HomeMy WebLinkAboutMINUTES - 06121990 - 1.1 TO: BOARD.OF SUPERVISORS
FROM: J. MICHAEL WALFORD, PUBLIC WORKS DIRECTOR
DATE: June 12, 1990
SUBJECT: Contra Costa County's SB300 (Formerly S13140)
Project Applications,for 1990
SPECIFIC REQUEST(S) OR RECOMMENDATIONS) &BACKGROUND AND JUSTIFICATION
I. Recommended Action:
Authorize the Public Works Director to apply for State-Local Transportation Partnership program
funds for various road improvement projects.
11. Financial Imp act:
The eligible Area of Benefit and Measure "C" project costs can be reduced by as much as 15
percent.
III. Reasons for Recommendations and Background:
Senate Bill 300 approved by the State Legislature allocates $300 million of State funds to match
a portion of any road, highway or mass transit project state wide which will be constructed by
funds other than Federal or State funds.
Continued on Attachment: x SIGNATURE:
RECOMMENDATION OF COUNTY ADMINISTRATOR
_ RECOMMENDATION OF BOARD COMMITTEE
APPROVE OTHER
SIGNATURE(S):
ACTION OF BOARD ON JUN 12 1990 APPROVED AS RECOMMENDED OTHER
VOTE OF SUPERVISORS
✓ UNANIMOUS (ABSENT )
AYES: NOES:
ABSENT: ABSTAIN: j
i hereby certify that itis b a vue and corned copy of.'
HB:kd an action taken and entered on the miner;oUt1*,.
Board of Supervisors on the date shown.:.
ATTESTED: ,mN 1 2 1990
c:B012.t6 -
_ pHtt.BaTt:F_it10R,clerk oi_the Board �
Orig. Div: Public Works (R/E) at8u0a ois!md Adffdnb&W
cc: R. Gilchrist, Acct. `y '
s lij I ron..7
CCC SB300
June 12, 1990
Page two
Each project submitted to Caltrans will qualify provided that it increase capacity, extend service
or extend the life of the existing facility by ten years. All applications are due to Caltrans by June
30, 1990; all' contracts are to be awarded before June 30, 1991; and the project must be
completed by June 30, 1994.
The maximum amount of State match authorized under SB300 is 50 percent but since all
projects meeting the guidelines are eligible, we are estimating a 15 percent state match for each
project.
The following is a list of the projects which'SB300 funds will be applied for:
Construction State.
Project Costs Match Local Fund Source
A. Stone Valley Rd. $136,400 $20,500 Alamo Area of Benefit
Provide left turn
lane at St. Paul Dr.
B. State Route 4: $1,251,500 $187,700 Oakley/N. Brentwood
Widen,from SR160 Area of Benefit
to Big Break Road
C. State Route 4: $46,098,000 $6,913,400 Measure "C"
Widen and lower grade
at Willow Pass Summit
D. .Marsh Creek Curve $162,000 $24,300 East County
Realignment Area of Benefit
E. Willow Pass Road: = $1,384,000 $207,600 W. Pittsburg
Widen from Port Chicago Area of Benefit
l Highway to Bailey Road
F. Diamond Blvd: $5,194,800 $779,200 Pacheco Area of Benefit
Construct four lane road and Developer fees
from Marsh Drive to
Concord Avenue
The County Transportation Committee reviewed this on June 5, 1990.
IV. Consequences of Negative Action:
Possible loss of-$8,132,700 in State-Local Partnership funds.