W& Ca17?1)mnDuRc zla dson THE BOARD OF SUPERVISORS
Assessor An COUNT DMINISTRATOR
San:'.Ramon Valley Fire Protection Dist. a
BY , DEPUTY
RHD:plp
2.
EKHIBIT "A"
CONDI IONS OF APPROVAL FOR MINOR SUBDIVISION 56-89
1. A parcel map shall be prepared and recorded for the Minor Subdivision in accordance
with the Subdivision Map Act and Title 9 (Subdivision) of the County Ordinance Code.
2. At least 45 days prior to recording a Parcel Map, issuance of Building Inspection
Department permits, or installation of improvements, the applicant shall submit a
preliminary soil and foundation report, meeting the requirements of Subdivision
Ordinance Section 94-4.420. Improvement, grading, and building plans shall carryout
the recommendations of the approved report. Concurrently with recordation of the
Parcel Map, record a statement to run with deeds to the property acknowledging the
report by title, author (firm), and date, calling attention to recommendations, and
noting that the report is on file for public review in the Community Development
Department of Contra Costa County.
3. A landscape plan shall be submitted for Zoning Administrator review and approval
which incorporates rapidly growing evergreen bushes along the entire southern
property line of Parcel "B".
4. The proposed home on Parcel "B" shall be setback not less than 35 ft.
5. Comply with drainage, road improvement, traffic and utility requirements as follows:
A. In accordance with Section 92-2.006 of the County Ordinance Code, this
subdivision shall conform to the provisions of the County Subdivision Ordinance
(Title 9). Any exceptions therefrom must be specifically listed in this
conditional approval statement. Conformance with the Ordinance includes the
following requirements:
1) The appiicant shall underground all utility distribution facilities with an
exception to this requirement is granted for the existing house on Parcel
A.
2) The applicant shall convey all storm waters entering or originating on the
subject property, without diversion and within an adequate storm
drainage facility, to a natural watercourse having definable bed and
banks or to an existing adequate storm drainage facility which conveys
the storm waters to a natural watercourse.
3) The applicant shall design and construct storm drainage facilities
required by the Ordinance in compliance with specifications outlined in
Division 914 of the Ordinance and in compliance with design standards
of the Public Works Department.
4) The applicant shall submit improvement plans prepared by a registered
civil engineer, review and inspection fees, and pey security for all
improvements required by the Ordinance Code or the conditions of
approval for this subdivision.
2.
B. The applicant shall furnish proof to the Public Works Department, Engineering
Services Division, that legal access to the property is available from Stone
Valley Road by way of Austin Lane and Abington Lane.
C. The applicant shall furnish proof to the Public Works Department, Engineering
Services Division, of the acquisition of all necessary rights of entry, permits
and/or easements for the construction of off-site,temporary or permanent,road
and drainage improvements.
D. The applicant shall mitigate the impact of the additional storm water run-off
from this development on San Ramon Creek by:
1 Removing 1 cubic yard of channel excavation material from the
inadequate portion of San Ramon Creek near Chaney Road for each 50
square feet of new impervious surface area created by the development.
All excavated material shall be disposed of off-site by the developer at
his cost. The site selection,land rights, and construction staking will be
by the Flood control District.
6. The applicant shall contact the California Archaeological Inventory at Sonoma State
University (707) 664-2494, in regard to these finding that the proposed project area
has the possibility of containing cultural resources and that they recommend a study.
ADVISORY NOTES
A. The applicant shall comply with Environmental Health Division requirements by each
parcel having water supplied by EBMUD and sewered by Central Sanitary.
B. The San Ramon Valley Fire Protection District recommends the following:
1. Although not required by ordinance, the San Ramon Valley Fire Protection
District strongly recommends the installation of an automatic fire sprinkler
system.
2. Roof covering must be Class C or better. It is highly recommended that non-
combustible fire retardant roofing be installed.
3. Approved number or addresses shall be placed on all new and exiting buildings
in such a position as to be plainly visible and legible from the street or road
fronting the property. Said numbers shall contrast with their background.
Individual suite numbers shall be permanently posted on the main entrance
doors of tenant spaces.
3.
4. Nothing in this review is intended to authorize or approve of any aspects of the
design or installation which do not strictly comply with all applicable codes and
standards; i.e., additional comments may be added during subsequent drawing
review for field inspection. Please call if there are any questions.
C. The East Bay Municipal Utility District Board of Directors has adopted the following rule
concerning new connections during the current water shortage emergency condition:
1. An application for new service connection shall be granted only if Subsection
(1) or (2) is satisfied:
a. An applicant agrees in writing that the use of water for outside irrigation
will be limited to drought tolerant plantings with drip irrigation systems
and that seeded lawns or sod will not be installed; and
The city or county within which new water service is requested has
adopted the District's recommended landscape ordinance or a
comparable ordinance by May 26, 1988 (or such date as the Board may
determine).
b. The applicant agrees in writing that there shall be no use of water out
outside irrigation during the water shortage emergency.
D. The County Building Inspection Department will require the following:
1. A grading permit may be required for the earthwork necessary to develop all
parcels in the above minor subdivision.
2. Plans accompanying the application for building permits shall show the existing
contours, the extent of the proposed grading and drainage improvements and
shall be reviewed by the Grading Section prior to issuance.
3. Prior to issuance of building and/or grading permits in-above minor subdivision,
a preliminary soil investigation report prepared by a licensed soil engineer will
be required. It shall report on the ability of the site to support the
improvements anticipated, and shall include recommended foundation designs
to achieve maximum stability of the proposed structures.
4. Building foundations shall be designed to counteract swelling and uplift
characteristics of the expansive soil at this site.
5. Provide details of drainage from pond. Provide details of flows to pond.
E. The applicant will be required to comply with the requirements .of the
Bridge/Thoroughfare Fee Ordinance for the Countywide Area of Benefit as adopted by
the Board of Supervisors.
4.
Currently the fee for the Alamo region of the County is $2,201 for each added single
family residence.
F. Upon written request, the applicant may make a cash payment in lieu of actual
excavation and removal of material from the Creek. The cash payment will be
calculated at the rate of $0.10 pr square foot of new impervious surface area crated
by the development. The added impervious surface area created by the development
will be based on the Flood Control .District's standard impervious surface area
ordinance. The Flood Control District will use these funds to work on the Creek
annually.
G. The applicant shall comply with the Parklands Dedication Fee Ordinance, the current
fee is $400 per parcel.
TB/aa
MSXI/56-90C.TB
11/13/89
6/25/90
7/27/90
8/1/90
4/3/91 (retyped)