Loading...
HomeMy WebLinkAboutMINUTES - 06191990 - 1.4 TO: BOARD OF SUPERVISORS FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR DATE: June 19, 1990 SUBJECT: Program Supplement #072 which provides Federal Hazardous Elimination and Safety funding for preliminary engineering, right of way engineering, construction and construction engineering to install a left turn lane on Danville Boulevard at Hillgrade. Project No.: 0662-6R4090 SPECIFIC REQUEST(S) OR RECOMMENDATION(S) &BACKGROUND AND JUSTIFICATION I. Recommended Action: APPROVE and AUTHORIZE the Chairman of The Board of Supervisors to execute Program Supplement#072 which provides$81,090. in Hazardous Elimination and Safety (HES) funds for preliminary engineering, right of way engineering, construction and construction engineering to install a left turn lane on Danville Blvd. at Hillgrade. II. Financial Impact: The supplement provides reimbursement from HES funds for 90 percent of the County's estimated costs for the project. The county must provide. the remaining 10 percent of the funding for these items. III. Reasons for Recommendations and Background: Ori June 21, 1977 the board approved County-State Master Agreement No.04-5928 for the funding of Federal Aid Projects. On August 4, 1987 Contra Costa County qualified for Federal funds to install left turn lane on Danville Blvd. at Hillgrade. Caltrans and the Federal Highway Administration have determined that the County can be reimbursed for the County's estimated preliminary,engineering, construction and construction engineering costs for the project. The County Transportation Committee reviewed this item on June 18, 1990. < c Continued on Attachment: x SIGNATURE: _ RECOMMENDATION OF COUNTY ADMINISTRATOR _ RECOMMENDATION OF BOARD COMMITTEE APPROVE OTHER SIGNATURE(S): ACTION OF BOARD ON JUN I U MU APPROVED AS RECOMMENDED OTHER VOTE OF SUPERVISORS V UNANIMOUS (ABSENT ) AYES: NOES: ABSENT: ABSTAIN: I hereby certify that this is a mr. and correct copy of an action taken and entered on the minutes of the HB:kd Board of Supervisors on the date shown. c:B019.t6 ATTESTED: _.111N 19 1990 Orig. Div: Public Works (RE) PHIL BATCHELOR,Clerk of the Board cc: R. Gilchrist, Acct. ofs�,�ervlaa�sand CountyAdministraW or a ..Deputy Hazardous Elimination and Safety for construction June 19, 1990 Page two IV. Consequences of Negative Action: If this program supplement is not approved, the County will have to absorb the entire cost of preliminary engineering, construction and construction engineering for this project.