SUBJECT: Report from WCCTAC on Measure C Action Plan Workshop Results
I
SPECIFIC REQUEST(S) OR RECOMMENDATIONS) & BACKGROUND AND JUSTIFICATION
RECOMMENDATIONS
1. Accept the report from the West Contra Costa County
Transportation Advisory Committee (WCCTAC) on the results from
the Measure C Action Plan Development Workshop conducted on
February 11, 1991 (see Exhibit A) .
2 . Direct Community Development Department to forward the
County' s comments to WCCTAC.
FISCAL IMPACT
None.
i
BACKGROUND/REASONS- FOR RECOMMENDATIONS
On February 11, 1991, the West Contra Costa County Transportation
Advisory Committee (WCCTAC) ] conducted a workshop to review
potential goals, strategies, iand Routes of Regional Significance
for West County's Measure C Action Plan. Following the workshop,
WCCTAC at its regular February 22nd meeting decided to circulate
for review and comment a Summary Report on the Workshop to member
jurisdictions.
The Transportation Committee has reviewed the Summary Report
and recommends the Director of Community Development submit the
following comments to WCCTAC: ;
1. Appian Way-Valley View Road
Reaffirm the Board of Supervisors position that Appian Way-
Valley View Road should be designated as a Route of Regional
Significance for inclusion in the West County Action Plan (as
outlined in a Board Order from March 5, ' 1991) .
CONTINUED ON ATTACHMENT: x YES SIGNATURE
i
I
RECOMMENDATION OF COUNTY AD NISTRATOR _ RECOMMENDATION OF BOARD COMMITTEE
APPROVE HER
SIGNATURE (S) : hroder , Tom Torlakson
ACTION OF BOARD ON March 26, 1991 APPROVED AS RECOMMENDED X OTHER _
i
VOTE OF SUPERVISORS
I HEREBY CERTIFY THAT THIS IS A
X UNANIMOUS (ABSENT y — TRUE AND CORRECT COPY OF AN
AYES: 1 NOES: ACTION TAKEN AND ENTERED ON THE
ABSENT: ABSTAIN: i MINUTES OF THE BOARD OF
SUPERVISORS ON THE DATE SHOWN.
i �a�c� o?G
Orig: Community Development Department ATTESTED AW
cc: WCCTAC PHIL BATCHELOR,
Public Works (Road Engineering) CLE OF THE BOARD OF SUPERVISORS
County Administrator' AN TY AWINISTRATO
BYSZ�L , DEPUTY
i
I
I
I
I
r 1
I �
f
E
continued
2 San Pablo Dam Road/Camino Pablo
Based on Measure C cri.teria, :San Pablo Dam Road/Camino Pablo is
appropriately ; designated as a Route of Regional Significance
because it connects two regions and carries substantial thru-
traffic. In addition, the recently adopted County General Plan
identifies Sari Pablo Dam Road as vital arterial with an .important
traffic function of linking west and central county. San Pablo
Dam Road should retain itsiexisting status as a Regional Route.
I'
3 . Cummings Skyway
The County does not see thejneed to study designation of Cummings
Skyway as a Regional Route !because under the County General Plan
its is intended to function as a two lane rural expressway and
planned improvements to State Route 4 should reduce traffic using
this road as a bypass route.
4 . San Pablo Avenue i
The County is discussing with representatives from Rodeo and
Crockett the " extension of Regional Route designation through
those communities. The results of these discussions will be
forwarded to ` WCCTAC. The !County supports extending the State
Highway designation (RouteJ123) on San Pablo Avenue.
5. El Portal '
Page 4, first bullet item should reflect a multi-
jurisdictional approach to addressing traffic congestion
impacts on this arterial Ind should read:
• Encourage the county to coordinate planned
improvements with neighboring jurisdictions,
especially left turn (lanes.
i
i
i
i
f
I
I
k i
}
i
I
t
f
I
I
I
p.
r.
f (
I
i
i
i
I
I �
i;
Gac're�cf�ens
continued
2 . San Pablo Dam Road/Camino Pablo
Based on Measure C criteria, San Pablo Dam Road/Camino Pablo is
appropriately ,t, designated as a Route of Regional Significance
because it connects two regions and carries substantial thru-
traffic. In addition, the recently adopted County General Plan
identifies Sari Pablo Dam Road as vital arterial with an important
traffic function of linking west and central county. San Pablo
Dam Road should retain its existing status as a Regional Route.
3 . Cummings Skyway
The County does not see the need to study designation of Cummings
Skyway as a Regional Route because under the County General Plan
its is intend'•ed to function as a two lane rural expressway and
planned improvements to State Route 4 should reduce traffic using
this road as a bypass route.
4 . San Pablo Avenue
h
Tsc
e: .e .:tat• ; cd: :a::«<:and
.::runt..::::: .:.........................::.....::.,. :::::::::. p.:...........::....:::....:::.... ::.:.:::::.:.::.:.:.:::::::::::.:::.::._::........................
::..<. .....:::>d :.7�....................... ............. t1
«;'>:,;:,;< ";>'>` :> ;:,>:>;;, ,::;::;:::;:;'< > :::::::::,:::::.::.::..::....:.:.........:.......................................................... .................... ..... tate
highway designatonRoute' 123) on San Pablo Avenue.
;::::.iiii:•ii::SYi:::;...::.:i.;':;::.;'.;:;'.;'.}':;:}•:::.::ii:.ii;:::... .::.•[:::::::.:...:.::......: .::....�.;:.::.;....�.:::.>:n::�:.: :. :' :k.: :''.: :' ':.i?i>:is ..::.:..,:.. .:...
t
r
:
I
i
r,
t
I'
t
West Contra Costa County Transportation Advisory Committee .
c
i
i
i
I'
MEASURE C ACTION PLAN DEVELOPMENT WORKSHOP
Summary of Comments Received from the West Contra Costa County
Transportation Advisory Committee Workshop held February 11, 1991.
i
f!
i
Prepared by:
i,
WCCTAC STAFF
and
MOORE IACOFANO GOLTSMAN
1802 Fifth Street it
I
Berkeley,CA 94710
(415) 845-7549
i
k
February 1991 I'
i
i
l
i
r
'i
S 13
TABLE OF CONTENTS
p,
I. Introduction .................................................................................................... 1
I
I
II. Discussion of Measure C Action Plan Framework.................................... 3
I'
i
Appendix
A. Workshop Agenda
B. Photoreduction of Wallgraphic produced during WCCTAC meeting.
k
i
I'.
i
I.
j'
Il
I'
i
I .
f
h
i
i!
i
I'.
West Contra Costa County Transportation Advisory Comm. Page 1
Measure C Action Plan Development Workshop Summary
l
I. INTRODUCTION
Overview
This document is a summary of comments received from the Measure C
Action Plan Development Workshop held Monday,February 11,1991 with
the West Contra Costa County Transportation Advisory Committee. The
workshop took place in the City of Hercules Council Chambers.
1
The purpose of this workshop was to review potential goals and strategies of
the Measure C Action Plan and to determine the Routes of Regional
Signficance to be addressed by the plan. Possible actions for improving
transportation on each of the designated routes were identified. The actions
listed in this summary represent possible strategies to be further analyzed for
inclusion in the plan. It is anticipated that some will be revised, deleted,or
added to throughout the study process. Therefore,this summary report does
not represent a rigid Action Plan outline.
Workshop attendance is summarized below:
WCCTAC Members Present:
i
Jay Tucker, City of Hercules
David MacDiarmid, City of Richmond
James McMillan, City of Richmond
Jean Siri, City of El Cerrito
Dan Purnell, City of Pinole(Alternate)
Sharon Brown, City of San Pablo
Joseph Gomes,City of San Pablo(Alternate)
Nello Bianco, Bay Area Rapid Transit
Roy Nakadegawa,AC Transit(Alternate)
i
WCCTAC Members Absent:
John Marquez, City of Richmond
Russ Perkins, City of Hercules(Alternate)
Norma Jellison,City of El Cerrito(Alternate)
Ann Williams, City of Pinole(Alternate)
Tom Powers, Contra Costa County
Nancy Fanden, Contra Costa County(Alternate)
Ruth Ganong,AC Transit
Primary Staff/6nsultant Team Present:
Paul Korry, WCCTAC staff
Ellen Greenberg,Blayney Dyett Greenberg
Brad Beck, Blayney Dyett Greenberg
Martin Engleman, Contra Costa County Transportation Authority
Daniel Iacofano,MIG,Inc.
Jim Oswald,MIG,Inc.
i
3a�
r
West Contra Costa County Transportation Advisory Comm. pa"a 2
Measure C Action Plan Development Workshop Summary
Overview
Paul Korry welcomed Advisory Committee members and briefly described
the purpose of the workshop.Daniel Iacofano,workshop facilitator,reviewed
the workshop agenda and discussed the framework for the meeting. See i
Appendix A for a sample copy of the workshop agenda.
r
Ellen Greenberg,provided a brief technical overview of the Growth
Management Program and Action Plan development process. The three
main components of the Action Plan were discussed: (1) traffic service
objectives and action/implementation responsibilities for each designated
Regional Route; (2) land use policies and demand management strategies
(regional actions) for reducing congestion; and (3) monitoring and review of
Action Plan accomplishments. She then turned the workshop back over to
Daniel Iacofano who managed the remaining workshop discussion.
I
i
i
4
r
I
f'
West Contra Costa County Transportation Advisory Comm. Pave 3
Measure C Action Plan Development Workshop Summary r
II. DISCUSSION OF MEASURE C ACTION PLAN FRAMEWORK
Committee members were asked to review and discuss the framework
handout mailed to them last week and offer comments and suggestions
regarding possible Action Plan goals,the routes of regional significance,and
possible strategies or actions for improving transportation along each of the
designated routes. The discussion was graphically recorded on large
wallgraphics which was used to develop the summary below(see Appendix
B for a photoreduction of the wallgraphic produced during the workshop).
Figure I provides an overview of the overall discussion framework for the
workshop.
1'.
A. Vision Statement
Committee members discussed the importance of creating an overall
transportation vision for the West County-a vision which stressed the
improved quality of life which would result from a comprehensive
transportation planning effort. This effort is guided by four key
considerations:
• Mass transit
• Economic development
• Balanced land use
• Urban design"'
Members identified three primary and seven related goals associated with
achieving the vision:
Primary Goals
• Promote economic development
• Facilitate and',encourage the use of mass transit
• Improve environmental quality
Related Goals
• Improve local'mobility by improvng regional routes
• Minimize thru traffic on local roads
• Balance location of jobs/workers
• Coordinate land use and traffic planning
• Emphasize pedestrian design including scale,access,safety,etc.
• Establish strong lead agency
• Maintain inter-agency coordination
B. Strategies
Committee members identified two primary strategies for the Action Plan:
shorten commute;trips and encourage longer trips on express transit systems.
3,7
- -" WCCTAC ACTION PLAN WORKSHOP
ilia
Lj Discussion Framework
Figure 1
Vision Statement
Improved quality of life resulting from a
comprehensive transportation planning effort emphasizing:
o Mass Transit
o Economic Development
o Balanced Land Use
o Urban Design
PRIMARY
>`` Fro of .Ece�am c
and
tour.. a>: ::>::»::»:
rnena3:::.
GOALS
_ . Us._.. ........
::leve me ;:.;::<;;.;:.;;
.......... . tit.................
X.
to
P,...............:::::..::::...:
::::tura::::: n
ra
_................................................._....._. ................:.:::,::.:::::.::,.:,:::. .. >. :<.;>::::. ..;.. .;:.:.>::;.;«<;>;<::::;>:.;>;:;:>::»>::;::
Improve
Local Mobility Minimize
by Improving Thm Traffic
Regional on Local
i
Routes Roads
Balance Coordinate Emphasize
RELATED Location of Land Use and Pedestrian Design
GOALS Jobs/Workers Traffic Planning (Scale,Access,
Safety, etc.)
Establish Maintain
Strong Lead Inter-Agency
Agency Coordination
PRIMARY Shorten Commute Trips Encourage Longer Trips on
STRATEGIES Express Transit Systems
r
o Coordinate strategies o Study ways to fund o Implement transportation
OTHER among involved cities ongoing West County systems management
SUPPORTING and agencies. public education and skill measures (e.g.flextime,
STRATEGIES Encourage more retraining programs. carpool,bicycle,vans,etc.).
responsibility by
Solano County.
o Regulate truck parking o Recognize the school o Develop funding
and access. related impacts of traffic. priorities for traffic
Seek solutions. improvements.
7, g
West Contra Costa County Transportation Advisory Comm. ;'uge d
Measure C Action Plan Development Workshop Summary
Committee members also suggested a number of supporting strategies
including the following.
• Coordinate planning actions among involved cities and agencies.
• Encourage more responsibility by Solano County.
• Regulate truck parking and access.
• Study ways to fund ongoing West County public education and skill
retraining programs.
• Recognize the school-related impacts of traffic and seek solutions to these
problems.
• Implement transportation systems management measures (e.g.,flextime,
carpool,bicycle,vans,etc).
• Develop funding priorities for traffic improvements.
i
C. Regionally Significant Routes and Possible Improvement Actions
Committee members reviewed the preliminary list of routes of regional
significance and suggested possible actions to improve transportation on
each of them. Committee members also identified possible additional routes
to be included in!the system. Each route and a list of possible actions to be
addressed by thef plan are summarized below. Figure 2 illustrates the
discussion framework for the Regional Routes. Figure 3 is a map of the
Preliminary Regional Routes in West County.
Cutting Blvd
• Support Cutting Blvd beautification program currently underway.
• Connect to Bay Trail.
• Improve transit access from Cutting Blvd to BART.
• Address railroad grade separation problems.
,
23rd Street
• Coordinate signal timing along 23rd Street.
• Consider undergrounding utilities.
• Improve bus transit connections.
El Portal
• Encourage the County to make planned improvements,especially left
turn lanes.
• Add sidewalks and trails.
Richmond Parkway
• Monitor Parkway's effectiveness at diverting traffic on 1-80 and other
routes.
• Experiment with new transit/design innovations.
• Support completion of the project.
• Monitor project progress-provide strong design input.
3,9
b
o0 .0 E E N r
aE a
10E oaoc'"
a> N.TN Np
CL O - y p C
w m._ U_a 2 E.E
O N
O N CD>"pC C 7 N
La-,
O
Id
�dd dUOe d $e c4 ` ornC>
mm E 3m Lu
maLEin
o ❑ ❑ ❑ ❑ ❑ ❑
r
� N
o' 3 E n
o
c m m LL0I.0
rn
a
ecO2N aC4
0CD UC y > N
OUC >>
e d'm
y > n .
UO u'Sain EE DU E 0N 8 CoUp� a. �o
i
T
f O e O N
Y '�
or v
i• E C E m m o y m a
o co
`0*a-m D a >Qg > >'� > c L U
In C >.0 C O 10 - O
>�cLi aEaymE
0 8
OU inw o Eoa) e-
E'
Y N
iNmim dA ,o3 cj,Lcv°i Ey Lwmfl acC Lmam
>o3 N O E ro 0 c a c
m >E
Q. �p q
2=QL0 CL h »` o adoZ E
CL
8 E No in c N
3 �
Z
02'y u- ;r co 5 rn 4 a
I. m
2 y O c 'O
Q _y uE dp
aa�o r
8r aim c
N C
O e A C d O N y
Q [5-p's r�a0i 4)om °d' 30 a cmo oa U
oc o 00
V f m�_ e u'Sc5 £no 2aw9
a a
N
'R CJ C C Nal
No N 3 a a E—>N 3 c
0. m m m m c v m
OY >
Ec
� . 8EQLU0
❑ E ❑ a o
CD
0 co
.00
«'
E � ase�
e nc cc
o o E8
I' o ❑ o ❑ o
o
> 9 CO OF� _ a
e CO e
N
tz ce >
CL 15 NON
l
N CC e N
�� �DooEE�m as
o ❑ o ❑ ❑ o
J
m C
y - N 7
WZU Ulz U~ 07Z OZ 0aaNL
�(7ui
Z Q2,LLI NO w2H 7
_ate_
f,
,
,
s
,
,
J
,
J
,
,
,
a
J
s
,
J
- J
,
J
J
FEt ,
.......::.......:::....
,
J
QQ ,
,
- J
\
s ............
80
F'
i
a
kEtk 1'
a
Y
S
4
i
n
4
` 3
i
I
l
r
� r
3
Y
Z
ort �bfa V apey F°f3
,..
Blvd O >
^mss 3
L >
i
Carlson Blvd
..
i
[�
o
ao N
24
r
4e_
'M
a
i
a
r
a
l
r
i
l Figure 3
Routes of Regional Significance
West County
Designated Routes of
For Further Study Regional Significance
(Preliminary List)
Contra Costa Transportation Authority
February 20, 1991
BLAYNEY
DYETT a
GREENBERG Urban and Re lbnal Planners
West Contra Costa County Transportation Advisory Comm. Pa¢e 5
Measure C Action Plan Development Workshop Summary `
I-80
• Determine the best"express transit" system along I-80.
• Determine the best phasing of improvements.
• Prepare origin/destination study to understand commute patterns.
• Consider freeway metering system options (mainline vs ramps).
• Study existing interchanges and off-on ramps.
• Support Albany interchange improvements.
1-580
• Monitor impacts of future job centers on I-580 (West County model).
• Study benefits of 23rd/Cutting&Richmond Parkway improvements on
I-580 traffic.
• Improve access from I-580 to employment/residential areas (e.g.,shuttles,
bus connections,etc.)
f
San Pablo Avenue
• Extend designation as State Highway.
• Improve signal timing throughout.
• Consider driveway restrictions.
• Develop uniform design standards.
• Improve bus!facilities (comfort,safety, access)
• Add more exclusive left turn lanes.
• Possibly encourage higher density housing along corridor.
San Pablo Dam Road/Camino Pablo
• Determine appropriateness as a regional route
• Study options to relieve traffic.
• Improve coordination with Orinda to reduce thru-traffic.
• Encourage/improve bicycle and pedestrian circulation.
• Possibly encourage higher density mixed use development.
Highway 4
• Improve safety along Willow Road in Hercules Area.
• Eliminate left turns. .
• Begin phasing improvements.
• Consider optimum land use patterns/density to support transit and
minimize traffic impact.
Committee members identified additional routes in need of further study to
determine their appropriateness as designated regional routes.
• Cummings Skyway
• Rumrill Blvd:
• Appian Way
• Carlson Blvd.
3, 1
Appenhop Agenda
*or
,5
,i
F
r:
West Contra Costa Transportation Advisory Committee February 11,1991
Action Plan Workshop
Agenda
9:00 I. Introduction
• Workshop Purpose
s Agenda Overview
9:10 II.� Overview of the Measure C Action Plan Requirements
9:30 III. Discussion of Action Plan Framework for West County
A. Goals
z B. Regional Routes
10:10 Break
10:20 III: Discussion of Action Plan Framework for West County
(continued)
C. Potential Actions That Address Each Regional Route
D. Other Supporting Strategies
11:55 IV.i Next Steps
12:00 Close
i
I
+:tea
Appendix B - ----
t., Wallgraphic plotoreductions produced during the Advisory Committee
;# workshop
j;
1
I-
1.
i
I
I
I.,
1
l
f
I%
I
4Ilk
o p L
f P O LL
U
a O U Q
o nca
i - F- N N
W CO C (D v
lit H
A4_
i OR W U F
n _
I � I
UA
Ej u
alp
i q 6
moA- .
�u