Loading...
HomeMy WebLinkAboutMINUTES - 03261991 - TC.2 TO: BOARD OF SUPERVISORS { ' Contra Costa FROM: Transportation Committee CO� / r,� K • `I n] DATE: March 18, 1991 SUBJECT: Report from WCCTAC on Measure C Action Plan Workshop Results I SPECIFIC REQUEST(S) OR RECOMMENDATIONS) & BACKGROUND AND JUSTIFICATION RECOMMENDATIONS 1. Accept the report from the West Contra Costa County Transportation Advisory Committee (WCCTAC) on the results from the Measure C Action Plan Development Workshop conducted on February 11, 1991 (see Exhibit A) . 2 . Direct Community Development Department to forward the County' s comments to WCCTAC. FISCAL IMPACT None. i BACKGROUND/REASONS- FOR RECOMMENDATIONS On February 11, 1991, the West Contra Costa County Transportation Advisory Committee (WCCTAC) ] conducted a workshop to review potential goals, strategies, iand Routes of Regional Significance for West County's Measure C Action Plan. Following the workshop, WCCTAC at its regular February 22nd meeting decided to circulate for review and comment a Summary Report on the Workshop to member jurisdictions. The Transportation Committee has reviewed the Summary Report and recommends the Director of Community Development submit the following comments to WCCTAC: ; 1. Appian Way-Valley View Road Reaffirm the Board of Supervisors position that Appian Way- Valley View Road should be designated as a Route of Regional Significance for inclusion in the West County Action Plan (as outlined in a Board Order from March 5, ' 1991) . CONTINUED ON ATTACHMENT: x YES SIGNATURE i I RECOMMENDATION OF COUNTY AD NISTRATOR _ RECOMMENDATION OF BOARD COMMITTEE APPROVE HER SIGNATURE (S) : hroder , Tom Torlakson ACTION OF BOARD ON March 26, 1991 APPROVED AS RECOMMENDED X OTHER _ i VOTE OF SUPERVISORS I HEREBY CERTIFY THAT THIS IS A X UNANIMOUS (ABSENT y — TRUE AND CORRECT COPY OF AN AYES: 1 NOES: ACTION TAKEN AND ENTERED ON THE ABSENT: ABSTAIN: i MINUTES OF THE BOARD OF SUPERVISORS ON THE DATE SHOWN. i �a�c� o?G Orig: Community Development Department ATTESTED AW cc: WCCTAC PHIL BATCHELOR, Public Works (Road Engineering) CLE OF THE BOARD OF SUPERVISORS County Administrator' AN TY AWINISTRATO BYSZ�L , DEPUTY i I I I I r 1 I � f E continued 2 San Pablo Dam Road/Camino Pablo Based on Measure C cri.teria, :San Pablo Dam Road/Camino Pablo is appropriately ; designated as a Route of Regional Significance because it connects two regions and carries substantial thru- traffic. In addition, the recently adopted County General Plan identifies Sari Pablo Dam Road as vital arterial with an .important traffic function of linking west and central county. San Pablo Dam Road should retain itsiexisting status as a Regional Route. I' 3 . Cummings Skyway The County does not see thejneed to study designation of Cummings Skyway as a Regional Route !because under the County General Plan its is intended to function as a two lane rural expressway and planned improvements to State Route 4 should reduce traffic using this road as a bypass route. 4 . San Pablo Avenue i The County is discussing with representatives from Rodeo and Crockett the " extension of Regional Route designation through those communities. The results of these discussions will be forwarded to ` WCCTAC. The !County supports extending the State Highway designation (RouteJ123) on San Pablo Avenue. 5. El Portal ' Page 4, first bullet item should reflect a multi- jurisdictional approach to addressing traffic congestion impacts on this arterial Ind should read: • Encourage the county to coordinate planned improvements with neighboring jurisdictions, especially left turn (lanes. i i i i f I I k i } i I t f I I I p. r. f ( I i i i I I � i; Gac're�cf�ens continued 2 . San Pablo Dam Road/Camino Pablo Based on Measure C criteria, San Pablo Dam Road/Camino Pablo is appropriately ,t, designated as a Route of Regional Significance because it connects two regions and carries substantial thru- traffic. In addition, the recently adopted County General Plan identifies Sari Pablo Dam Road as vital arterial with an important traffic function of linking west and central county. San Pablo Dam Road should retain its existing status as a Regional Route. 3 . Cummings Skyway The County does not see the need to study designation of Cummings Skyway as a Regional Route because under the County General Plan its is intend'•ed to function as a two lane rural expressway and planned improvements to State Route 4 should reduce traffic using this road as a bypass route. 4 . San Pablo Avenue h Tsc e: .e .:tat• ; cd: :a::«<:and .::runt..::::: .:.........................::.....::.,. :::::::::. p.:...........::....:::....:::.... ::.:.:::::.:.::.:.:.:::::::::::.:::.::._::........................ ::..<. .....:::>d :.7�....................... ............. t1 «;'>:,;:,;< ";>'>` :> ;:,>:>;;, ,::;::;:::;:;'< > :::::::::,:::::.::.::..::....:.:.........:.......................................................... .................... ..... tate highway designatonRoute' 123) on San Pablo Avenue. ;::::.iiii:•ii::SYi:::;...::.:i.;':;::.;'.;:;'.;'.}':;:}•:::.::ii:.ii;:::... .::.•[:::::::.:...:.::......: .::....�.;:.::.;....�.:::.>:n::�:.: :. :' :k.: :''.: :' ':.i?i>:is ..::.:..,:.. .:... t r : I i r, t I' t West Contra Costa County Transportation Advisory Committee . c i i i I' MEASURE C ACTION PLAN DEVELOPMENT WORKSHOP Summary of Comments Received from the West Contra Costa County Transportation Advisory Committee Workshop held February 11, 1991. i f! i Prepared by: i, WCCTAC STAFF and MOORE IACOFANO GOLTSMAN 1802 Fifth Street it I Berkeley,CA 94710 (415) 845-7549 i k February 1991 I' i i l i r 'i S 13 TABLE OF CONTENTS p, I. Introduction .................................................................................................... 1 I I II. Discussion of Measure C Action Plan Framework.................................... 3 I' i Appendix A. Workshop Agenda B. Photoreduction of Wallgraphic produced during WCCTAC meeting. k i I'. i I. j' Il I' i I . f h i i! i I'. West Contra Costa County Transportation Advisory Comm. Page 1 Measure C Action Plan Development Workshop Summary l I. INTRODUCTION Overview This document is a summary of comments received from the Measure C Action Plan Development Workshop held Monday,February 11,1991 with the West Contra Costa County Transportation Advisory Committee. The workshop took place in the City of Hercules Council Chambers. 1 The purpose of this workshop was to review potential goals and strategies of the Measure C Action Plan and to determine the Routes of Regional Signficance to be addressed by the plan. Possible actions for improving transportation on each of the designated routes were identified. The actions listed in this summary represent possible strategies to be further analyzed for inclusion in the plan. It is anticipated that some will be revised, deleted,or added to throughout the study process. Therefore,this summary report does not represent a rigid Action Plan outline. Workshop attendance is summarized below: WCCTAC Members Present: i Jay Tucker, City of Hercules David MacDiarmid, City of Richmond James McMillan, City of Richmond Jean Siri, City of El Cerrito Dan Purnell, City of Pinole(Alternate) Sharon Brown, City of San Pablo Joseph Gomes,City of San Pablo(Alternate) Nello Bianco, Bay Area Rapid Transit Roy Nakadegawa,AC Transit(Alternate) i WCCTAC Members Absent: John Marquez, City of Richmond Russ Perkins, City of Hercules(Alternate) Norma Jellison,City of El Cerrito(Alternate) Ann Williams, City of Pinole(Alternate) Tom Powers, Contra Costa County Nancy Fanden, Contra Costa County(Alternate) Ruth Ganong,AC Transit Primary Staff/6nsultant Team Present: Paul Korry, WCCTAC staff Ellen Greenberg,Blayney Dyett Greenberg Brad Beck, Blayney Dyett Greenberg Martin Engleman, Contra Costa County Transportation Authority Daniel Iacofano,MIG,Inc. Jim Oswald,MIG,Inc. i 3a� r West Contra Costa County Transportation Advisory Comm. pa"a 2 Measure C Action Plan Development Workshop Summary Overview Paul Korry welcomed Advisory Committee members and briefly described the purpose of the workshop.Daniel Iacofano,workshop facilitator,reviewed the workshop agenda and discussed the framework for the meeting. See i Appendix A for a sample copy of the workshop agenda. r Ellen Greenberg,provided a brief technical overview of the Growth Management Program and Action Plan development process. The three main components of the Action Plan were discussed: (1) traffic service objectives and action/implementation responsibilities for each designated Regional Route; (2) land use policies and demand management strategies (regional actions) for reducing congestion; and (3) monitoring and review of Action Plan accomplishments. She then turned the workshop back over to Daniel Iacofano who managed the remaining workshop discussion. I i i 4 r I f' West Contra Costa County Transportation Advisory Comm. Pave 3 Measure C Action Plan Development Workshop Summary r II. DISCUSSION OF MEASURE C ACTION PLAN FRAMEWORK Committee members were asked to review and discuss the framework handout mailed to them last week and offer comments and suggestions regarding possible Action Plan goals,the routes of regional significance,and possible strategies or actions for improving transportation along each of the designated routes. The discussion was graphically recorded on large wallgraphics which was used to develop the summary below(see Appendix B for a photoreduction of the wallgraphic produced during the workshop). Figure I provides an overview of the overall discussion framework for the workshop. 1'. A. Vision Statement Committee members discussed the importance of creating an overall transportation vision for the West County-a vision which stressed the improved quality of life which would result from a comprehensive transportation planning effort. This effort is guided by four key considerations: • Mass transit • Economic development • Balanced land use • Urban design"' Members identified three primary and seven related goals associated with achieving the vision: Primary Goals • Promote economic development • Facilitate and',encourage the use of mass transit • Improve environmental quality Related Goals • Improve local'mobility by improvng regional routes • Minimize thru traffic on local roads • Balance location of jobs/workers • Coordinate land use and traffic planning • Emphasize pedestrian design including scale,access,safety,etc. • Establish strong lead agency • Maintain inter-agency coordination B. Strategies Committee members identified two primary strategies for the Action Plan: shorten commute;trips and encourage longer trips on express transit systems. 3,7 - -" WCCTAC ACTION PLAN WORKSHOP ilia Lj Discussion Framework Figure 1 Vision Statement Improved quality of life resulting from a comprehensive transportation planning effort emphasizing: o Mass Transit o Economic Development o Balanced Land Use o Urban Design PRIMARY >`` Fro of .Ece�am c and tour.. a>: ::>::»::»: rnena3:::. GOALS _ . Us._.. ........ ::leve me ;:.;::<;;.;:.;; .......... . tit................. X. to P,...............:::::..::::...: ::::tura::::: n ra _................................................._....._. ................:.:::,::.:::::.::,.:,:::. .. >. :<.;>::::. ..;.. .;:.:.>::;.;«<;>;<::::;>:.;>;:;:>::»>::;:: Improve Local Mobility Minimize by Improving Thm Traffic Regional on Local i Routes Roads Balance Coordinate Emphasize RELATED Location of Land Use and Pedestrian Design GOALS Jobs/Workers Traffic Planning (Scale,Access, Safety, etc.) Establish Maintain Strong Lead Inter-Agency Agency Coordination PRIMARY Shorten Commute Trips Encourage Longer Trips on STRATEGIES Express Transit Systems r o Coordinate strategies o Study ways to fund o Implement transportation OTHER among involved cities ongoing West County systems management SUPPORTING and agencies. public education and skill measures (e.g.flextime, STRATEGIES Encourage more retraining programs. carpool,bicycle,vans,etc.). responsibility by Solano County. o Regulate truck parking o Recognize the school o Develop funding and access. related impacts of traffic. priorities for traffic Seek solutions. improvements. 7, g West Contra Costa County Transportation Advisory Comm. ;'uge d Measure C Action Plan Development Workshop Summary Committee members also suggested a number of supporting strategies including the following. • Coordinate planning actions among involved cities and agencies. • Encourage more responsibility by Solano County. • Regulate truck parking and access. • Study ways to fund ongoing West County public education and skill retraining programs. • Recognize the school-related impacts of traffic and seek solutions to these problems. • Implement transportation systems management measures (e.g.,flextime, carpool,bicycle,vans,etc). • Develop funding priorities for traffic improvements. i C. Regionally Significant Routes and Possible Improvement Actions Committee members reviewed the preliminary list of routes of regional significance and suggested possible actions to improve transportation on each of them. Committee members also identified possible additional routes to be included in!the system. Each route and a list of possible actions to be addressed by thef plan are summarized below. Figure 2 illustrates the discussion framework for the Regional Routes. Figure 3 is a map of the Preliminary Regional Routes in West County. Cutting Blvd • Support Cutting Blvd beautification program currently underway. • Connect to Bay Trail. • Improve transit access from Cutting Blvd to BART. • Address railroad grade separation problems. , 23rd Street • Coordinate signal timing along 23rd Street. • Consider undergrounding utilities. • Improve bus transit connections. El Portal • Encourage the County to make planned improvements,especially left turn lanes. • Add sidewalks and trails. Richmond Parkway • Monitor Parkway's effectiveness at diverting traffic on 1-80 and other routes. • Experiment with new transit/design innovations. • Support completion of the project. • Monitor project progress-provide strong design input. 3,9 b o0 .0 E E N r aE a 10E oaoc'" a> N.TN Np CL O - y p C w m._ U_a 2 E.E O N O N CD>"pC C 7 N La-, O Id �dd dUOe d $e c4 ` ornC> mm E 3m Lu maLEin o ❑ ❑ ❑ ❑ ❑ ❑ r � N o' 3 E n o c m m LL0I.0 rn a ecO2N aC4 0CD UC y > N OUC >> e d'm y > n . UO u'Sain EE DU E 0N 8 CoUp� a. �o i T f O e O N Y '� or v i• E C E m m o y m a o co `0*a-m D a >Qg > >'� > c L U In C >.0 C O 10 - O >�cLi aEaymE 0 8 OU inw o Eoa) e- E' Y N iNmim dA ,o3 cj,Lcv°i Ey Lwmfl acC Lmam >o3 N O E ro 0 c a c m >E Q. �p q 2=QL0 CL h »` o adoZ E CL 8 E No in c N 3 � Z 02'y u- ;r co 5 rn 4 a I. m 2 y O c 'O Q _y uE dp aa�o r 8r aim c N C O e A C d O N y Q [5-p's r�a0i 4)om °d' 30 a cmo oa U oc o 00 V f m�_ e u'Sc5 £no 2aw9 a a N 'R CJ C C Nal No N 3 a a E—>N 3 c 0. m m m m c v m OY > Ec � . 8EQLU0 ❑ E ❑ a o CD 0 co .00 «' E � ase� e nc cc o o E8 I' o ❑ o ❑ o o > 9 CO OF� _ a e CO e N tz ce > CL 15 NON l N CC e N �� �DooEE�m as o ❑ o ❑ ❑ o J m C y - N 7 WZU Ulz U~ 07Z OZ 0aaNL �(7ui Z Q2,LLI NO w2H 7 _ate_ f, , , s , , J , J , , , a J s , J - J , J J FEt , .......::.......:::.... , J QQ , , - J \ s ............ 80 F' i a kEtk 1' a Y S 4 i n 4 ` 3 i I l r � r 3 Y Z ort �bfa V apey F°f3 ,.. Blvd O > ^mss 3 L > i Carlson Blvd .. i [� o ao N 24 r 4e_ 'M a i a r a l r i l Figure 3 Routes of Regional Significance West County Designated Routes of For Further Study Regional Significance (Preliminary List) Contra Costa Transportation Authority February 20, 1991 BLAYNEY DYETT a GREENBERG Urban and Re lbnal Planners West Contra Costa County Transportation Advisory Comm. Pa¢e 5 Measure C Action Plan Development Workshop Summary ` I-80 • Determine the best"express transit" system along I-80. • Determine the best phasing of improvements. • Prepare origin/destination study to understand commute patterns. • Consider freeway metering system options (mainline vs ramps). • Study existing interchanges and off-on ramps. • Support Albany interchange improvements. 1-580 • Monitor impacts of future job centers on I-580 (West County model). • Study benefits of 23rd/Cutting&Richmond Parkway improvements on I-580 traffic. • Improve access from I-580 to employment/residential areas (e.g.,shuttles, bus connections,etc.) f San Pablo Avenue • Extend designation as State Highway. • Improve signal timing throughout. • Consider driveway restrictions. • Develop uniform design standards. • Improve bus!facilities (comfort,safety, access) • Add more exclusive left turn lanes. • Possibly encourage higher density housing along corridor. San Pablo Dam Road/Camino Pablo • Determine appropriateness as a regional route • Study options to relieve traffic. • Improve coordination with Orinda to reduce thru-traffic. • Encourage/improve bicycle and pedestrian circulation. • Possibly encourage higher density mixed use development. Highway 4 • Improve safety along Willow Road in Hercules Area. • Eliminate left turns. . • Begin phasing improvements. • Consider optimum land use patterns/density to support transit and minimize traffic impact. Committee members identified additional routes in need of further study to determine their appropriateness as designated regional routes. • Cummings Skyway • Rumrill Blvd: • Appian Way • Carlson Blvd. 3, 1 Appenhop Agenda *or ,5 ,i F r: West Contra Costa Transportation Advisory Committee February 11,1991 Action Plan Workshop Agenda 9:00 I. Introduction • Workshop Purpose s Agenda Overview 9:10 II.� Overview of the Measure C Action Plan Requirements 9:30 III. Discussion of Action Plan Framework for West County A. Goals z B. Regional Routes 10:10 Break 10:20 III: Discussion of Action Plan Framework for West County (continued) C. Potential Actions That Address Each Regional Route D. Other Supporting Strategies 11:55 IV.i Next Steps 12:00 Close i I +:tea Appendix B - ---- t., Wallgraphic plotoreductions produced during the Advisory Committee ;# workshop j; 1 I- 1. i I I I., 1 l f I% I 4Ilk o p L f P O LL U a O U Q o nca i - F- N N W CO C (D v lit H A4_ i OR W U F n _ I � I UA Ej u alp i q 6 moA- . �u